IP Library Granted Patent US 10,399,441
Granted Patent B2
US 10,399,441 · App. 15/350,171 · Granted Sep 3, 2019

Digital load management for variable output energy systems

Inventor: Meng Tao (Fountain Hills, AZ)
Assignee: Arizona Board of Regents on behalf of Arizona State University
B60L11/1803B60L53/30B60L53/51B60L53/63H02J1/14H02J7/35H02J7/0027Y02E60/721Y02T10/7005Y02T10/7094Y02T10/92Y02T90/121Y02T90/128Y02T90/14Y02T90/163Y04S10/126
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,399,441
App. No.
15/350,171
Granted
Sep 3, 2019
Kind
B2
Abstract

Principles of the present disclosure present a new concept for solar photovoltaic systems wherein the load to the photovoltaic system is digitally managed. This allows for much higher system efficiency along with a much lower system cost as compared to traditional solar photovoltaic systems in specific applications. By eliminating storage and power electronics typically present in traditional solar photovoltaic systems, exemplary systems achieve a cost reduction of over 50%, while the system efficiency is improved to over 95%.

Claims (22)

1. A method for managing a solar photovoltaic system, the method comprising:

measuring, by a photodetector, a power output of a photovoltaic array;

coupling, responsive to a first signal from a controller and by a first relay, a first sub-load to the photovoltaic array;

determining, by the controller, the power output of the photovoltaic array exceeds the capacity of the first sub-load;

coupling, responsive to a second signal from the controller and by a second relay, a second sub-load to the photovoltaic array;

determining, by the controller, the power output of the photovoltaic array is less than the combined capacity of the first sub-load and the second sub-load; and

uncoupling, responsive to a third signal from the controller and by the second relay, the second sub-load from the photovoltaic array,

wherein the power output of the photovoltaic array is not routed through the controller for conditioning or managing prior to being delivered to the first sub-load or the second sub-load, and

wherein the power output of the photovoltaic array is delivered to the first sub-load and the second sub-load without first being conditioned, and wherein the solar photovoltaic system does not comprise a power storage device for the power output of the solar photovoltaic system or power conditioning electronics for the power output of the solar photovoltaic system.

2. The method of claim 1 , wherein the first sub-load and the second sub-load have a fixed resistance value.

3. The method of claim 2 , wherein the first sub-load and the second sub-load comprise an electrolytic tank.

4. The method of claim 1 , wherein the first sub-load and the second sub-load have an identical resistance value.

5. The method of claim 1 , wherein one of first sub-load or the second sub-load has a variable resistance value.

6. The method of claim 5 , wherein one of the first sub-load or the second sub-load comprises a battery or an electric vehicle.

7. The method of claim 1 , wherein the first sub-load and the second sub-load may be independently coupled to and uncoupled from the photovoltaic array responsive to a signal from the controller.

8. The method of claim 1 , further comprising coupling a third sub-load, a fourth sub-load, a fifth sub-load, and a sixth sub-load to the photovoltaic array,

wherein the first signal is generated by the controller responsive to determining, by the controller, a solar intensity on the photovoltaic array has reached 12.5% of a maximum solar intensity on the photovoltaic array,

wherein the second signal is generated by the controller responsive to determining, by the controller, the solar intensity on the photovoltaic array has reached 25% of the maximum solar intensity on the photovoltaic array,

wherein the third sub-load is coupled to the photovoltaic array responsive to determining, by the controller, the solar intensity on the photovoltaic array has reached 37.5% of the maximum solar intensity on the photovoltaic array,

wherein the fourth sub-load is coupled to the photovoltaic array responsive to determining, by the controller, the solar intensity on the photovoltaic array has reached 50% of the maximum solar intensity on the photovoltaic array,

wherein the fifth sub-load is coupled to the photovoltaic array responsive to determining, by the controller, the solar intensity on the photovoltaic array has reached 62.5% of the maximum solar intensity on the photovoltaic array, and

wherein the sixth sub-load is coupled to the photovoltaic array responsive to determining, by the controller, the solar intensity on the photovoltaic array has reached 75% of the maximum solar intensity on the photovoltaic array.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2016
From: TAO, MENG
To: ARIZONA BOARD OF REGENTS ON BEHALF OF ARIZONA STATE UNIVERSITY
Reel/Frame 040363/0430 →
Continuity (3)
Provisional Application 62373041 · Aug 10, 2016
Provisional Application 62253754 · Nov 11, 2015
Related Publication 20170133854A1 · May 11, 2017