IP Library › Granted Patent US 10,797,810
Granted Patent B2
US 10,797,810 · App. 16/107,326 · Granted Oct 6, 2020

System and method for communications with multi-antenna panel devices

Inventors: Majid Ghanbarinejad (Chicago, IL); Philippe Sartori (Plainfield, IL); Murali Narasimha (Lake Oswego, OR)
Assignee: Futurewei Technologies, Inc.
H04B17/382H04B7/0408H04B7/0626H04B17/104H04B7/0617
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,797,810
App. No.
16/107,326
Filed
Aug 21, 2018
Granted
Oct 6, 2020
Kind
B2
Art Unit
2631
USPC
375/262
Abstract

A method for operating a user equipment with multi-beam communication capability includes performing measurements in accordance with received reference signals, and determining that at least one antenna panel is unused, wherein the determining is in accordance with the measurements, and based thereon, reporting an availability of the at least one antenna panel.

Claims (44)

1. A computer implemented method for operating a user equipment (UE), the method comprising:

performing, by the UE, measurements of received reference signals;

determining, by the UE in accordance with the measurements of the received reference signals, that at least one antenna panel, which is currently-assigned to one radio link monitoring (RLM) task, is available for re-assignment to another RLM task, and based thereon

sending, by the UE, a report to at least one access node indicating a number of antenna panels of the UE that are available for assignment to new RLM tasks.

2. The method of claim 1 , further comprising:

receiving, by the UE, an instruction to use at least one antenna panel for a new RLM task; and

operating, by the UE, the at least one antenna panel for the new RLM task in accordance with the received instruction.

3. The method of claim 2 , wherein the instruction is received from a first access node, and operating the at least one antenna panel for the new RLM task comprises measuring signals from a second access node.

4. The method of claim 1 , wherein the measurements of the received reference signals comprise at least one of channel measurements, interference measurements, or beam measurements.

5. The method of claim 1 , further comprising reporting, by the UE, at least one of the measurements of the received reference signals.

6. The method of claim 5 , wherein the at least one antenna panel is associated with the at least one of the measurements of the received reference signals.

7. The method of claim 5 , wherein the number of antenna panels of the UE that are available for assignment to new RLM tasks and the at least one of the measurements are reported in a message.

8. The method of claim 1 , further comprising receiving, by the UE, a request to report the number of antenna panels of the UE that are available for assignment to new RLM tasks.

9. The method of claim 1 , wherein the report indicating the number of antenna panels of the UE that are available for assignment to new RLM tasks is sent via a radio resource control (RRC) message.

10. The method of claim 1 , wherein the report indicating the number of antenna panels of the UE that are available for assignment to new RLM tasks is sent via a physical uplink shared channel (PUSCH) or a physical uplink control channel (PUCCH).

11. A computer-implemented method for operating a first access node, the method comprising:

transmitting, by the first access node, reference signals to a user equipment (UE);

receiving, by the first access node, a report from the UE indicating a number of antenna panels of the UE that are available for assignment to new radio link monitoring (RLM) tasks, the number of antenna panels of the UE that are available for assignment to new RLM tasks being determined based on measurements of the reference signals transmitted to the UE is currently-assigned to one RLM task to another RLM task; and

sending, by the first access node, an instruction to use at least one antenna panel for a new RLM task.

12. The method of claim 11 , further comprising sending, by the first access node, a request to report the number of antenna panels of the UE that are available for assignment to new RLM tasks.

13. The method of claim 12 , wherein the request is associated with a reporting of the measurements of the reference signals transmitted by the first access node.

14. The method of claim 13 , wherein the measurements of the reference signals transmitted by the first access node comprise at least one of channel measurements, interference measurements, or beam measurements.

15. The method of claim 13 , further comprising receiving, by the first access node from the UE, at least one of the measurements of the reference signals transmitted by the first access node.

16. The method of claim 15 , wherein the at least one antenna panel is associated with the at least one of the measurements of the reference signals transmitted by the first access node.

17. The method of claim 15 , wherein the number of antenna panels of the UE that are available for assignment to new RLM tasks and the at least one of the measurements are reported in a common message.

18. The method of claim 11 , wherein the report is received in a physical uplink shared channel (PUSCH) or a physical uplink control channel (PUCCH).

19. The method of claim 11 , wherein the report indicating the number of antenna panels of the UE that are available for assignment to new RLM tasks is received in an RRC message.

20. A user equipment (UE) comprising:

a non-transitory memory storage comprising instructions; and

one or more processors in communication with the memory storage, wherein the one or more processors execute the instructions to:

perform measurements of in accordance with received reference signals,

determine, in accordance with the measurements of the received reference signals, that at least one antenna panel, which is currently-assigned to one radio link monitoring (RLM) task, is available for re-assignment to another RLM task, and

send a report to at least one access node indicating a number of antenna panels of the UE that are available for assignment to new RLM tasks.

21. The UE of claim 20 , wherein the one or more processors further execute the instructions to receive an instruction to use the at least one antenna panel for a new RLM task, and operate the at least one antenna panel for the new RLM task in accordance with the received instruction.

22. The UE of claim 20 , wherein the one or more processors further execute the instructions to report at least one of the measurements of the received reference signals.

23. The UE of claim 20 , wherein the one or more processors further execute the instructions to receive a request to report the number of antenna panels of the UE that are available for assignment to new RLM tasks.

24. An access node comprising:

a non-transitory memory storage comprising instructions; and

one or more processors in communication with the memory storage, wherein the one or more processors execute the instructions to:

receive a report indicating a number of antenna panels of a user equipment (UE) that are available to new radio link monitoring (RLM) tasks, the UE determining in accordance with measurements of received reference signals by the UE, that at least one antenna panel, which is currently-assigned to one RLM task, is available for re-assignment to another RLM task; and

send an instruction on use of the at least one antenna panel.

25. The access node of claim 24 , wherein the one or more processors further execute the instructions to send a request to report the number of antenna panels of the UE that are available for assignment to new RLM tasks.

26. The access node of claim 25 , wherein the request is associated with a reporting of the measurements of the signals transmitted by the access node, and wherein the one or more processors further execute the instructions to receive a report of at least one of the measurements.

27. The access node of claim 25 , wherein the request is associated with a reporting of the measurements of the signals transmitted by the access node, and wherein the one or more processors further execute the instructions to send reference signals.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 21, 2018
From: GHANBARINEJAD, MAJID; SARTORI, PHILIPPE; NARASIMHA, MURALI
To: FUTUREWEI TECHNOLOGIES, INC.
Reel/Frame 046652/0250 →
Continuity (1)
Related Publication 20200067615A1 · Feb 27, 2020
Cited By (1)
US 12,732,981