IP Library › Granted Patent US 10,612,795
Granted Patent B2
US 10,612,795 · App. 15/265,029 · Granted Apr 7, 2020

Methods and system for demand-based control of a combination boiler

Inventor: Curtis George Gagne (Smyrna, TN)
Assignee: Lochinvar, LLC
F24D19/1069F24D3/08F24D2220/042F24D2220/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,612,795
App. No.
15/265,029
Granted
Apr 7, 2020
Kind
B2
Abstract

A combination boiler provides heated water to a boiler loop and heated domestic hot water (DHW) to a DHW loop. A primary heat exchanger is connected to the boiler loop. A burner provides heat to the primary heat exchanger and an input fan supplies a fuel and air mixture to the burner. A secondary heat exchanger transfers heat energy from the boiler loop to a domestic water loop. A controller determines a boiler loop flow rate. The controller measures an input temperature of the boiler loop, an output temperature of the boiler loop, and a DHW output temperature of the domestic water loop. The controller determines a DHW input temperature and estimates a DHW flow rate. The input fan speed is initiated or operated according to a required heat output of the burner corresponding to the DHW flow rate.

Claims (35)

1. A method of controlling domestic hot water (DHW) output temperature in a combination boiler to minimize overshoot or undershoot of a DHW output set point temperature of output domestic water in a system having a primary heat exchanger connected to a boiler loop, a burner configured to provide heat to the primary heat exchanger, an input fan configured to supply a fuel and air mixture to the burner, and a secondary heat exchanger configured to transfer heat energy from the boiler loop to a domestic water loop, the method comprising:

determining a boiler loop flow rate;

measuring an input temperature of the primary heat exchanger, an output temperature of the primary heat exchanger, and a DHW output temperature of the secondary heat exchanger;

estimating a DHW flow rate based at least in part upon the boiler loop flow rate, the input temperature of the primary heat exchanger, and the output temperature of the primary heat exchanger;

operating the input fan according to a heat output demand of the burner corresponding to the DHW flow rate; and

providing the output domestic water from the secondary heat exchanger corresponding to the DHW output set point temperature based at least in part upon the operating the input fan according to the heat output demand of the burner corresponding to the DHW flow rate.

2. The method of claim 1 , wherein the boiler loop includes an inlet pump and a flow diverting valve, and wherein the boiler loop flow rate is determined based at least in part upon an operational characteristic of at least one of the inlet pump and the flow diverting valve.

3. The method of claim 2 , wherein the boiler loop flow rate corresponds to a flow rate of boiler loop water passing through the secondary heat exchanger via the flow diverting valve.

4. The method of claim 1 , further comprising:

comparing the DHW output temperature to a DHW set point temperature to determine an error amount; and

selectively modifying operation of the combination boiler based on the error amount.

5. The method of claim 4 , wherein a fan speed of the input fan is modified based at least in part upon the error amount.

6. The method of claim 1 , wherein the DHW flow rate is estimated by (i) determining a product of the boiler loop flow rate and a difference between the input temperature of the primary heat exchanger and the output temperature of the primary heat exchanger, and (ii) dividing the product by the difference between the DHW output temperature and an assumed DHW input temperature.

7. The method of claim 6 , wherein the assumed DHW input temperature is a predetermined value.

8. A combination boiler system for providing heated water to a boiler loop and heated domestic hot water (DHW) to a DHW loop while minimizing overshoot or undershoot of a DHW output set point temperature of output domestic water, the combination boiler system comprising:

a primary heat exchanger connected to the boiler loop,

a burner configured to provide heat to the primary heat exchanger,

an input fan configured to supply a fuel and air mixture to the burner,

a secondary heat exchanger configured to transfer heat energy from the boiler loop to a domestic water loop; and

a controller configured to:

determine a boiler loop flow rate;

measure an input temperature of the boiler loop, an output temperature of the boiler loop, and a DHW output temperature of the domestic water loop;

estimate a DHW flow rate based at least in part upon the boiler loop flow rate, the input temperature of the boiler loop, and the output temperature of the boiler loop;

operate the input fan according to a heat output demand of the burner corresponding to the DHW flow rate; and

provide the output domestic water from the secondary heat exchanger corresponding to the DHW output set point temperature based at least in part upon operating the input fan according to the heat output demand of the burner corresponding to the DHW flow rate.

9. The combination boiler system of claim 8 , the combination boiler system further comprising:

an inlet temperature sensor connected to the boiler loop, the inlet temperature sensor configured to measure the input temperature of the boiler loop.

10. The combination boiler system of claim 8 , the combination boiler system further comprising:

an input pump configured to circulate water in the boiler loop;

a flow diverting valve connected to the boiler loop, the flow diverting valve configured to selectively divert heated water from the boiler loop to the secondary heat exchanger,

wherein the controller is configured to determine a boiler loop flow rate based upon an operational setting of at least one of the input pump and the flow diverting valve.

11. The combination boiler system of claim 8 , wherein the controller is further configured to:

compare the DHW output temperature to a DHW set point temperature to determine an error amount; and

selectively modify operation of the combination boiler system based on the error amount.

12. The combination boiler system of claim 11 , wherein the controller is configured to modify a fan speed of the input fan based at least in part upon the error amount.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 5, 2016
From: GAGNE, CURTIS GEORGE
To: LOCHINVAR, LLC
Reel/Frame 040515/0193 →
Continuity (1)
Related Publication 20180073748A1 · Mar 15, 2018
Cited By (1)
US 12,320,572