IP Library Granted Patent US 10,172,166
Granted Patent B2
US 10,172,166 · App. 15/509,157 · Granted Jan 1, 2019

Method and apparatus for handling E-RAB switch problem for dual connectivity in wireless communication system

Inventors: Jian Xu (Seoul, KR); Daewook Byun (Seoul, KR)
Assignee: LG ELECTRONICS INC.
H04W76/062H04W36/0033H04W36/0055H04W36/14H04W48/18H04W76/32H04W76/34
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,172,166
App. No.
15/509,157
Granted
Jan 1, 2019
Kind
B2
Abstract

A method and apparatus for handling evolved universal terrestrial radio access network (E-UTRAN) radio access bearer (E-RAB) switch failure for dual connectivity in a wireless communication system is provided. A master evolved NodeB (MeNB) in dual connectivity receives an E-RAB modification confirm message including a list of E-RABs failed to be modified from a mobility management entity (MME). The MeNB may keep old general packet ratio service (GPRS) tunneling protocol (GTP) tunnels for the failed E-RABs, and trigger a secondary eNB (SeNB) release procedure or a SeNB modification procedure for releasing the failed E-RABs. Alternatively, the MeNB may trigger an E-RAB release procedure for releasing the failed E-RABs.

Claims (22)

1. A method for handling, by a master evolved NodeB (MeNB) in dual connectivity, evolved universal terrestrial radio access network (E-UTRAN) radio access bearer (E-RAB) switch failure for dual connectivity in a wireless communication system, the method comprising:

receiving an E-RAB modification confirm message including a list of E-RABs failed to be modified from a mobility management entity (MME);

keeping old general packet radio service (GPRS) tunneling protocol (GTP) tunnels for the E-RABs failed to be modified; and

triggering a secondary eNB (SeNB) release procedure or a SeNB modification procedure for releasing secondary cell group (SCG) bearers corresponding to the E-RABs failed to be modified.

2. The method of claim 1 , wherein the E-RAB modification confirm message further includes an indication of keeping the old GTP tunnels for the E-RABs failed to be modified.

3. The method of claim 1 , wherein the E-RAB modification confirm message further includes a cause value for the failure.

4. The method of claim 1 , wherein a user equipment (UE) is connected to both the MeNB and a SeNB in the dual connectivity.

5. The method of claim 1 , further comprising transmitting an E-RAB modification indication message to the MME.

6. The method of claim 5 , wherein the E-RAB modification indication message includes both a list of E-RABs to be modified and a list of E-RABs not to be modified.

7. The method of claim 5 , wherein the E-RAB modification indication message includes an indication of whether a SCG bearer is added to a SeNB or the SCG bearer is taken from the SeNB.

8. A master evolved NodeB (MeNB) configured to handle, in dual connectivity, evolved universal terrestrial radio access network (E-UTRAN) radio access bearer (E-RAB) switch failure for dual connectivity in a wireless communication system, the MeNB comprising:

a transceiver; and

a processor operatively connected to the transceiver and configured to:

receive an E-RAB modification confirm message including a list of E-RABs failed to be modified from a mobility management entity (MME);

keep old general packet radio service (GPRS) tunneling protocol (GTP) tunnels for the E-RABs failed to be modified; and

trigger a secondary eNB (SeNB) release procedure or a SeNB modification procedure for releasing secondary cell group (SCG) bearers corresponding to the E-RABs failed to be modified.

9. The MeNB of claim 8 , wherein the E-RAB modification confirm message further includes an indication of keeping the old GTP tunnels for the E-RABs failed to be modified.

10. The MeNB of claim 8 , wherein the E-RAB modification confirm message further includes a cause value for the failure.

11. The MeNB of claim 8 , wherein a user equipment (UE) is connected to both the MeNB and a SeNB in the dual connectivity.

12. The MeNB of claim 8 , wherein the processor is configured to transmit an E-RAB modification indication message to the MME.

13. The MeNB of claim 12 , wherein the E-RAB modification indication message includes both a list of E-RABs to be modified and a list of E-RABs not to be modified.

14. The MeNB of claim 12 , wherein the E-RAB modification indication message includes an indication of whether a SCG bearer is added to a SeNB or the SCG bearer is taken from the SeNB.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2017
From: XU, JIAN; BYUN, DAEWOOK
To: LG ELECTRONICS INC.
Reel/Frame 041478/0277 →
Continuity (2)
Provisional Application 62064978 · Oct 16, 2014
Related Publication 20170280501A1 · Sep 28, 2017