IP Library › Granted Patent US 10,273,659
Granted Patent B2
US 10,273,659 · App. 15/556,016 · Granted Apr 30, 2019

Hydraulic drive system of construction machine

Inventor: Akihiro Kondo (Nishinomiya, JP)
Assignee: KAWASAKI JUKOGYO KABUSHIKI KAISHA
E02F9/2225E02F9/2004E02F9/2282E02F9/2285F15B11/00F15B13/0401F15B13/0442E02F9/2292E02F9/2296F15B2211/3116F15B2211/45
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,273,659
App. No.
15/556,016
Granted
Apr 30, 2019
Kind
B2
Abstract

A hydraulic drive system of a construction machine includes: a control valve configured such that an opening area of a center bypass passage gradually decreases in accordance with increase in an operation signal; an operation device that outputs the operation signal; a bleed-off line; and a bleed-off valve that includes a pilot port to which a secondary pressure from a solenoid proportional valve is led, the bleed-off valve being configured such that: a bypass passage is open until the operation signal exceeds a first setting value, and the bypass passage is closed when the operation signal exceeds the first setting value; and an unloading passage is opened when the operation signal exceeds a second setting value, and an opening area of the unloading passage gradually decreases until the operation signal that has exceeded the second setting value reaches a third setting value.

Claims (14)

1. A hydraulic drive system of a construction machine, the hydraulic drive system comprising:

a circulation line extending from a pump to a tank;

a control valve disposed on the circulation line and controlling supply and discharge of hydraulic oil to and from an actuator;

an operation device that receives an operation for moving the actuator and that outputs an operation signal corresponding to an amount of the operation;

a bleed-off line that branches off from the circulation line at a position upstream of the control valve and that extends to the tank;

a solenoid proportional valve that outputs a secondary pressure indicating a positive correlation with the operation signal; and

a bleed-off valve that includes a pilot port to which the secondary pressure from the solenoid proportional valve is led, a bypass passage forming a part of the circulation line, and an unloading passage forming a part of the bleed-off line, the bleed-off valve being configured such that:

the bypass passage is open until the operation signal exceeds a first setting value, and the bypass passage is closed when the operation signal exceeds the first setting value; and

the unloading passage is opened when the operation signal exceeds a second setting value that is not greater than the first setting value, and an opening area of the unloading passage gradually decreases until the operation signal that has exceeded the second setting value reaches a third setting value, wherein

the control valve is configured such that an opening area of a center bypass passage forming a part of the circulation line gradually decreases in accordance with increase in the operation signal.

2. The hydraulic drive system of a construction machine according to claim 1 , wherein the bleed-off valve is a single valve.

3. The hydraulic drive system of a construction machine according to claim 1 , wherein the bleed-off valve includes:

a first switching valve disposed on the circulation line; and

a second switching valve disposed on the bleed-off line.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 6, 2017
From: KONDO, AKIHIRO
To: KAWASAKI JUKOGYO KABUSHIKI KAISHA
Reel/Frame 043495/0859 →
Priority Claims (1)
JP 2015-050467 · Mar 13, 2015 · national
Continuity (1)
Related Publication 20180058040A1 · Mar 1, 2018
Cited By (1)
US 12,565,760