IP Library Granted Patent US 10,362,563
Granted Patent B2
US 10,362,563 · App. 15/542,495 · Granted Jul 23, 2019

Method for deactivating SCells upon a TAT expiry for PUCCH cell in a carrier aggregation system and a device therefor

Inventors: Sunyoung Lee (Seoul, KR); Seungjune Yi (Seoul, KR)
Assignee: LG Electronics Inc.
H04W72/0413H04L1/1854H04L1/1887H04L5/001H04L5/0032H04L5/0053H04L5/0082H04W52/0219H04L5/0048Y02D70/1224Y02D70/1242Y02D70/1262Y02D70/1264Y02D70/23Y02D70/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,362,563
App. No.
15/542,495
Granted
Jul 23, 2019
Kind
B2
Abstract

The present invention relates to a wireless communication system. More specifically, the present invention relates to a method and a device for deactivating SCells upon a TAT expiry for PUCCH cell in a carrier aggregation system, the method comprising: configuring a first cell with Physical Uplink Control Channel (PUCCH) resource in a PUCCH group and in a Timing Advance Group (TAG) with a configured Time Alignment Timer (TAT), wherein the first cell and zero or more second cells belong to the PUCCH group, and the first cell and zero or more third cells belong to the TAG; starting the TAT of the TAG; and deactivating all cells belonging to the PUCCH group when the TAT expires.

Claims (54)

1. A method for a User Equipment (UE) operating in a wireless communication system, the method comprising:

configuring a first cell with Physical Uplink Control Channel (PUCCH) resource,

wherein the first cell is both in a PUCCH group and in a Timing Advance Group (TAG) with a Time Alignment Timer (TAT),

wherein the PUCCH group includes the first cell and at least one second cell, and

wherein the second cell has a different time advance with the first cell;

starting the TAT of the TAG; and

deactivating the second cell based on that the TAT expires or stops.

2. The method according to claim 1 , wherein the second cell is activated before deactivating.

3. The method according to claim 1 , wherein the TAG includes the first cell and a third cell, and

wherein the second cell belonging to the PUCCH group and the third cell belonging to the TAG are different.

4. The method according to claim 1 , further comprising:

deactivating all cells belonging to the PUCCH group based on that the TAT expires or stops.

5. The method according to claim 1 , further comprising:

deactivating all cells except for the first cell belonging to the PUCCH group based on that the TAT expires or stops.

6. The method according to claim 1 , further comprising:

flushing Hybrid-ARQ (HARQ) buffer of the second cell.

7. The method according to claim 4 , further comprising:

flushing Hybrid-ARQ (HARQ) buffer of the all cells belonging to the PUCCH group.

8. The method according to claim 1 , further comprising:

activating the second cell after starting the TAT of the TAG.

9. The method according to claim 8 , further comprising:

after activating the second cell,

transmitting Sounding Reference Signal (SRS), or

reporting Channel Status Information (CSI) on an activated cell, or

monitoring a Physical Downlink Control Channel (PDCCH) on the activated cell, or

monitoring a PDCCH for the activated cell.

10. A User Equipment (UE) operating in a wireless communication system, the UE comprising:

a transmitter and a receiver; and

a processor, operatively coupled to the transmitter and the receiver, configured to control the transmitter and the receiver,

wherein the processor is further configured to:

configure a first cell with Physical Uplink Control Channel (PUCCH) resource,

wherein the first cell is both in a PUCCH group and in a Timing Advance Group (TAG) with a Time Alignment Timer (TAT),

wherein the PUCCH group includes the first cell and at least one second cell, and

wherein the second cell has a different time advance with the first cell,

start the TAT of the TAG, and

deactivate the second cell based on that the TAT expires or stops.

11. The UE according to claim 10 , wherein the second cell are activated before deactivating.

12. The UE according to claim 10 , wherein the TAG includes the first cell and a third cell, and

wherein the second cell belonging to the PUCCH group and the third cell belonging to the TAG are different.

13. The UE according to claim 10 , wherein the processor is further configured to:

deactivate all cells belonging to the PUCCH group based on that the TAT expires or stop.

14. The UE according to claim 10 , wherein the processor is further configured to:

deactivate all cells except for the first cell belonging to the PUCCH group based on that the TAT expires or stop.

15. The UE according to claim 10 , wherein the processor is further configured to:

flush the Hybrid-ARQ (HARQ) buffer of the second cell.

16. The UE according to claim 13 , wherein the processor is further configured to:

flush the Hybrid-ARQ (HARQ) buffer of the all cells belonging to the PUCCH group.

17. The UE according to claim 10 , wherein the processor is further configured to:

after starting the TAT of the TAG,

activate the second cell, and

transmit Sounding Reference Signal (SRS), or

report Channel Status Information (CSI) on an activated cell, or

monitor a Physical Downlink Control Channel (PDCCH) on the activated cell, or

monitor a PDCCH for the activated cell.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 10, 2017
From: LEE, SUNYOUNG; YI, SEUNGJUNE
To: LG ELECTRONICS INC.
Reel/Frame 042951/0553 →
Continuity (2)
Provisional Application 62112146 · Feb 4, 2015
Related Publication 20180288760A1 · Oct 4, 2018