IP Library › Granted Patent US 10,407,869
Granted Patent B2
US 10,407,869 · App. 15/555,799 · Granted Sep 10, 2019

Construction machine provided with preheating unit and preheating method of construction machine

Inventor: Jun Nishihata (Ibaraki, JP)
Assignee: Hitachi Construction Machinery Co., Ltd.
E02F9/0866B60K11/02B60K11/04E02F9/226E02F9/268F01M1/16F01M5/001F01P3/20F02D41/064F02N19/04F02N19/10F15B21/042F16H57/04F16H57/0412B60Y2200/412E02F3/32E02F9/2066F01M5/021F01P2037/02F01P2060/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,407,869
App. No.
15/555,799
Granted
Sep 10, 2019
Kind
B2
Abstract

To provide a construction machine including a novel preheating unit that can efficiently preheat entire circulation channel where fluid flows, and a preheating method of the construction machine. A bypass channel is arranged in a circulation channel through which the fluid is circulated, this bypass channel is provided with the preheating unit that is formed of a heater and a bypass pump. According to such configuration, even in a state circulation of the fluid may stop in the circulation channel, the fluid can be heated while the fluid is circulated through the bypass channel, and therefore the entire circulation channel can be efficiently preheated. Moreover, since retrofitting to the existing circulation channel is possible, sound versatility can be exerted.

Claims (21)

1. A construction machine, comprising:

a bypass channel in parallel with a circulation channel that circulates fluid; and

a preheating unit that consists of a heater and a bypass pump in the middle of bypass channel, wherein the construction machine further comprises a controller that is configured to:

(i) when an outside air temperature is lower than a first predetermined value T 1 and a temperature of the fluid is lower than a second predetermined value T 2 (where T 1 <T 2 ) while a prime mover is stopped, control the preheating unit to execute heating of the fluid by the heater and fluid circulation by the bypass pump; and

(ii) when the outside air temperature is lower than the first predetermined value T 1 and the temperature of the fluid is equal to or higher than the second predetermined value T 2 while the prime mover is stopped, control the preheating unit to execute only fluid circulation by the bypass pump.

2. The construction machine according to claim 1 ,

wherein the bypass channel is arranged between an upstream side and a downstream side of a circulation pump that is arranged in the circulation channel, and

the bypass pump of the preheating unit circulates the fluid in the direction same to that of the circulation pump of the circulation channel.

3. The construction machine according to claim 1 ,

wherein the circulation channel is configured to circulate a lubricating oil between a hydraulic oil tank and a main pump,

the bypass channel is arranged in parallel with the circulation channel that is provided between the hydraulic oil tank and the main pump, and

the circulation channel and the bypass channel form a circulation loop of a hydraulic oil.

4. The construction machine according to claim 1 , wherein the circulation channel is a circulation channel that circulates a transmission oil for a transmission.

5. The construction machine according to claim 1 , wherein the circulation channel is a circulation channel that circulates cooling water for a prime mover.

6. The construction machine according to claim 3 , wherein the bypass channel connects the hydraulic oil tank and a suction tank to each other.

7. A preheating method of a construction machine comprising

a bypass channel in parallel with a circulation channel that circulates fluid; and

a preheating unit that consists of a heater and a bypass pump in the middle of bypass channel, the method comprising:

measuring an outside air temperature and a temperature of the fluid when a prime mover is stopped;

executing heating of the fluid by the heater of the preheating unit and fluid circulation by the bypass pump when the outside air temperature is lower than a first predetermined value T 1 and the temperature of the fluid is lower than a second predetermined value T 2 (where T 1 <T 2 ); and

executing only fluid circulation by the bypass pump of the preheating unit when the outside air temperature is lower than the first predetermined value T 1 and the temperature of the fluid is equal to or higher than the second predetermined value T 2 .

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 5, 2017
From: NISHIHATA, JUN
To: HITACHI CONSTRUCTION MACHINERY CO., LTD.
Reel/Frame 043490/0386 →
Continuity (1)
Related Publication 20180038074A1 · Feb 8, 2018