IP Library Granted Patent US 10,431,997
Granted Patent B2
US 10,431,997 · App. 15/004,980 · Granted Oct 1, 2019

Computerized information system for smart grid integrated electric vehicle charging and associated method

Inventors: Valery Miftakhov (San Carlos, CA); Alexander Gurzhi (San Jose, CA); Chris Edgette (Oakland, CA); Alan White (Tiburon, CA)
Assignee: Electric Motor Werks, Inc.
H02J7/0027B60L53/63B60L53/665B60L58/12H04L67/12Y02T10/7055Y02T90/168Y04S30/12Y04S40/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,431,997
App. No.
15/004,980
Granted
Oct 1, 2019
Kind
B2
Abstract

A system for charging an electric or hybrid-electric vehicle, the system incorporating: at least one vehicle charging station intermittently connectable to the vehicle; a control server comprising at least one processing unit and a memory; and a computerized information system comprising a display unit displaying a user interface and a user input unit, the computerized information system being communicatively connected to the control server via a data network, wherein the user interface comprises a charging priority selection portion for receiving, via the user input unit, a plurality of charging priorities from an operator of the vehicle, wherein the computerized information system transmits the received plurality of charging priorities to the control server and wherein the control server controls the at least one vehicle charging station based on the transmitted plurality of charging priorities.

Claims (29)

1. A system for charging an electric or hybrid-electric vehicle, the system comprising:

a. at least one vehicle charging station intermittently connectable to the vehicle;

b. a control server comprising at least one processing unit and a memory, wherein the control server is communicatively coupled, via the data network, to a smart grid infrastructure and the control server receives at least one real-time data stream from the smart grid infrastructure and

c. a computerized information system comprising a display unit displaying a user interface and a user input unit, the computerized information system being communicatively connected to the control server via a data network, wherein the user interface comprises a charging priority selection portion for receiving, via the user input unit, a plurality of charging priorities from an operator of the vehicle, wherein the computerized information system transmits the received plurality of charging priorities to the control server and wherein the control server controls the at least one vehicle charging station based on the transmitted plurality of charging priorities, wherein the charging priority selection portion of the user interface comprises a plurality of user interface widgets, each of the plurality of user interface widgets corresponding to a charging priority from the plurality of charging priorities.

2. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the plurality of charging priorities comprises a charge time priority.

3. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the plurality of charging priorities comprises a target state of charge priority.

4. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the plurality of charging priorities comprises an electricity price priority.

5. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the plurality of charging priorities comprises an electric energy source priority.

6. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the plurality of charging priorities comprises participation in demand response programs priority.

7. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the computerized information system is a mobile device of the operator of the vehicle.

8. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the at least one vehicle charging station receives at least one charging control command from the control server via the data network.

9. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein the at least one charging control command comprises charging start and charging stop commands.

10. The system for charging an electric or hybrid-electric vehicle of claim 9 , wherein the at least one data stream comprises real time electricity pricing data.

11. The system for charging an electric or hybrid-electric vehicle of claim 9 , wherein the at least one data stream comprises real time atmospheric emissions data.

12. The system for charging an electric or hybrid-electric vehicle of claim 9 , wherein the at least one data stream comprises real time electricity demand data.

13. The system for charging an electric or hybrid-electric vehicle of claim 9 , wherein the at least one data stream comprises real time event data.

14. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein computerized information system is disposed onboard of the vehicle.

15. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein computerized information system is disposed on the at least one vehicle charging station.

16. The system for charging an electric or hybrid-electric vehicle of claim 1 , wherein each of the plurality of user interface widgets is a slider widget.

17. A computer-implemented method for charging an electric or hybrid-electric vehicle, the method being performed in connection with a system comprising at least one vehicle charging station intermittently connectable to the vehicle, a control server comprising at least one processing unit and a memory and a computerized information system comprising a display unit and a user input unit, the computerized information system being communicatively connected to the control server via a data network, the method comprising:

a. displaying a user interface on the display unit, the user interface comprises a charging priority selection portion, wherein the charging priority selection portion of the user interface comprises a plurality of user interface widgets, each of the plurality of user interface widgets corresponding to a charging priority from the plurality of charging priorities

b. receiving, via the user input unit, a plurality of charging priorities from an operator of the vehicle;

c. transmitting the received plurality of charging priorities to the control server, wherein the control server is communicatively coupled, via the data network, to a smart grid infrastructure and the control server receives at least one real-time data stream from the smart grid infrastructure and

d. controlling the at least one vehicle charging station based on the transmitted plurality of charging priorities.

18. A non-transitory computer-readable medium embodying a set of instructions, which, when executed in connection with a system comprising at least one vehicle charging station intermittently connectable to the vehicle, a control server comprising at least one processing unit and a memory and a computerized information system comprising a display unit and a user input unit, the computerized information system being communicatively connected to the control server via a data network, cause the system to perform a method comprising:

a. displaying a user interface on the display unit, the user interface comprises a charging priority selection portion, wherein the charging priority selection portion of the user interface comprises a plurality of user interface widgets, each of the plurality of user interface widgets corresponding to a charging priority from the plurality of charging priorities

b. receiving, via the user input unit, a plurality of charging priorities from an operator of the vehicle;

c. transmitting the received plurality of charging priorities to the control server, wherein the control server is communicatively coupled, via the data network, to a smart grid infrastructure and the control server receives at least one real-time data stream from the smart grid infrastructure and

d. controlling the at least one vehicle charging station based on the transmitted plurality of charging priorities.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 10, 2025
From: ENEL X WAY USA, LLC
To: JUICEBOX USA (ASSIGNMENT FOR THE BENEFIT OF CREDITORS), LLC
Reel/Frame 071653/0904 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2022
From: ENEL X NORTH AMERICA, INC.
To: ENEL X WAY USA, LLC
Reel/Frame 062148/0609 →
MERGER AND CHANGE OF NAME Recorded Oct 21, 2019
From: ELECTRIC MOTOR WERKS, INC.; ENEL X NORTH AMERICA, INC.
To: ENEL X NORTH AMERICA, INC.
Reel/Frame 050774/0407 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2017
From: MIFTAKHOV, VALERY; GURZHI, ALEXANDER; EDGETTE, CHRIS; WHITE, ALAN
To: ELECTRIC MOTOR WERKS, INC.
Reel/Frame 043440/0857 →
Continuity (3)
Continuation In Part 14853955 · Sep 14, 2015
Provisional Application 62050147 · Sep 14, 2014
Related Publication 20160236585A1 · Aug 18, 2016
Cited By (5)
US 12,191,694 US 12,237,707 US 12,301,039 US 12,370,917 US 12,580,407