IP Library Granted Patent US 10,781,691
Granted Patent B2
US 10,781,691 · App. 15/863,579 · Granted Sep 22, 2020

System and method for providing a continuous wellbore survey

Inventors: Adrián Guillermo Ledroz (Houston, TX); John Lionel Weston (Christchurch, GB)
Assignee: Gyrodata Incorporated
E21B49/00E21B47/00E21B47/18G01C19/38
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,781,691
App. No.
15/863,579
Granted
Sep 22, 2020
Kind
B2
Abstract

Systems and methods are provided for producing a continuous survey of a previously drilled portion of a wellbore. The method includes receiving a plurality of stationary survey measurements taken at a corresponding plurality of locations along the portion of the wellbore. The method further includes receiving at least one continuous survey including a plurality of continuous survey measurements taken between a pair of stationary survey measurements of the plurality of stationary survey measurements. The method further includes combining the plurality of stationary survey measurements and the plurality of continuous survey measurements to produce the continuous survey of the portion of the wellbore.

Claims (40)

1. A method, comprising:

acquiring continuous survey data during an outrun data acquisition using a gyro-while-drilling (GWD) survey tool disposed within a previously drilled section of a wellbore, wherein the GWD survey tool has one or more gyroscopic sensors, and wherein the GWD survey tool is configured to ascend within the previously drilled section of the wellbore during the outrun data acquisition; and

transmitting the continuous survey data to a computing system, wherein the computing system is configured to generate a continuous survey of the previously drilled section of the wellbore based on the continuous survey data.

2. The method of claim 1 , wherein acquiring the continuous survey data comprises acquiring the continuous survey data during the outrun data acquisition as a bottom hole assembly containing the GWD survey tool is being retrieved from the previously drilled section of the wellbore.

3. The method of claim 1 , wherein acquiring the continuous survey data comprises acquiring the continuous survey data using the one or more gyroscopic sensors and one or more accelerometers of the GWD survey tool.

4. The method of claim 1 , wherein acquiring the continuous survey data comprises acquiring the continuous survey data at depth intervals along the previously drilled section of the wellbore that are less than or equal to one foot.

5. The method of claim 1 , wherein the continuous survey data comprises depth data acquired during the outrun data acquisition based on a length of a drill string containing the GWD survey tool, a length of each section of the drill string, and a substantially constant rate of ascent of the GWD survey tool between a plurality of stationary positions at which the GWD survey tool is placed during a retrieval process.

6. The method of claim 1 , further comprising:

receiving a mode signal at the GWD survey tool disposed within the previously drilled section of the wellbore; and

switching the GWD survey tool to a continuous survey mode based on the received mode signal.

7. The method of claim 6 , wherein receiving the mode signal comprises receiving the mode signal at the GWD survey tool using mud pulse telemetry.

8. The method of claim 1 , wherein transmitting the continuous survey data comprises transmitting the continuous survey data to the computing system after the GWD survey tool has been retrieved from the previously drilled section of the wellbore.

9. The method of claim 1 , further comprising:

acquiring additional survey data during an inrun data acquisition using the GWD survey tool or a measurement-while-drilling (MWD) survey tool having one or more magnetic sensors; and

transmitting the additional survey data to the computing system, wherein the computing system is configured to generate the continuous survey of the previously drilled section of the wellbore based on the continuous survey data and the additional survey data.

10. A method, comprising:

receiving continuous survey data acquired during an outrun data acquisition using a gyro-while-drilling (GWD) survey tool disposed within a previously drilled section of a wellbore, wherein the GWD survey tool has one or more gyroscopic sensors, and wherein the GWD survey tool is configured to ascend within the previously drilled section of the wellbore during the outrun data acquisition; and

generating a continuous survey of the previously drilled section of the wellbore based on the continuous survey data.

11. The method of claim 10 , wherein, during the outrun data acquisition, the GWD survey tool is configured to acquire the continuous survey data using the one or more gyroscopic sensors and one or more accelerometers of the GWD survey tool.

12. The method of claim 10 , wherein, during the outrun data acquisition, the GWD survey tool is configured to acquire the continuous survey data as a drill string containing the GWD survey tool is being retrieved from the previously drilled section of the wellbore.

13. The method of claim 10 , wherein, during the outrun data acquisition, the GWD survey tool is configured to acquire the continuous survey data at depth intervals along the previously drilled section of the wellbore that are less than or equal to one foot.

14. The method of claim 10 , wherein the continuous survey data comprises depth data acquired during the outrun data acquisition based on a length of a drill string containing the GWD survey tool, a length of each section of the drill string, and one or more measurements from a z-axis accelerometer of the GWD survey tool.

15. The method of claim 10 , wherein the GWD survey tool is configured to:

receive a mode signal prior to the outrun data acquisition; and

switch to a continuous survey mode based on the received mode signal.

16. The method of claim 15 , wherein the GWD survey tool is configured to receive the mode signal using mud pulse telemetry.

17. The method of claim 10 , further comprising:

receiving additional survey data acquired during an inrun data acquisition using the GWD survey tool or a measurement-while-drilling (MWD) survey tool; and

generating a continuous survey of the previously drilled section of the wellbore based on the continuous survey data and the additional survey data.

18. A gyro-while-drilling (GWD) survey tool disposed in a previously drilled section of a wellbore, comprising:

one or more gyroscopic sensors configured to acquire continuous survey data during an outrun data acquisition, wherein the GWD survey tool is configured to ascend within the previously drilled section of the wellbore during the outrun data acquisition;

a processor; and

a memory comprising a plurality of program instructions which, when executed by the processor, cause the processor to:

transmit the continuous survey data to a computing system, wherein the computing system is configured to generate a continuous survey of the previously drilled section of the wellbore based on the continuous survey data.

19. The GWD survey tool of claim 18 , wherein the plurality of program instructions further comprise program instructions which, when executed by the processor, cause the processor to:

receive a mode signal prior to the outrun data acquisition; and

switch to a continuous survey mode based on the received mode signal.

20. The GWD survey tool of claim 18 , wherein:

the one or more gyroscopic sensors are further configured to acquire additional survey data during an inrun data acquisition; and

the memory further comprise program instructions which, when executed by the processor, cause the processor to transmit the additional survey data to the computing system, wherein the computing system is configured to generate the continuous survey of the previously drilled section of the wellbore based on the continuous survey data and the additional survey data.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 5, 2018
From: LEDROZ, ADRIÁN GUILLERMO; WESTON, JOHN LIONEL
To: GYRODATA, INCORPORATED
Reel/Frame 044548/0872 →
Continuity (4)
Continuation In Part 15452075 · Mar 7, 2017
Continuation In Part 14446140 · Jul 29, 2014
Provisional Application 62527607 · Jun 30, 2017
Related Publication 20180128101A1 · May 10, 2018
Cited By (2)
US 12,392,237 US 12,735,980