IP Library Granted Patent US 10,354,897
Granted Patent B2
US 10,354,897 · App. 15/697,834 · Granted Jul 16, 2019

Container storage facility

Inventors: Takeshi Abe (Hinocho, JP); Tadahiro Yoshimoto (Hinocho, JP)
Assignee: Daifuku Co., Ltd.
H01L21/673H01L21/67017H01L21/67393H01L21/67766H01L21/67769H01L21/67775F01B25/02F01D11/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,354,897
App. No.
15/697,834
Granted
Jul 16, 2019
Kind
B2
Abstract

A container storage facility has storage portions for storing containers, and supplies a purge gas to the interior of the containers. The container storage facility includes ejection portions that eject the purge gas, a gas supply device that controls the supply flow rate of the purge gas, a main pipe that conducts the purge gas output from the gas supply device, and branch pipes that are branched from the main pipe and are connected to the ejection portions. The ejection portions eject the purge gas regardless of whether or not containers are stored in the storage portions, and the gas supply device controls the supply flow rate of the purge gas so as to increase as the total number of containers stored in the storage portions decreases.

Claims (23)

1. A container storage facility that has a plurality of storage portions for storing containers, and that supplies a purge gas to an interior of the container stored in each of the storage portions, the container storage facility comprising:

an ejection portion provided in each of the storage portions, the ejection portion being capable of being connected to the container stored in the storage portion and ejecting the purge gas into the container;

a gas supply device that controls a supply flow rate of the purge gas;

a main pipe that is connected to the gas supply device and conducts the purge gas output from the gas supply device; and

branch pipes that are branched from the main pipe and are connected to the ejection portions,

wherein the ejection portions each eject the purge gas regardless of whether or not the container is stored in the storage portion, and

wherein the gas supply device acquires information regarding a storage state of the containers in the storage portions, and controls the supply flow rate of the purge gas so as to increase as a total number of containers stored in the storage portions decreases.

2. The container storage facility according to claim 1 , wherein the gas supply device controls the supply flow rate according to the formula:

FL =( N/n )· Fa+Fb

wherein:

N is a total number of ejection portions that are connected to the main pipe via the branch pipes,

n is a total number of containers stored in the storage portions,

Fa is a reference flow rate of the purge gas output from the gas supply device,

Fb is an offset flow rate indicating an offset value of the purge gas output from the gas supply device, and

FL is the supply flow rate of the purge gas output from the gas supply device.

3. The container storage facility according to claim 1 , wherein the ejection portions can be connected to a gas inlet of the containers, and

wherein the branch pipes are each provided with a flow resistance body that has a higher resistance value than an inflow resistance that is a resistance component when the purge gas flows into a container via the gas inlet.

4. The container storage facility according to claim 2 , wherein the ejection portions can be connected to a gas inlet of the containers, and

wherein the branch pipes are each provided with a flow resistance body that has a higher resistance value than an inflow resistance that is a resistance component when the purge gas flows into a container via the gas inlet.

5. The container storage facility according to claim 1 , wherein the storage portions are arranged side-by-side in a vertical direction so as to overlap each other in a view in a direction along the vertical direction, and the gas supply device is arranged lower than the storage portions in the vertical direction without being overlapped by the storage portions in a view in a direction along the vertical direction.

6. The container storage facility according to claim 2 , wherein the storage portions are arranged side-by-side in a vertical direction so as to overlap each other in a view in a direction along the vertical direction, and the gas supply device is arranged lower than the storage portions in the vertical direction without being overlapped by the storage portions in a view in a direction along the vertical direction.

7. The container storage facility according to claim 3 , wherein the storage portions are arranged side-by-side in a vertical direction so as to overlap each other in a view in a direction along the vertical direction, and the gas supply device is arranged lower than the storage portions in the vertical direction without being overlapped by the storage portions in a view in a direction along the vertical direction.

8. The container storage facility according to claim 4 , wherein the storage portions are arranged side-by-side in a vertical direction so as to overlap each other in a view in a direction along the vertical direction, and the gas supply device is arranged lower than the storage portions in the vertical direction without being overlapped by the storage portions in a view in a direction along the vertical direction.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 7, 2017
From: ABE, TAKESHI; YOSHIMOTO, TADAHIRO
To: DAIFUKU CO., LTD.
Reel/Frame 043522/0544 →
Priority Claims (1)
JP 2016-176984 · Sep 9, 2016 · national
Continuity (1)
Related Publication 20180076055A1 · Mar 15, 2018
Cited By (1)
US 12,461,453