IP Library Granted Patent US 10,397,945
Granted Patent B2
US 10,397,945 · App. 16/025,894 · Granted Aug 27, 2019

Method and apparatus of configuring timing of uplink transmission

Inventors: Yingyang Li (Beijing, CN); Chengjun Sun (Beijing, CN)
Assignee: Samsung Electronics Co., Ltd.
H04W72/1289H04L5/14H04W56/0005H04W56/0045H04W74/0833
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,397,945
App. No.
16/025,894
Granted
Aug 27, 2019
Kind
B2
Abstract

The present disclosure is to provide a method of configuring timing of uplink (UL) transmission, comprising, receiving, by a user equipment (UE), configuration information on carrier aggregation (CA) of at least one frequency division duplex (FDD) cell and at least one time division duplex (TDD) cell; and adjusting, by the UE, starting timing of a UL subframe in a cell participating in the CA.

Claims (36)

1. A method of configuring timing of an uplink (UL) transmission of a carrier aggregation (CA) system, the method comprising:

obtaining, by a user equipment (UE), information related to a time advance offset for the CA system;

receiving, by the UE, information related to a timing adjustment indication for the CA system that includes a primary cell (Pcell) and at least two secondary cells (Scells), wherein the timing adjustment indication is configured by a base station (BS) for a first Scell;

adjusting, by the UE, a starting timing of a UL subframe in a second Scell participating in the CA system based on the time advance offset and the timing adjustment indication; and

transmitting data based on the adjusted starting timing of the UL subframe,

wherein the first Scell and the second Scell belong to a time advance group (TAG) to which the Pcell does not belong, and

wherein a frame structure of the first Scell is different from a frame structure of the second Scell.

2. The method of claim 1 , wherein the first Scell is duplexed in a mode different from the second Scell.

3. The method of claim 1 , wherein adjusting, by the UE, the starting timing of the UL subframe in the second Scell comprises:

making the starting timing of the UL subframe of the UE in the second Scell (the timing adjustment indication+the time advance offset)*(a timing unit) seconds prior to a starting timing of a downlink (DL) subframe in the first Scell in a time advance group (TAG) to which the second Scell belongs.

4. The method of claim 1 , wherein the information related to the time advance offset is obtained from radio resource control (RRC) signal sent by a primary cell (Pcell) participating in the CA system.

5. The method of claim 1 , wherein the information related to the time advance offset is obtained from a broadcast signal sent by the second Scell.

6. The method of claim 1 , wherein the information related to the time advance offset is obtained from an RRC signal sent by the second Scell.

7. The method of claim 1 , wherein a starting timing of a UL subframe in the first Scell participating in the CA system is adjusted by using the time advance offset and the timing adjustment indication.

8. The method of claim 1 , wherein the time advance offset is pre-defined.

9. The method of claim 1 , wherein a random access preamble is transmitted at the starting timing of the UL subframe.

10. An apparatus comprising:

a transceiver coupled to at least one processor; and

a memory coupled to the at least one processor,

the at least one processor configured to:

obtain information related to a time advance offset for a carrier aggregation (CA) system,

receive information related to a timing adjustment indication for the CA system that includes a primary cell (Pcell) and at least two second cells (Scells), wherein the timing adjusting indication is configured by a base station (BS) for a first secondary cell (Scell),

adjust a starting timing of an uplink (UL) subframe in a second Scell participating in the CA system by using a time advance offset and the timing adjustment indication, and

transmit data based on the adjusted starting timing of the UL subframe,

wherein the first Scell and the second Scell belong to a time advance group (TAG) to which the Pcell does not belong, and

wherein a frame structure of the first Scell is different from a frame structure of the second Scell.

11. The apparatus of claim 10 ,

wherein the first Scell is duplexed in a mode different from the second Scell.

12. The apparatus of claim 10 ,

wherein the at least one processor is configured to make the starting timing of the UL subframe in the second Scell (the timing adjustment indication+the time advance offset)*(a timing unit) seconds prior to a starting timing of a downlink (DL) subframe in the first Scell in a time advance group (TAG) to which the second Scell belongs.

13. The apparatus of claim 10 , wherein the information related to the time advance offset is obtained from a radio resource control (RRC) signal sent by a primary cell (Pcell) participating in the CA system.

14. The apparatus of claim 10 , wherein the information related to the time advance offset is obtained from a broadcast signal sent by the second Scell.

15. The apparatus of claim 10 , wherein the information related to the time advance offset is obtained from an RRC signal sent by the second Scell.

16. The apparatus of claim 10 , wherein a starting timing of a UL subframe in the first Scell participating in the CA system is adjusted by using the time advance offset and the timing adjustment indication.

17. The apparatus of claim 10 , wherein the time advance offset is pre-defined.

18. The apparatus of claim 10 , wherein a random access preamble is transmitted at the starting timing of the UL subframe.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 2, 2018
From: LI, YINGYANG; SUN, CHENGJUN
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 046255/0880 →
Priority Claims (2)
CN 2013 1 0325414 · Jul 30, 2013 · national
CN 2014 1 0050500 · Feb 13, 2014 · national
Continuity (2)
Continuation 14909049
Related Publication 20180317252A1 · Nov 1, 2018