IP Library › Granted Patent US 10,577,876
Granted Patent B2
US 10,577,876 · App. 15/323,816 · Granted Mar 3, 2020

Estimating drilling fluid properties and the uncertainties thereof

Inventors: Jason D. Dykstra (Spring, TX); Zhijie Sun (Spring, TX); Xiaoqing Ge (The Woodlands, TX); Yuzhen Xue (Humble, TX)
Assignee: Halliburton Energy Services, Inc.
E21B21/062E21B21/08E21B47/024E21B47/065E21B49/003E21B49/005G05B17/02G05B19/042G05B19/18E21B21/063G01V3/38G05B2219/23455G05B2219/45129
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,577,876
App. No.
15/323,816
Granted
Mar 3, 2020
Kind
B2
Abstract

During drilling operations various drilling mud properties may be measured and predicted. Uncertainties in the measured or predicted values may also be calculated. The estimated uncertainties may then be used to optimize mud sampling interval and/or control a mud mixer. A decision making algorithm may be performed to optimize a surface mud sampling interval such that the uncertainties are maintained within a bounded region with minimal number of sampling times.

Claims (39)

1. A method comprising:

circulating a drilling mud through a mud circulation system;

determining a model of drilling mud property dynamics;

measuring a first value for a drilling mud property at a first time;

calculating an uncertainty of the first value at a second time; and

measuring a second value for the drilling mud property once the uncertainty of the first value is greater than an uncertainty limit.

2. The method of claim 1 further comprising: changing the drilling mud property based on the uncertainty.

3. The method of claim 1 further comprising: estimating changes in drilling parameters and conditions, thereby providing estimated drilling parameters and conditions; and changing the drilling mud property based on the uncertainty of the value and the estimated drilling parameters and conditions.

4. The method of claim 2 , wherein changing the drilling mud property involves regulating a feed rate of a chemical into the drilling mud.

5. The method of claim 2 , wherein changing the drilling mud property involves regulating a feed rate of water into the drilling mud.

6. The method of claim 2 , wherein changing the drilling mud property involves regulating a disposal rate of the drilling mud.

7. The method of claim 3 , wherein the drilling parameters and conditions includes at least one of: lithology of a subterranean formation drilling through, trajectory of a drill bit, drilling mud flow rate, drilling mud weight, drilling mud temperature, or drilling mud viscosity.

8. The method of claim 1 , wherein the drilling mud property is mud weight.

9. The method of claim 1 , wherein the drilling mud property is temperature.

10. The method of claim 1 , wherein the drilling mud property is viscosity.

11. A mud circulation system comprising:

a drill string within a wellbore penetrating a subterranean formation;

a pump configured to convey drilling mud through the drill string and the wellbore;

a sensor coupled to the system to measure a drilling condition;

a non-transitory computer-readable medium coupled to the drill string, the pump, or both and encoded with instructions that, when executed, cause the system to perform a method comprising:

circulating a drilling mud through the mud circulation system;

determining a model of drilling mud property dynamics;

measuring a first value for a drilling mud property at a first time;

calculating an uncertainty of the first value at a second time; and

measuring a second value for the drilling mud property once the uncertainty of the first value is greater than an uncertainty limit.

12. The mud circulation system of claim 11 , wherein the method further comprises: changing the drilling mud property based on the uncertainty.

13. The mud circulation system of claim 11 , wherein the method further comprises: estimating changes in drilling parameters and conditions, thereby providing estimated drilling parameters and conditions; and changing the drilling mud property based on the uncertainty of the value and the estimated drilling parameters and conditions.

14. The mud circulation system of claim 12 , wherein changing the drilling mud property involves regulating a feed rate of a chemical into the drilling mud.

15. The mud circulation system of claim 12 , wherein changing the drilling mud property involves regulating a feed rate of water into the drilling mud.

16. The mud circulation system of claim 12 , wherein changing the drilling mud property involves regulating a disposal rate of the drilling mud.

17. The mud circulation system of claim 13 , wherein the drilling parameters and conditions includes at least one of: lithology of a subterranean formation drilling through, trajectory of a drill bit, drilling mud flow rate, drilling mud weight, drilling mud temperature, or drilling mud viscosity.

18. The mud circulation system of claim 11 , wherein the drilling mud property is selected from the group consisting of: mud weight, mud temperature, and mud viscosity.

19. A non-transitory computer-readable medium encoded with instructions that, when executed, cause a mud circulation system to perform a method comprising:

circulating a drilling mud through the mud circulation system;

determining a model of drilling mud property dynamics;

measuring a first value for a drilling mud property at a first time;

calculating an uncertainty of the first value at a second time; and

measuring a second value for the drilling mud property once the uncertainty of the first value is greater than an uncertainty limit.

20. The non-transitory computer-readable medium of claim 19 , wherein the method further comprises: estimating changes in drilling parameters and conditions, thereby providing estimated drilling parameters and conditions; and changing the drilling mud property based on the uncertainty of the value and the estimated drilling parameters and conditions.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 30, 2020
From: XUE, YUZHEN
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 051675/0632 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 4, 2017
From: DYKSTRA, JASON D.; SUN, ZHIJIE; GE, XIAOQING
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 040840/0460 →
Continuity (2)
Provisional Application 62191675 · Jul 13, 2015
Related Publication 20170204689A1 · Jul 20, 2017
Cited By (1)
US 12,649,175