Earth retention levee system

Inventor: John Jarvie (Cronulla, AU)
Assignee: Armour Wall Group Pty Ltd
E02D5/03E02B3/06E02D17/18E02D29/0241E02D2300/0006E02D2300/007E02D2300/0045E02D2300/0053E02D2600/20E02D2600/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,494,783
App. No.
15/766,650
Granted
Dec 3, 2019
Kind
B2
Abstract

An earth retention levee system is disclosed which is constructed from spaced apart facing parallel walls of interlocking sheet piles ( 1, 2 ) said sheet piles having outside faces ( 5 ) and inside faces ( 4 ) formed with gridspines ( 10 ) along a longitudinal extent thereof, said gridspines ( 10 ) being connected to adjacent edges of geogrids ( 20 ) which link said parallel walls and stabilise fill ( 21 ) disposed therebetween.

Claims (21)

1. An earth retention levee system constructed from:

spaced apart facing parallel walls, each wall of interlocking sheet piles, said sheet piles each in the form of a box section having inside and outside walls and one or more interconnecting webs extending between the inside and outside walls, said outside walls each having an outside face and said inside walls each having an inside face, each inside face formed with a gridspine that extends from the inside face along a longitudinal extent thereof, the inside faces of the spaced apart facing parallel walls facing each other,

said gridspines being configured to be connected to adjacent edges of geogrid which are arranged to link said parallel walls and to stabilise fill disposed therebetween in use.

2. The earth retention levee system as claimed in claim 1

wherein said gridspines extend vertically in use.

3. The earth retention levee system as claimed in claim 1

wherein said gridspines are each formed as a continuous flange extending out from said inside face.

4. The earth retention levee system as claimed in claim 3 wherein said gridspines have enlarged or bulbous outer edges.

5. The earth retention levee system as claimed in claim 1

wherein each said sheet pile, on installation,

interlocks with another like pile to create a closed wall structure that can be infilled with concrete for increased strength.

6. The earth retention levee system as claimed in claim 1 wherein a number of said geogrids are built up in vertically spaced horizontal runs between said parallel walls in use.

7. The earth retention levee system as claimed in claim 1

wherein said sheet piles are formed from a composite material comprising a fibre reinforced polymer.

8. The earth retention levee system as claimed in claim 7 wherein said composite material includes reinforcement with biaxial E-glass fabrics, continuous strand glass mat and aligned unidirectional rovings.

9. The earth retention levee system as claimed in claim 1 wherein points of connection between said gridspines and geogrids are via rods inserted through holes in said gridspines with edges of said geogrids lapped over said rods.

10. The earth retention levee system as claimed in claim 1 wherein said parallel walls of interlocking sheet piles are driven into a ground area at a predetermined angle inward to each other.

11. The earth retention levee system as claimed in claim 10 wherein said predetermined angle is about 5 degrees.

12. The earth retention levee system as claimed in claim 1 wherein the gridspine is configured to be connected to an adjacent edge of one or more geogrids in use.

13. An earth retention levee system comprising:

at least two parallel walls adjacent to each other and spaced apart, each wall comprising a sheet pile having an outside face and inside face, said sheet pile each in the form of a box section, said outside or said inside face comprising gridspines along a longitudinal extent thereof, each said sheet pile adapted to slidably interlock with an adjacent sheet pile to form wall structures of closed box sections, wherein said gridspines are configured to be connected to adjacent edges of geogrid which are arranged to link said parallel walls and to stabilise fill disposed there between in use.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2018
From: JARVIE, JOHN
To: ARMOUR WALL GROUP PTY LTD
Reel/Frame 047815/0237 →
Priority Claims (1)
AU 2015904157 · Oct 13, 2015 · national
Continuity (1)