IP Library › Granted Patent US 10,060,230
Granted Patent B2
US 10,060,230 · App. 15/023,554 · Granted Aug 28, 2018

Gravel pack assembly having a flow restricting device and relief valve for gravel pack dehydration

Inventors: Jean Marc Lopez (Plano, TX); Stephen M. Greci (Little Elm, TX); Gregory S. Cunningham (Grapevine, TX)
Assignee: HALLIBURTON ENERGY SERVICES, INC.
E21B43/045E21B34/06E21B43/08E21B43/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,060,230
App. No.
15/023,554
Granted
Aug 28, 2018
Kind
B2
Abstract

Described herein are gravel pack assemblies capable of performing complete gravel pack jobs when flow restricting devices, such as inflow control devices (“ICD”), are utilized. A gravel pack assembly includes a well screen attached to a flow restricting device and a relief valve. The relief valve is positioned in parallel with the flow restricting device so that the relief valve may provide an alternative path for fluid during dehydration of the gravel pack slurry, thus allowing extra fluid flow through the completion string during the gravel pack operation only.

Claims (51)

1. A gravel pack assembly positioned along a downhole string, comprising:

a well screen;

a flow restricting device in fluid communication with the well screen to thereby control fluid flow through the well screen; and

a relief valve in fluid communication with the well screen and set to open at a pressure sufficient to dehydrate gravel pack slurry to thereby provide an alternative path for gravel pack fluid during a gravel pack operation.

2. A gravel pack assembly as defined in claim 1 , wherein the flow restricting device is an inflow control device, an adjustable inflow control device, or an autonomous inflow control device.

3. A gravel pack assembly as defined in claim 1 , wherein:

the flow restricting device is positioned at a first end of the well screen; and

the relief valve is position at a second end of the well screen opposite the first end, thereby forming a fluid passageway between the flow restricting device and relief valve.

4. A gravel pack assembly as defined in claim 3 , wherein:

the flow restricting device comprises:

an inlet port in fluid communication with the fluid passageway; and

an outlet port in fluid communication with a bore of the downhole string; and the relief valve comprises:

an inlet port in fluid communication with the fluid passageway; and

an outlet port in fluid communication with the bore of the downhole string.

5. A gravel pack assembly as defined in claim 4 , wherein the relief valve further comprises:

a piston in fluid communication with the inlet port of the relief valve; and

a spring that biases the piston in a position which prevents fluid flow through the outlet port of the relief valve.

6. A gravel pack assembly as defined in claim 1 , wherein the pressure sufficient to dehydrate gravel pack slurry is 500 psi-1000 psi.

7. A gravel pack assembly as defined in claim 1 , wherein the relief valve is set to close during production of well fluids.

8. A method for gravel packing a well, the method comprising:

deploying a gravel pack assembly along a downhole string, the gravel pack assembly comprising:

a well screen;

a flow restricting device in fluid communication with the well screen to thereby control fluid flow through the well screen; and

a relief valve in fluid communication with the well screen to thereby provide an alternative path for gravel pack fluid during a gravel pack operation;

flowing a gravel pack slurry about the well screen;

opening the relief valve by applying a pressure to the relief valve sufficient to dehydrate the gravel pack slurry;

flowing the gravel pack fluid of the gravel pack slurry through the well screen and the relief valve, and into a bore of the downhole string.

9. A method as defined in claim 8 , wherein flowing the gravel pack slurry further comprises flowing the gravel pack fluid through the flow restricting device.

10. A method as defined in claim 8 , further comprising:

closing the relief valve; and

producing production fluid through the flow restricting device.

11. A method as defined in claim 10 , wherein closing the relief valve comprises reducing a pressure applied to the relief valve.

12. A method for gravel packing a well, the method comprising:

deploying a gravel pack assembly along a downhole string, the gravel pack assembly comprising:

a well screen;

a flow restricting device and

a relief valve;

flowing a gravel pack slurry about the well screen and relief valve;

flowing at least a portion of the gravel pack slurry through the relief valve and into a bore of the downhole string;

reducing a pressure applied to the relief valve;

closing the relief valve in response to the reduced pressure; and

producing well fluids through the flow restricting device and into the bore of the downhole string.

13. A method as defined in claim 12 , wherein flowing at least a portion of the gravel pack slurry through the relief valve further comprises:

applying a pressure to the relief valve sufficient to dehydrate the gravel pack slurry; and

opening the relief valve in response to the pressure, thus allowing at least a portion of the gravel pack slurry to flow into the bore of the downhole string.

14. A method as defined in claim 12 , further comprising flowing at least a portion of the gravel pack slurry through the flow restricting device and into the bore of the downhole string.

15. A method as defined in claim 12 , wherein flowing at least a portion of the gravel pack slurry through the relief valve further comprises opening the relief valve to establish fluid communication into the bore of the downhole string.

16. A method as defined in claim 15 , further comprising:

closing the relief valve; and

producing well fluids through the flow restricting device and into the bore of the downhole string.

17. A method as defined in claim 12 , wherein the flow restricting device is an inflow control device, an adjustable inflow control device, or an autonomous inflow control device.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 21, 2016
From: LOPEZ, JEAN MARC; GRECI, STEPHEN M.; CUNNINGHAM, GREGORY S.
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 038053/0696 →
Continuity (1)
Related Publication 20160215595A1 · Jul 28, 2016