Method of assembling a floating wind turbine platform
A method of assembling a floating wind turbine platform includes assembling a keystone having a hollow central cavity from pre-formed concrete sections, and assembling a plurality of buoyant bottom beams from pre-formed concrete sections. Each bottom beam is attached to, and extends radially outward of the keystone to define a base assembly. Each buoyant bottom beam includes a ballast chamber therein. The keystone is post-tensioned to each bottom beam along a longitudinal axis thereof. A center column is assembled upwardly and perpendicularly on the base assembly from pre-formed sections of the center column, the outer columns are assembled on a distal end of each bottom beam from pre-formed sections of the outer columns, and the center column and the outer columns are longitudinally post-tensioned to the base assembly. A tower is assembled on the center column from pre-formed sections, and a wind turbine is assembled on the tower.
1. A method of assembling a floating wind turbine platform comprising:
assembling a keystone from pre-formed concrete sections of the keystone, the keystone defining a hollow central cavity;
assembling a plurality of buoyant bottom beams from pre-formed concrete sections of the bottom beams, a proximal end of each bottom beam attached to the keystone and extending radially outward of the keystone, the keystone and the plurality of bottom beams defining a base assembly, wherein each buoyant bottom beam includes a plurality of walls defining a ballast chamber therein, and wherein longitudinal axes of each of the plurality of bottom beams are coplanar;
post-tensioning the keystone to each bottom beam along a longitudinal axis of each bottom beam;
assembling a center column upwardly and perpendicularly on the base assembly from pre-formed sections of the center column;
assembling outer columns upwardly and perpendicularly on a distal end of each bottom beam of the base assembly from pre-formed sections of the outer columns;
longitudinally post-tensioning the center column and the outer columns to the base assembly;
assembling a tower on the center column from pre-formed sections of the tower; and
assembling a wind turbine on the tower, thereby defining the floating wind turbine platform.
2. The method according to claim 1 , wherein each of the assembly steps occurs in an assembly area on land.
3. The method according to claim 2 , wherein at least one of the base assembly, the center column, the outer columns, and the tower are formed from concrete cast in place.
4. The method according to claim 2 , further including moving the assembled floating wind turbine platform from the assembly area into a body of water.
5. The method according to claim 2 , wherein the sections of the keystone, the bottom beams, the center column, the outer columns, and the tower are one of pre-cast concrete and formed at a location remote from the assembly area.
6. The method according to claim 1 , wherein each of the assembly steps occurs in a graving dock.
7. The method according to claim 6 , further including flooding the graving dock subsequent to the completion of each of the assembly steps.
8. The method according to claim 6 , wherein the sections of the keystone, the bottom beams, the center column, the outer columns, and the tower are one of pre-cast concrete sections and concrete sections formed at a location outside the graving dock.
9. The method according to claim 1 , further including floating and moving the assembled floating wind turbine platform to a location in a body of water where it will be moored and placed into operation.
10. The method according to claim 9 , further including mooring the floating wind turbine platform in a bed of the body of water.
11. The method according to claim 1 , wherein the steps of assembling the center column and the outer columns further includes assembling preformed concrete sections of the center column and preformed concrete sections of the outer columns.