IP Library Granted Patent US 10,253,397
Granted Patent B2
US 10,253,397 · App. 14/779,755 · Granted Apr 9, 2019

Pearlitic rail and method for manufacturing pearlitic rail

Inventors: Tatsumi Kimura (Tokyo, JP); Kiyoshi Uwai (Tokyo, JP); Shigeru Endo (Tokyo, JP); Moriyasu Yamaguchi (Tokyo, JP)
Assignee: JFE Steel Corporation
C22C38/28C21D6/001C21D6/002C21D6/005C21D6/008C21D8/00C21D8/005C21D9/04C22C38/00C22C38/001C22C38/002C22C38/005C22C38/02C22C38/04C22C38/06C22C38/08C22C38/12C22C38/14C22C38/16C22C38/18C22C38/22C22C38/24C22C38/26C22C38/50C21D2211/009
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,253,397
App. No.
14/779,755
Granted
Apr 9, 2019
Kind
B2
Abstract

A pearlitic rail includes a composition including in % by mass: 0.70% to 0.90% of C; 0.1% to 1.5% of Si; 0.01% to 1.5% of Mn; 0.001% to 0.035% of P; 0.0005% to 0.030% of S; 0.1% to 2.0% of Cr, remainder of the composition consisting of Fe and inevitable impurities. Surface hardness of a rail top is not less than HB 430, and hardness at a depth of 25 mm from a surface of the rail top is not less than HB 410.

Claims (10)

1. A method of manufacturing a pearlitic rail, the method comprising:

hot rolling a billet having a composition including in % by mass: 0.70% to 0.90% of C; 0.1% to 1.5% of Si; 0.01% to 1.5% of Mn; 0.001% to 0.035% of P; 0.0005% to 0.030% of S; 0.1% to 2.0% of Cr, remainder of the composition consisting of Fe and inevitable impurities, so as to achieve a finishing rolling temperature of not lower than 900° C. to form a rail material; and

cooling the rail material in an accelerated manner at a cooling rate of 2° C./s to 30° C./s from a temperature of 770° C. to 500° C., reheating the rail material or subjecting the rail material to secondary heating to a temperature within a range of 530° C. to 580° C., holding the rail material within the range of 530° C. to 580° C. for 20 s to 100 s, and cooling the rail material in an accelerated manner at a cooling rate of 2° C./s to 10° C./s to a temperature within a range of not higher than 450° C.

2. The method of manufacturing a pearlitic rail according to claim 1 , further comprising terminating the accelerated cooling performed at a cooling rate of 2° C./s to 10° C./s, at a temperature within a range of 350° C. to 450° C., and then slowly cooling the rail material at a cooling rate of not more than 0.5° C./s.

3. The method of manufacturing a pearlitic rail according to claim 1 , wherein the composition of the billet further includes in % by mass one or both of: not more than 0.010% of Ca; and not more than 0.1% of REM.

4. The method of manufacturing a pearlitic rail according to claim 3 , further comprising terminating the accelerated cooling performed at a cooling rate of 2° C./s to 10° C./s, at a temperature within a range of 350° C. to 450° C., and then slowly cooling the rail material at a cooling rate of not more than 0.5° C./s.

5. The method of manufacturing a pearlitic rail according to claim 1 , wherein the composition of the billet further includes in % by mass at least one of: not more than 0.15% of V; not more than 0.030% of Nb; not more than 1.0% of Cu; not more than 0.5% of Ni; and not more than 0.5% of Mo.

6. The method of manufacturing a pearlitic rail according to claim 5 , further comprising terminating the accelerated cooling performed at a cooling rate of 2° C./s to 10° C./s, at a temperature within a range of 350° C. to 450° C., and then slowly cooling the rail material at a cooling rate of not more than 0.5° C./s.

7. The method of manufacturing a pearlitic rail according to claim 5 , wherein the composition of the billet further includes in % by mass one or both of: not more than 0.010% of Ca; and not more than 0.1% of REM.

8. The method of manufacturing a pearlitic rail according to claim 7 , further comprising terminating the accelerated cooling performed at a cooling rate of 2° C./s to 10° C./s, at a temperature within a range of 350° C. to 450° C., and then slowly cooling the rail material at a cooling rate of not more than 0.5° C./s.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 22, 2015
From: KIMURA, TATSUMI; UWAI, KIYOSHI; ENDO, SHIGERU; YAMAGUCHI, MORIYASU
To: JFE STEEL CORPORATION
Reel/Frame 037351/0044 →
Priority Claims (1)
JP 2013-067168 · Mar 27, 2013 · national
Continuity (1)
Related Publication 20160083820A1 · Mar 24, 2016
Cited By (5)
US 12,186,822 US 12,221,660 US 12,312,645 US 12,534,772 US 12,534,787