IP Library Granted Patent US 9,954,346
Granted Patent B2
US 9,954,346 · App. 14/538,853 · Granted Apr 24, 2018

Facility for the processing of a multi-core cable

Inventors: Ivo Meierhans (Lucerne, CH); Carmelo Messina (Baar, CH)
Assignee: Schleuniger Holding AG
H02G1/1248Y10T29/49819Y10T29/53274
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,954,346
App. No.
14/538,853
Granted
Apr 24, 2018
Kind
B2
Abstract

A facility ( 1 ) processes multi-core cable ( 2 ) having a screening braid and/or foil sheathing, inner conductors ( 2 a ), and/or internal filler. The facility ( 1 ) includes stations ( 3, 5 - 10, 12 ) each for at least one respective processing step of cable stripping; the opening up, trimming, and folding back of any screening braid present; the removal of any foil present; and the removal of any internal filler present. A transport device transports cut-to-length cables to and from these stations ( 3, 5 - 10, 12 ). The transport system ( 13 ) connects stations ( 3, 5 - 10, 12 ). At least one control unit ( 17 ) may be provided, whereby all stations ( 3, 5 - 10, 12 ) may be automatically operated.

Claims (37)

1. A cable processing facility comprising:

a cable stripping station configured to strip therein at least one end of at least one cable segment;

a screening-braid opening station situated to receive cable segments after said cable stripping station;

a screening-braid trimming station situated to receive cable segments processed by said screening-braid opening station;

a screening-braid folding station in operative communication with said screening-braid trimming station;

a foil removal station situated to receive cable segments processed by said screening-braid folding station;

a circumferential cable alignment station situated to receive cable segments processed by said foil removal station and configured to detect a circumferential position of a cable end portion and to rotate the cable end portion around its longitudinal axis to a desired circumferential position, if different therefrom, to thereby circumferentially align the cable end portion;

a filler removal station situated to receive cable segments circumferentially aligned by said circumferential cable alignment station;

an automated transporter configured to controllably transport cable segments, and said automated transporter being controlled by a control unit to controllably transport cable segments to and from said circumferential cable alignment station;

a sensor arrangement at said circumferential cable alignment station; and

said sensor arrangement including a color recognition device, and said color recognition device having an observation offset at an angle of between 20° and 75° relative to a two-conductor plane of repose for processed cable.

2. The cable processing facility as claimed in claim 1 , wherein said automated transporter is controlled by said control unit to controllably transport cable segments from all of said stations.

3. The cable processing facility as claimed in claim 2 , further comprising a track included in said automated transporter, said track operatively communicating all of said stations.

4. The cable processing facility as claimed in claim 1 , further comprising:

a track included in said automated transporter; and

at least one transport pallet mounted to travel on said track to transport cable segments.

5. The cable processing facility as claimed in claim 1 , wherein said color recognition device is offset at an angle of 45° relative to the two-conductor plane of repose for processed cable.

6. The cable processing facility as claimed in claim 1 , further comprising a color camera included in said sensor arrangement.

7. The cable processing facility as claimed in claim 1 , wherein said screening-braid opening station and said screening-braid trimming station are combined as one unitary station.

8. The cable processing facility as claimed in claim 1 , wherein said screening-braid trimming station and said screening-braid folding station are combined as one unitary station.

9. The cable processing facility as claimed in claim 1 , further comprising a crimping station configured to crimp a support sleeve, said crimping station being situated between said cable stripping station and said screening-braid opening station.

10. The cable processing facility as claimed in claim 1 , further comprising a quality control station situated before said foil removal station.

11. The cable processing facility as claimed in claim 1 , further comprising a quality control station situated after said foil removal station.

12. The cable processing facility as claimed in claim 1 , further comprising a quality control station situated after said circumferential cable alignment station.

13. A cable processing facility comprising:

a cable stripping station configured to strip therein at least one end of at least one cable segment;

a screening-braid opening station situated to receive cable segments after said cable stripping station;

a screening-braid trimming station situated to receive cable segments processed by said screening-braid opening station;

a foil removal station situated to receive cable segments processed by said screening-braid trimming station;

a circumferential cable alignment station situated to receive cable segments processed by said foil removal station and configured to detect a circumferential position of a cable end portion and to rotate the cable end portion around its longitudinal axis to a desired circumferential position, if different therefrom, to thereby circumferentially align the cable end portion;

an automated transporter configured to controllably transport cable segments, said automated transporter being controlled by a control unit to controllably transport cable segments to and from said circumferential cable alignment station;

a sensor arrangement at said circumferential cable alignment station; and

said sensor arrangement including a color recognition device, and said color recognition device has an observation direction offset at an angle of 45° relative to a two-conductor plane of repose for a processed cable.

14. The cable processing facility as claimed in claim 13 , wherein said screening-braid opening station and said screening-braid trimming station are combined as one unitary station.

15. The cable processing facility as claimed in claim 13 , further comprising a screening-braid folding station being combined as one unitary station with said screening-braid trimming station.

16. The cable processing facility as claimed in claim 13 , further comprising a filler removal station situated to receive cable segments circumferentially aligned by said circumferential cable alignment station.

17. The cable processing facility as claimed in claim 13 , wherein said color recognition device at said circumferential cable alignment station is a color camera.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 19, 2018
From: MEIERHANS, IVO; MESSINA, CARMELO
To: SCHLEUNIGER HOLDING AG
Reel/Frame 045265/0484 →
Priority Claims (1)
EP 13192380 · Nov 11, 2013 · regional
Continuity (1)
Related Publication 20150128399A1 · May 14, 2015