IP Library › Granted Patent US 9,957,787
Granted Patent B2
US 9,957,787 · App. 14/887,693 · Granted May 1, 2018

Method of enhanced oil recovery from lateral wellbores

Inventor: Lloyd Murray Dallas (Streetman, TX)
E21B43/16E21B7/06E21B33/12E21B33/14E21B43/11E21B43/305
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,957,787
App. No.
14/887,693
Granted
May 1, 2018
Kind
B2
Abstract

Enhanced oil recovery is practiced in long lateral wellbores by drilling at least one of a sidetrack lateral wellbore end a branch lateral wellbore from the main lateral wellbore. After production of the sidetrack lateral wellbore or the branch lateral wellbore, EOR flood fluid is pumped info the at least one of the sidetrack lateral wellbore and the branch lateral wellbore and recovered hydrocarbons and EOR flood fluid are produced from the main lateral wellbore, or vice versa.

Claims (34)

1. A method of enhanced oil recovery (EOR) from a cased and cemented main lateral wellbore, comprising:

setting a packer in the main lateral wellbore;

drilling at least one sidetrack lateral wellbore spaced from the main lateral wellbore, casing and cementing the, sidetrack lateral wellbore;

perforating and stimulating a first section of the sidetrack lateral wellbore, the first section having a length of less than a total length of the sidetrack lateral wellbore, and producing hydrocarbons from the first section;

removing the packer from the main lateral wellbore;

running production tubing and a packer into the main lateral wellbore and setting the packer in the main lateral wellbore;

injecting EOR flood fluid down an annulus of a vertical section of the main lateral wellbore and into the sidetrack lateral wellbore; and

producing hydrocarbons comingled with EOR flood fluid up the production tubing in the main lateral wellbore while injecting the EOR flood fluid;

pulling the packer and production tubing from the main lateral wellbore;

setting a packer to seal off the first section of the sidetrack lateral wellbore; and

perforating and stimulating a next section of the sidetrack lateral wellbore and producing hydrocarbons from the next section of the sidetrack lateral wellbore.

2. The method as claimed in claim 1 , further comprising:

running the packer and the production tubing back into the main, lateral wellbore and setting the packer; and

injecting EOR flood fluid down an annulus of a vertical section of the main lateral wellbore and into the sidetrack lateral wellbore and producing the hydrocarbons comingled with the EOR flood fluids from the production tubing in the main lateral wellbore.

3. The method as claimed in claim 2 , further comprising:

repeating the steps of setting a packer, perforating and stimulating, producing hydrocarbons, injecting EOR flood fluid and producing hydrocarbon and EOR flood fluid until an entire length of the sidetrack lateral wellbore has been produced and enhanced oil recovery is complete.

4. The method as claimed in claim 1 wherein drilling the at least one sidetrack lateral wellbore comprises drilling the at least one sidetrack lateral wellbore substantially parallel to the main lateral wellbore and spaced from the main lateral wellbore by a predetermined distance.

5. The method as claimed in claim 4 wherein the predetermined distance is dependent on at least a porosity of a production zone in which the main lateral wellbore is drilled.

6. A method of enhanced oil recovery (EOR) from a cased and cemented main lateral wellbore, comprising:

perforating, stimulating and flowing back a first section of the main lateral wellbore, the first section having a length less than a total length of the main lateral wellbore, and producing hydrocarbons from the first section of the main lateral wellbore;

drilling at least one branch lateral wellbore in an unperforated region of the main lateral wellbore adjacent the perforations of the first section of the main lateral well bore;

casing and cementing the at least one branch lateral wellbore;

perforating, stimulating and flowing back the at least one branch lateral wellbore and producing hydrocarbons from the at least, one branch lateral wellbore;

running production tubing and a packer into the main lateral wellbore and setting the packer to isolate the main lateral wellbore from the at least one branch lateral wellbore; and

injecting EOR flood fluid down an annulus of a vertical section of the main lateral wellbore, an unperforated section of the main lateral wellbore and into the at least one branch lateral wellbore, and producing hydrocarbons comingled with EOR flood fluid up the production tubing;

setting a packer in the main lateral wellbore to isolate the main lateral wellbore from the at least one branch lateral wellbore;

perforating, stimulating and flowing back a next section of the main lateral wellbore, the next section haying a length less than a total length of the main lateral wellbore, and producing hydrocarbons from the next section of the main lateral wellbore;

drilling at least one branch lateral wellbore in an unperforated region of the main lateral wellbore adjacent the perforations of the next section of the main lateral well bore, casing and cementing the at least one branch lateral wellbore;

perforating, stimulating and flowing back the at least one branch lateral wellbore and producing hydrocarbons from the at least one branch lateral wellbore;

running production tubing and a packer into the main lateral wellbore and setting the packer to isolate the main lateral wellbore from the at least one branch lateral wellbore; and

injecting EOR flood fluid down an annulus of a vertical section of the main lateral wellbore and into the at least one branch lateral wellbore, and producing hydrocarbon comingled with EOR flood fluid up the production tubing in the main lateral wellbore while injecting the EOR flood fluid.

7. The method as claimed in claim 6 wherein setting the packer to isolate the main lateral wellbore from the at least one branch lateral wellbore comprises setting the packer in the main lateral wellbore between the at least one branch lateral wellbore and perforations of the next section of the main lateral wellbore.

8. The method as claimed in claim 6 wherein setting the packer to isolate the main lateral wellbore from the at least one branch lateral wellbore comprises setting a custom packer unit in the main lateral wellbore, the custom packer unit comprising a first packer set in the main lateral wellbore up-hole from the at least one branch lateral wellbore, a second packer set between the at least one branch lateral wellbore and perforations of the next section of the main lateral wellbore, a tubing having open ends that runs through the first and second packers, and the production tubing run through only the first packer.

9. The method as claimed in claim 6 wherein producing hydrocarbon comingled with EOR flood fluid comprises providing lift assistance to lift the hydrocarbons and comingled flood fluid form the main lateral wellbore.

Continuity (1)
Related Publication 20170107805A1 · Apr 20, 2017