IP Library Granted Patent US 10,663,162
Granted Patent B2
US 10,663,162 · App. 16/125,030 · Granted May 26, 2020

Fluid utilization facility management method and fluid utilization facility management system

Inventors: Yoshiyasu Fujiwara (Kakogawa, JP); Kazunori Oda (Kakogawa, JP); Noriaki Tsuchiiwa (Kakogawa, JP); Tomoyuki Shiraishi (Kakogawa, JP)
Assignee: TLV Co., Ltd.
F22B37/26F01K13/003F01K13/02F16T1/48G05B23/02Y02E20/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,663,162
App. No.
16/125,030
Granted
May 26, 2020
Kind
B2
Abstract

A method for optimizing a fluid utilization facility. The method includes monitoring an operating state of a fluid utilization device and an operating state of a drain trap in a fluid utilization facility based on detection information obtained by detectors installed in various places in the fluid utilization facility. A running state of the fluid utilization facility is optimized based on a monitoring result.

Claims (33)

1. A fluid utilization facility management method comprising:

creating a drain water discharge database including a piping layout of pipes on which drain traps and valves in a fluid utilization facility are arranged and locations of the drain traps and the valves on the pipes;

monitoring an operating state of each of a fluid utilization device, the drain trap, and the valve in the fluid utilization facility based on detection information from detectors installed in various places in the fluid utilization facility;

optimizing a running state, of the fluid utilization facility based on this monitoring result and the drain water discharge database calculating an energy balance in the fluid utilization facility, and optimizing the running state of the fluid utilization facility based on the energy balance calculation result, the monitoring result, and the drain water discharge database; wherein the fluid utilization facility is a steam utilization facility that uses steam as a fluid, wherein a steam utilization device that is the fluid utilization device in the steam utilization facility includes a fuel device that refines fuel that is also used for steam generation, and wherein the energy balance includes a fuel balance calculated based on an amount of fuel refined by the fuel device and an amount of fuel used for steam generation.

2. The fluid utilization facility management method according to claim 1 , further comprising:

making a trial calculation of an economic effect or an environmental effect achieved in a case of optimizing the running state of the fluid utilization facility from a current state.

3. The fluid utilization facility management method according to claim 1 ,

wherein the energy balance includes a steam balance calculated based on a steam use status of the steam utilization facility.

4. The fluid utilization facility management method according to claim 1 ,

wherein the steam utilization device that is the fluid utilization device in the steam utilization facility includes a generator that generates electric power using steam, and

wherein the energy balance includes a balance between heat and electric power calculated based on a total amount of generated steam and an amount of electric power generated by the generator in the steam utilization facility.

5. The fluid utilization facility management method according to claim 1 , wherein the energy balance calculation result includes comparison information regarding a comparison between the calculated energy balance and a past energy balance or a reference energy balance.

6. The fluid utilization facility management method according to claim 1 , further comprising:

accumulating and storing the monitoring result of the operating states of at least the drain traps and the valves;

creating history information of the operating states of the drain traps and the valves; and

optimizing the running state of the fluid utilization facility further based on the history information.

7. The fluid utilization facility management method according to claim 1 ,

wherein the drain water discharge database further includes the operating states of the drain traps and the valves; and

wherein the drain water discharge database is updated based on the monitoring result.

8. The fluid utilization facility management method according to claim 1 , wherein the drain water discharge database further includes models of the drain traps and the valves.

9. A fluid utilization facility management system for implementing the fluid utilization facility management method according to any one of claims 1 , 2 - 4 and 5 - 8 , the system comprising:

detectors and a management means arranged in various places in the fluid utilization facility,

wherein the management means includes:

a monitoring unit for monitoring an operating state of each of the fluid utilization device, the drain trap, and the valve in the fluid utilization facility based on the detection information from the detectors, and

a storing unit for storing the drain water discharge database including a piping layout of pipes on which the drain traps and the valves are arranged and locations of the drain traps and the valves on the pipes in the fluid utilization facility.

10. The fluid utilization facility management system according to claim 9 , wherein the management means further includes a simulation unit for simulating the energy balance in the fluid utilization facility.

11. The fluid utilization facility management system according to claim 9 ,

wherein the storing unit accumulates and stores the monitoring results of the operating states of at least the drain traps and the valves; and

the monitoring unit creates a history information of the operating state of at least the drain traps and the valves.

12. The fluid utilization facility management system according to claim 9 ,

wherein the drain water discharge database further includes the operating states of the drain traps and the valves; and

the drain water discharge database is updated based on the monitoring result.

13. The fluid utilization facility management system according to claim 9 , wherein the drain water discharge database further includes models of the drain traps and the valves.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 7, 2018
From: FUJIWARA, YOSHIYASU; ODA, KAZUNORI; TSUCHIIWA, NORIAKI; SHIRAISHI, TOMOYUKI
To: TLV CO., LTD.
Reel/Frame 046816/0720 →
Priority Claims (1)
JP 2014-117582 · Jun 6, 2014 · national
Continuity (2)
Continuation 15316395
Related Publication 20190003701A1 · Jan 3, 2019