IP Library Granted Patent US 10,251,099
Granted Patent B2
US 10,251,099 · App. 15/656,506 · Granted Apr 2, 2019

Method and apparatus for enhancing inter-MeNB handover without SeNB change in wireless communication system

Inventors: Jian Xu (Seoul, KR); Daewook Byun (Seoul, KR); Jaewook Lee (Seoul, KR)
Assignee: LG ELECTRONICS INC.
H04W36/0027H04W36/0069H04W36/08H04W88/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,251,099
App. No.
15/656,506
Granted
Apr 2, 2019
Kind
B2
Abstract

In an inter-master eNB (MeNB) handover procedure without secondary eNB (SeNB) change, a user equipment (UE) receives a SeNB kept indicator indicating that a SeNB has been kept successfully from a source MeNB. Upon receiving the SeNB kept indicator, the UE determines that the SeNB has been kept successfully in the inter-MeNB handover without SeNB change, and skips the random access procedure to the SeNB.

Claims (21)

1. A method for a user equipment (UE) in a wireless communication system, the method comprising:

receiving, by the UE from a source master eNB (MeNB), a information informing that a secondary eNodeB (SeNB) has been kept successfully in an inter-MeNB handover without SeNB change;

determining, by the UE, that the SeNB has been kept successfully in the inter-MeNB handover without SeNB change based on the information; and

skipping, by the UE, a random access procedure to the SeNB based on the determining that the SeNB has been kept successfully in the inter-MeNB handover without SeNB change.

2. The method of claim 1 , wherein the information is received via a radio resource control (RRC) connection reconfiguration message.

3. The method of claim 2 , wherein the RRC connection reconfiguration message includes a new configuration, which includes a configuration of a target MeNB and a configuration of the SeNB.

4. The method of claim 2 , wherein the RRC connection reconfiguration message includes cell identifiers (IDs) of a master cell group (MCG) and cell IDs of the SeNB.

5. The method of claim 4 , wherein the cell IDs corresponds to one of an E-UTRAN cell global ID (ECGI) or a physical cell ID (PCI).

6. The method of claim 4 , further comprising determining, by the UE, that the SeNB has been kept successfully in the inter-MeNB handover without SeNB change, by comparing the cell IDs of the SeNB with cell IDs used before the inter-MeNB handover without SeNB change.

7. A user equipment (UE) in a wireless communication system, the UE comprising:

a memory;

a transceiver; and

a processor, coupled to the memory and the transceiver, that:

controls the transceiver to receive, from a source master eNB (MeNB), information informing that a secondary eNodeB (SeNB) has been kept successfully in an inter-master eNB (MeNB) handover without SeNB change,

determines that the SeNB has been kept successfully in the inter-MeNB handover without SeNB change based on the information, and

skips a random access procedure to the SeNB based on the determining that the SeNB has been kept successfully in the inter-MeNB handover without SeNB change.

8. The UE of claim 7 , wherein the information is received via a radio resource control (RRC) connection reconfiguration message.

9. The UE of claim 8 , wherein the RRC connection reconfiguration message includes a new configuration, which includes a configuration of a target MeNB and a configuration of the SeNB.

10. The UE of claim 8 , wherein the RRC connection reconfiguration message includes cell identifiers (IDs) of a master cell group (MCG) and cell IDs of the SeNB.

11. The UE of claim 10 , wherein the cell IDs corresponds to one of an E-UTRAN cell global ID (ECGI) or a physical cell ID (PCI).

12. The UE of claim 10 , wherein the processor further determines that the SeNB has been kept successfully in the inter-MeNB handover without SeNB change, by comparing the cell IDs of the SeNB with cell IDs used before the inter-MeNB handover without SeNB change.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2017
From: XU, JIAN; BYUN, DAEWOOK; LEE, JAEWOOK
To: LG ELECTRONICS INC.
Reel/Frame 043440/0843 →
Continuity (2)
Provisional Application 62365393 · Jul 22, 2016
Related Publication 20180027457A1 · Jan 25, 2018