IP Library › Granted Patent US 10,039,026
Granted Patent B2
US 10,039,026 · App. 15/173,622 · Granted Jul 31, 2018

Method and apparatus for controlling inter-beam interference

Inventor: JungSook Bae (Daejeon, KR)
Assignee: ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE
H04W28/02H04W16/28H04W16/10H04W28/0247H04W52/0206H04W72/046
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,039,026
App. No.
15/173,622
Granted
Jul 31, 2018
Kind
B2
Abstract

A base station that runs a plurality of beams calculates the sum of proportional fairness metrics for each of terminals scheduled for resource allocation in the beams, creates a beam muting list based on the sum of proportional fairness metrics for each beam, and mutes the beams in the beam muting list for blocking power.

Claims (24)

1. A method for controlling inter-beam interference by a base station that runs a plurality of beams, the method comprising:

calculating a sum of proportional fairness metrics for each of terminals scheduled for resource allocation in the plurality of beams;

predicting a base station capacity after muting beams for which the sum of proportional fair metrics is 0, and setting the predicted base station capacity as a current base station capacity;

predicting the base station capacity after muting beams other than those for which the sum of proportional fairness metrics is 0, in order of a lowest to highest sum of proportional fairness metrics, and setting the predicted base station capacity as an expected base station capacity for each beam;

creating a beam muting list including beams that power is blocked, based on the expected base station capacity for each beam and the current base station capacity; and

muting the beams in the beam muting list for blocking power.

2. The method of claim 1 , wherein the creating comprises:

comparing a difference between the expected base station capacity for each beam and the current base station capacity with a set threshold; and

selecting beams to add to the beam muting list based on a result of the comparing.

3. The method of claim 2 , wherein the selecting comprising, if the difference between the expected base station capacity for each beam and the current base station capacity is greater than the set threshold, adding said each beam to the beam muting list.

4. The method of claim 2 , wherein the creating further comprising adding the beams for which the sum of proportional fairness metrics is 0 to the beam muting list.

5. The method of claim 2 , wherein the base station capacity is predicted by adding a sum of data rates for non-muted beams and a predicted increase in data rate due to muted beams.

6. The method of claim 1 , wherein the plurality of beams each have a fixed beam region in which a same frequency is used.

7. An apparatus for controlling inter-beam interference by a base station that runs a plurality of beams, the apparatus comprising:

a plurality of beam schedulers that calculate a sum of proportional fairness metrics for each of terminals scheduled for resource allocation in the plurality of beams;

a control scheduler that

predicts a base station capacity after muting beams for which the sum of proportional fair metrics is 0 and sets the predicted base station capacity as a current base station capacity,

predicts the base station capacity after muting beams other than those for which the sum of proportional fairness metrics is 0 in order of a lowest to highest sum of proportional fairness metrics and sets the predicted base station capacity as an expected base station capacity for each beam, and

creates a beam muting list including beams that power is blocked, based on the expected base station capacity for each beam and the current base station capacity; and

a transceiver that mutes the beams in the beam muting list for blocking power.

8. The apparatus of claim 7 , wherein the control scheduler compares a difference between the expected base station capacity for each beam and the current base station capacity with a set threshold and selects beams to add to the beam muting list.

9. The apparatus of claim 8 , wherein the control scheduler adds the beams for which the sum of proportional fairness metrics is 0 to the beam muting list.

10. The apparatus of claim 8 , wherein the control scheduler predicts the base station capacity by adding a sum of data rates for non-muted beams and a predicted increase in data rate due to muted beams.

11. The apparatus of claim 7 , wherein the plurality of beams each have a fixed beam region in which a same frequency is used.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 4, 2016
From: BAE, JUNGSOOK
To: ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE
Reel/Frame 038808/0961 →
Priority Claims (1)
KR 10-2015-0079462 · Jun 4, 2015 · national
Continuity (1)
Related Publication 20160360536A1 · Dec 8, 2016
Cited By (1)
US 12,543,173