IP Library › Granted Patent US 10,549,934
Granted Patent B2
US 10,549,934 · App. 16/531,645 · Granted Feb 4, 2020

Dock housing

Inventor: Grant Leum (Excelsior, MN)
B65G69/287
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,549,934
App. No.
16/531,645
Granted
Feb 4, 2020
Kind
B2
Abstract

A method for constructing a dock housing for a pre-existing loading dock. The dock housing includes a base with top and bottom surfaces and front, back and opposed sidewalls. The front wall has integral fork pockets for interaction with forks on a fork truck for movement of the base into a desired location and the top surface has an opening to receive a dock leveler into such opening. Also included is a modular frame mounted onto the base in sections, the sections including a frame-front wall, opposed frame-sidewalls and a frame-top wall, the frame-front wall having a trailer-receiving opening to receive a trailer, the frame-sidewalls including a slotted-base attachment for securement of the base and sidewalls together. The dock housing is formed by securing the frame-sidewalls to a wall of a pre-existing building as well as securing the base, the frame-front wall and the frame-top wall together.

Claims (15)

1. A method for constructing a modular dock housing for a pre-existing loading dock comprising the steps of:

moving a base to a desired location, the base including top and bottom surfaces and front, back and opposed sidewalls, the front wall having integral fork pockets for interaction with forks on a fork truck for movement of the base into the desired location, the top surface having an opening to receive a dock leveler into such opening;

providing a modular frame mounted including a frame-front wall, opposed frame-sidewalls and a frame-top wall, the frame-front wall having a trailer-receiving opening to receive a trailer, the base including a slotted-base attachment for securement of the base to each opposed frame-sidewall;

bolting the frame-front wall to each frame-sidewall and then bolting the frame-front wall and frame-sidewalls to the base;

installing siding onto the frame-sidewalls;

securing the frame-top wall onto both of the frame-sidewalls;

sliding the forks on the fork truck into the integral fork pockets;

moving the base and assembled modular frame with the fork truck into position against a preexisting building wall; and

anchoring the frame-top wall and frame-sidewalls onto the preexisting building wall.

2. The method of claim 1 wherein the moving step includes a top surface having two openings to receive two dock levelers into such openings.

3. The method of claim 1 wherein the providing step includes the frame-front wall having two trailer-receiving openings.

4. The method of claim 1 wherein the providing step includes a door for opening and closing the trailer-receiving opening.

5. The method of claim 1 wherein the moving step includes a slotted-attachment on the base for connection of the frame-sidewalls to the base.

6. The method of claim 1 wherein the providing step includes adjustable front plates on the base.

7. The method of claim 1 wherein the moving step includes the opening being configured to receive a variety of dock levelers of different sizes and shapes.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2020
From: LEUM, GRANT
To: LEUM ENGINEERING, INC. D/B/A DOCKZILLA CO.
Reel/Frame 054166/0312 →
Continuity (2)
Division 15478389 · Apr 4, 2017
Related Publication 20190352111A1 · Nov 21, 2019