IP Library Granted Patent US 10,455,756
Granted Patent B2
US 10,455,756 · App. 15/694,432 · Granted Oct 29, 2019

Agricultural trench depth sensing systems, methods, and apparatus

Inventors: Derek Sauder (Tremont, IL); Jason Stoller (Morton, IL); Ian Radtke (Washington, IL); Kent Levy (Morton, IL)
Assignee: Precision Planting LLC
A01B79/005A01B71/02A01C7/203G01B21/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,455,756
App. No.
15/694,432
Granted
Oct 29, 2019
Kind
B2
Abstract

Systems, methods and apparatus are provided for determining the depth of a trench opened by an agricultural planter. Sensors are provided for detecting the position of a ground-engaging element of the planter such as a gauge wheel or seed firmer of a row unit of the planter. Apparatus and methods are provided for installing such sensors onto a row unit of the planter. Systems, methods and apparatus are provided for controlling downpressure on a row unit based on the trench depth. Methods are provided for mapping trench depth measured by the depth sensors.

Claims (29)

1. A method of measuring actual depth of a trench opened in a soil surface of a field by an opening disc of agricultural row unit, the agricultural row unit including a gauge wheel, the gauge wheel supported by a gauge wheel arm pivotally mounted to a frame of the agricultural row unit, a depth adjustment assembly having a plurality of selectable positions, each of the selectable positions establishing a selected trench depth by limiting an amount of upward travel of the gauge wheel relative to the opening disc, the method of measuring the actual trench depth comprising:

as the agricultural row unit traverses the field with the depth adjustment assembly in one of the selectable trench depth positions, generating a trench depth signal related to an actual trench depth opened in the soil surface by the opening disc;

determining a measured trench depth value based on said trench depth signal;

determining a location of the agricultural row unit in the field based on a GPS signal;

associating said measured trench depth value with said location; and

generating a trench depth map spatially relating a plurality of locations in the field with the measured trench depth at each of said plurality of locations.

2. The method of claim 1 , further comprising:

comparing said measured trench depth to the selected trench depth; and

modifying a position of a depth actuator to bring said measured trench depth closer to the selected trench depth.

3. The method of claim 1 , further comprising:

comparing said measured trench depth to the selected trench depth; and

modifying a configuration of a downpressure valve to bring said measured trench depth closer to the selected trench depth.

4. The method of claim 1 , further comprising:

comparing said measured trench depth to a full depth; and

if said measured trench depth is not equal to a full depth, adjusting the pressure of a downpressure actuator, said downpressure actuator disposed to modify a downpressure applied to the agricultural row unit.

5. The method of claim 4 , further comprising:

determining whether said measured depth is less than a zero depth;

if said measured depth is less than the zero depth, adjusting downpressure by a first increment; and

if said measured depth is not less than the zero depth, adjusting downpressure by a second increment, wherein said first increment is different in value from said second increment.

6. The method of claim 1 , further comprising:

displaying on a display viewable to a user, said trench depth map.

7. The method of claim 6 , wherein said step of determining a measured trench depth value comprises looking up said first depth signal in a calibration dataset.

8. The method of claim 7 , wherein said calibration dataset is updated by a calibration process, said calibration process comprising:

recording a first calibration signal while the first gauge wheel arm is in a first known position; and

modifying said calibration dataset based on said first calibration signal.

9. The method of claim 8 , wherein said calibration process further comprises:

recording a second calibration signal while said first gauge wheel arm is in a second known position; and

selecting a subset of said calibration dataset based on said second calibration signal.

10. The method of claim 8 , wherein said first gauge wheel arm is placed in said first known position by lowering the agricultural row unit onto a surface, wherein said surface is not penetrated by the opening disc of the agricultural row unit.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 1, 2017
From: SAUDER, DEREK; STOLLER, JASON; RADTKE, IAN; LEVY, KENT
To: PRECISION PLANTING LLC
Reel/Frame 043474/0428 →
Continuity (3)
Division 14437985
Provisional Application 61718073 · Oct 24, 2012
Related Publication 20170359944A1 · Dec 21, 2017
Cited By (2)
US 12,543,626 US 12,622,341