IP Library Granted Patent US 9,983,603
Granted Patent B2
US 9,983,603 · App. 13/811,961 · Granted May 29, 2018

Boost converter and method for its operation

Inventors: Thomas Knorpp (Freiberg, DE); Michael Ruffer (Ludwigsburg, DE); Stephan Binhack (Karlsruhe, DE); Wolfgang Mollenkopf (Pfullingen, DE)
Assignee: ROBERT BOSCH GMBH
G05F1/46H02M3/156H02M2001/0003H02M2001/0022
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,983,603
App. No.
13/811,961
Granted
May 29, 2018
Kind
B2
Abstract

In a boost converter operation, a first voltage that is independent of an input voltage of the boost converter is preset in the boost converter, having an increased voltage level compared to the input voltage, as the setpoint output voltage, as long as the input voltage is below a first voltage threshold value, which is lower than the first voltage. As soon as the input voltage exceeds the first voltage threshold value, a second voltage that is a function of the input voltage is preset, having a lower voltage level compared to the input voltage, as the setpoint output voltage. As soon as the input voltage drops below a second voltage threshold value, which is lower than the first voltage, the first voltage is again preset as the setpoint output voltage.

Claims (7)

1. A method of for operating a boost converter, comprising:

setting in the boost converter a first voltage, which is independent of an input voltage of the boost converter and having a higher voltage level than the input voltage, as a setpoint output voltage as long as the input voltage is below a first voltage threshold value which is at lower voltage level than the first voltage;

setting in the boost converter a second voltage, which is a function of the input voltage of the boost converter and having a lower voltage level than the input voltage, as the setpoint output voltage as soon as the input voltage exceeds the first voltage threshold value; and

setting the first voltage in the boost converter as the setpoint output voltage as soon as the input voltage falls below a second voltage threshold value which is at a lower voltage level than the first voltage.

2. The method as recited in claim 1 , wherein the first and second voltage threshold values are established as a function of the first voltage.

3. The method as recited in claim 2 , wherein the second voltage threshold value is at a lower voltage level than the first voltage threshold value.

4. The method as recited in claim 2 , wherein the second voltage lies below the input voltage by a specified amount.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 10, 2013
From: KNORPP, THOMAS; RUFFER, MICHAEL; BINHACK, STEPHAN; MOLLENKOPF, WOLFGANG
To: ROBERT BOSCH GMBH
Reel/Frame 030395/0312 →
Priority Claims (1)
DE 10-2010-038-489 · Jul 27, 2010 · national
Continuity (1)
Related Publication 20130234683A1 · Sep 12, 2013