IP Library › Granted Patent US 10,815,761
Granted Patent B2
US 10,815,761 · App. 16/027,114 · Granted Oct 27, 2020

Process for producing hydrocarbons from a subterranean hydrocarbon-bearing reservoir

Inventors: John E. Arthur (Calgary, CA); Jarrett Dragani (Calgary, CA); Nadim Kassam (Calgary, CA); Michael Bumstead (Calgary, CA)
Assignee: Cenovus Energy Inc.
E21B43/168E21B43/12E21B43/122E21B43/305E21B43/38E21B47/07E21B47/10E21B47/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,815,761
App. No.
16/027,114
Granted
Oct 27, 2020
Kind
B2
Abstract

A process for producing hydrocarbons from a subterranean hydrocarbon-bearing reservoir includes injecting a gas, at a pressure below a minimum miscibility pressure, into the reservoir through an injection well extending into the reservoir to form a gas zone in the reservoir. The gas injection pressure is suitable to provide a differential pressure between a bottom-hole production well pressure at a horizontal multi-lateral production well extending into the reservoir, and the gas injection pressure to facilitate sweeping the hydrocarbons toward the production well prior to gas breakthrough at the production well. The method also includes producing a portion of the hydrocarbons to surface through the production well, monitoring the production well for the gas breakthrough, and after the gas breakthrough is detected producing a further portion of the hydrocarbons by a gas gravity drainage process in which hydrocarbons are drained toward the production well, and controlling continued production of the hydrocarbons through the production well.

Claims (36)

1. A process for producing hydrocarbons from a subterranean hydrocarbon-bearing reservoir, the process comprising:

injecting a gas, at a gas injection pressure below a minimum miscibility pressure, into the reservoir through an injection well extending into the reservoir to form a gas zone in the reservoir, the gas injection pressure being suitable to provide a differential pressure, between a bottom-hole production well pressure at a horizontal multi-lateral production well extending into the reservoir and the gas injection pressure, to facilitate sweeping the hydrocarbons toward the production well prior to a gas breakthrough at the production well;

producing a portion of the hydrocarbons to surface through the production well;

monitoring the production well for the gas breakthrough, and after the gas breakthrough is detected:

producing a further portion of the hydrocarbons by a gas gravity drainage process in which hydrocarbons are drained toward the production well; and

controlling continued production of the hydrocarbons through the production well,

wherein controlling continued production of the hydrocarbons comprises at least one of: re-completing a lateral of the horizontal multi-lateral production well, isolating the lateral of the horizontal multi-lateral production well, installing an inflow control device in the lateral of the horizontal multi-lateral production well, re-drilling a section of the lateral of the horizontal multi-lateral production well, re-drilling a section of the injection well, or a combination thereof.

2. The process according to claim 1 , wherein re-completing comprises at least one of re-sizing a lift assembly, installing a downhole gas separator, implementing a gas lift process, installing a separate tubing string within the well to divert flow from a lateral of the well, or a combination thereof.

3. A process for producing hydrocarbons from a subterranean hydrocarbon-bearing reservoir, the process comprising:

injecting a gas, at a gas injection pressure below a minimum miscibility pressure, into the reservoir through an injection well extending into the reservoir to form a gas zone in the reservoir, the gas injection pressure being suitable to provide a differential pressure, between a bottom-hole production well pressure at a horizontal multi-lateral production well extending into the reservoir and the gas injection pressure, to facilitate sweeping the hydrocarbons toward the production well prior to a gas breakthrough at the production well;

producing a portion of the hydrocarbons to surface through the production well;

monitoring the production well for the gas breakthrough, and after the gas breakthrough is detected:

producing a further portion of the hydrocarbons by a gas gravity drainage process in which hydrocarbons are drained toward the production well; and

controlling continued production of the hydrocarbons through the production well,

wherein monitoring the production well for the gas breakthrough comprises monitoring at least one of: a production gas to oil ratio (GOR), a hydrocarbon production rate, a gas injection rate, a gas production rate, an injection pressure, a production pressure, a production temperature, or a combination thereof.

4. The process according to claim 3 , wherein detecting the gas breakthrough comprises analyzing monitoring data obtained from at least one of a seismic survey, an observation well, a production log, an injection well-production well communication test, shutting in the production well, shutting in the injection well, or a combination thereof.

5. The process according to claim 3 , wherein the injection well comprises a horizontal multi-lateral injection well.

6. The process according to claim 5 , wherein lateral legs of the multi-lateral injection well are laterally offset from and between lateral legs of the multi-lateral production well.

7. The process according to claim 5 , wherein the ratio of lateral legs of the multi-lateral production well to lateral legs of the multi-lateral injection well is >1:1.

8. The process according to claim 5 , wherein the ratio of lateral legs of the multi-lateral production well to lateral legs of the multi-lateral injection well is 1:1.

9. The process according to claim 5 , wherein the vertical distance between a horizontal segment of the injection well and a horizontal segment of the production well is selected based on a calculated rate of oil recovery and a time to the gas breakthrough.

10. The process according to claim 3 , wherein the injection well comprises an injection well including a single lateral and the lateral of the injection well is disposed laterally between two multi-lateral production wells.

11. The process according to claim 3 , comprising increasing the gas injection pressure to increase a rate of oil recovery and a time to the gas breakthrough.

12. The process according to claim 3 , comprising increasing the differential pressure between the injection well and production well to increase a rate of oil recovery and a time to the gas breakthrough.

13. The process according to claim 3 , comprising decreasing the distance to the gas zone along a straight line between the production well and the injection well to increase the rate of oil recovery and the time to the gas breakthrough.

14. The process according to claim 3 , comprising increasing the production well pressure to reduce the differential pressure with an underlying or overlying thief zone.

15. The process according to claim 3 , comprising recovering hydrocarbons from the subterranean hydrocarbon-bearing for period of time of 4 years or less prior to injecting the gas and recovering the portion of the hydrocarbons.

16. The process according to claim 3 , comprising monitoring the production well prior to injecting the gas and, in response to first production of hydrocarbons through the production well, commencing injecting the gas.

17. The process according to claim 3 , wherein the gas is methane.

18. A process for producing hydrocarbons from a subterranean hydrocarbon-bearing reservoir, the process comprising:

injecting a gas, at a gas injection pressure below a minimum miscibility pressure, into the reservoir through an injection well extending into the reservoir to form a gas zone in the reservoir, the gas injection pressure being suitable to provide a differential pressure, between a bottom-hole production well pressure at a horizontal multi-lateral production well extending into the reservoir and the gas injection pressure, to facilitate sweeping the hydrocarbons toward the production well prior to a gas breakthrough at the production well;

producing a portion of the hydrocarbons to surface through the production well;

monitoring the production well for the gas breakthrough, and after the gas breakthrough is detected:

producing a further portion of the hydrocarbons by a gas gravity drainage process in which hydrocarbons are drained toward the production well; and

controlling continued production of the hydrocarbons through the production well, and

reducing the bottom-hole production well pressure to facilitate sweeping the hydrocarbons toward the production well prior to the gas breakthrough.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 3, 2018
From: ARTHUR, JOHN E.; DRAGANI, JARRETT; KASSAM, NADIM; BUMSTEAD, MICHAEL
To: CENOVUS ENERGY INC.
Reel/Frame 046263/0507 →
Continuity (2)
Provisional Application 62528848 · Jul 5, 2017
Related Publication 20190010792A1 · Jan 10, 2019
Cited By (3)
US 12,298,459 US 12,534,981 US 12,716,337