IP Library › Granted Patent US 10,329,873
Granted Patent B2
US 10,329,873 · App. 15/685,992 · Granted Jun 25, 2019

Methods for cementing a subterranean wellbore

Inventor: James C. Mullen, II (Tyler, TX)
Assignee: EOG RESOURCES, INC.
E21B33/14E21B43/16E21B33/134E21B33/138E21B47/0005
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,329,873
App. No.
15/685,992
Granted
Jun 25, 2019
Kind
B2
Abstract

A method for cementing a tubular member within a subterranean wellbore extending from a surface into a subterranean formation and through a hydrocarbon reservoir includes (a) injecting a gas from the surface into an annulus surrounding the tubular member within the wellbore. In addition, the method includes (b) flowing cement through a throughbore of the tubular member. Further, the method includes (c) displacing the cement from the throughbore of the tubular member into the annulus. Still further, the method includes (d) reducing a pressure of the gas in the annulus during (c).

Claims (45)

1. A method for cementing a tubular member within a subterranean wellbore extending from a surface into a subterranean formation and through a hydrocarbon reservoir, the method comprising:

(a) injecting a gas from the surface into an annulus surrounding the tubular member within the wellbore;

(b) flowing cement through a throughbore of the tubular member;

(c) displacing the cement from the throughbore of the tubular member into the annulus; and

(d) reducing a pressure of the gas in the annulus during (c), wherein (d) further comprises:

(d1) maintaining a fluid pressure in the annulus equal to or greater than a reservoir pressure of the reservoir; and

(d2) limiting the loss of cement into the subterranean formation to less than about 20 vol %.

2. The method of claim 1 , further comprising:

(e) displacing a portion of a fluid in the annulus downhole of the gas during (a).

3. The method of claim 1 , wherein (a) comprises pressurizing the gas in the annulus to push the gas to a predetermined depth in the annulus.

4. The method of claim 3 , further comprising:

(e) flowing the cement uphole through the annulus to a predetermined location in the annulus during (d), wherein the predetermined depth is based on the predetermined location.

5. The method of claim 1 , wherein the gas injected from the surface into the annulus is an inert gas.

6. The method of claim 5 , wherein the gas injected from the surface into the annulus is nitrogen gas.

7. The method of claim 1 , wherein (c) comprises:

(c1) closing a flow path through a plug disposed within the throughbore of the tubular member;

(c2) pumping fluid into the throughbore uphole of the plug after (c1); and

(c3) pushing the plug toward a lower end of the tubular member during (c2) with the fluid.

8. The method of claim 7 , wherein (c1) comprises:

flowing a dart within the throughbore of the tubular member; and

engaging the dart with a dart seat on the plug.

9. The method of claim 8 , further comprising:

(e) actuating a plurality of spaced open hole packers into engagement with the tubular member and a sidewall of the wellbore after (e).

10. A method for cementing a tubular member within a subterranean wellbore extending from the surface into a subterranean formation and through a hydrocarbon reservoir, the method comprising:

(a) injecting a gas from the surface into an annulus surrounding the tubular member within the wellbore;

(b) pressurizing the gas in the annulus to push a fluid in the annulus downhole to a predetermined depth in the annulus;

(c) flowing cement into a throughbore of the tubular member after (a);

(c) displacing the cement from the throughbore of the tubular member into the annulus; and

(d) bleeding the gas from the annulus during (c), wherein (d) further comprises maintaining a fluid pressure in the annulus equal to or greater than a reservoir pressure of the reservoir.

11. The method of claim 10 , wherein (a) comprises filling the annulus with a gas and pressurizing the gas in the annulus to a predetermined pressure to push the fluid in the annulus downhole to the predetermined depth; and

wherein (d) comprises reducing a pressure of the gas during (c).

12. The method of claim 10 , further comprising:

(e) flowing the cement uphole through the annulus to a predetermined location in the annulus during (d), wherein the predetermined depth is based on the predetermined location.

13. The method of claim 10 , wherein the gas injected into the annulus during (a) is an inert gas.

14. The method of claim 10 , wherein (d) further comprises limiting the loss of cement into the subterranean formation to less than about 50 vol %.

15. The method of claim 10 , wherein the gas injected into the annulus during (a) comprises one or more of a hydrocarbon gas, air, nitrogen, and carbon dioxide.

16. The method of claim 15 , further comprising:

(e) actuating a plurality of spaced open hole packers into engagement with the tubular member and a sidewall of the wellbore after (e).

17. The method of claim 10 , wherein (c) comprises:

(c1) closing a flow path through a plug disposed within the throughbore of the tubular member;

(c2) pumping a fluid into the throughbore above the plug after (c1); and

(c3) displacing the plug toward a lower end of the tubular member during (c2).

18. The method of claim 17 , wherein (c1) comprises:

flowing a dart within the throughbore of the tubular member; and

engaging the dart with a dart seat on the plug.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 4, 2017
From: MULLEN, JAMES C., II
To: EOG RESOURCES, INC.
Reel/Frame 043776/0639 →
Continuity (2)
Provisional Application 62378781 · Aug 24, 2016
Related Publication 20180058175A1 · Mar 1, 2018