IP Library Granted Patent US 10,435,913
Granted Patent B2
US 10,435,913 · App. 15/821,331 · Granted Oct 8, 2019

Method and apparatus for constructing a concrete structure in stages

Inventor: Bryant Zavitz (Dunwoody, GA)
Assignee: Tindall Corporation
E04H12/34E04H12/16E04H12/18E04H12/341F03D13/10F03D13/20F03D13/40F05B2230/60
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,435,913
App. No.
15/821,331
Granted
Oct 8, 2019
Kind
B2
Abstract

Various implementations comprise a method and apparatus for constructing a concrete structure in stages. In various implementations, an apparatus includes a base, a support column located on the base, and a movable scaffolding rotatably coupled to a top of the support column. According to various other implementations, a method for assembling a tower stage includes: (1) providing a base platform; (2) coupling a pole to the base platform; (3) disposing two or more staves around the pole; (4) coupling the staves together to form the tower stage; and (5) removing the tower stage from the platform.

Claims (13)

1. A method for assembling a tower stage comprising:

providing a base platform;

coupling a pole to the base platform, wherein the base platform comprises a support fixture disposed circumferentially around and spaced apart from the pole, the base platform further comprising a rail that is disposed circumferentially around and spaced radially outwardly from the support fixture;

providing a movable scaffolding that engages the rail at a first end of the scaffolding and is rotatably coupled to a distal end of the pole at a second end of the movable scaffolding;

disposing two or more staves around the pole, the two or more staves being disposed on the base platform;

coupling the staves together to form the tower stage; and

removing the tower stage from the base platform.

2. The method according to claim 1 , further comprising coupling a bolting platform to the pole and resting the staves against the bolting platform.

3. The method according to claim 2 , wherein disposing the two or more staves around the pole comprises disposing a first end of each stave in the support fixture.

4. The method according to claim 1 , wherein coupling the staves comprises applying sealant to joints between adjacent staves.

5. The method according to claim 1 , wherein coupling the staves comprises threading at least one horizontal post-tensioning strand through a duct defined through the staves.

6. The method according to claim 1 , further comprising transporting the base platform with a low boy trailer before assembly.

7. The method according to claim 1 , further comprising transporting the tower stage with a low boy trailer.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 11, 2018
From: ZAVITZ, BRYANT
To: TINDALL CORPORATION
Reel/Frame 044594/0796 →
Continuity (2)
Provisional Application 62425957 · Nov 23, 2016
Related Publication 20180142491A1 · May 24, 2018
Cited By (1)
US 12,486,689