IP Library Granted Patent US 10,818,403
Granted Patent B2
US 10,818,403 · App. 15/445,186 · Granted Oct 27, 2020

Inter-module fuel shuffling

Inventors: Allyson Kitto (Corvallis, OR); Daniel Ingersoll (Oak Ridge, TN); Jose N. Reyes, Jr. (Corvallis, OR)
Assignee: NuScale Power, LLC
G21C19/205G21C5/18G21C19/07G21D1/00Y02E30/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,818,403
App. No.
15/445,186
Granted
Oct 27, 2020
Kind
B2
Abstract

A method of loading fuel in multiple reactor cores associated with a plurality of fuel cycles. The method includes, in a first fuel cycle, loading a first reactor core with a first fuel assembly selected from a first batch of fuel, loading the first reactor core with a first partially spent fuel assembly from a second batch of fuel, loading a second reactor core with a second fuel assembly from the first batch of fuel, and loading the second reactor core with a second partially spent fuel assembly from the second batch of fuel. In a second fuel cycle, which is performed after a completion of the first fuel cycle, the method includes loading the second reactor core with a fresh fuel assembly, and loading the second reactor core with the first fuel assembly from the first batch of fuel.

Claims (46)

1. A method of operating a power plant having plural reactor cores, the method comprising:

in a first fuel cycle:

providing a fuel configuration for a first reactor core of the plural reactor cores, the providing the fuel configuration for the first reactor core including:

loading the first reactor core with a first fuel assembly selected from a first batch of fuel;

loading the first reactor core with a first partially spent fuel assembly from a second batch of fuel; and

providing a fuel configuration for a second reactor core of the plural reactor cores, the providing the fuel configuration for the second reactor core including:

loading the second reactor core with a second fuel assembly from the first batch of fuel; and

loading the second reactor core with a second partially spent fuel assembly from the second batch of fuel; and

operating the first and second reactor cores with the fuel configurations, respectively; and

in a second fuel cycle, performed after a completion of the first fuel cycle:

providing a new fuel configuration for the second reactor core, the providing the new fuel configuration for the second reactor core including:

loading the second reactor core with a fresh fuel assembly; and

loading the second reactor core with the first fuel assembly from the first batch of fuel; and

operating the second reactor core with the new fuel configuration.

2. The method of claim 1 , wherein loading the second reactor core with the first fuel assembly from the first batch of fuel comprises:

removing the first fuel assembly from the first reactor core; and

replacing the second partially spent fuel assembly with the first fuel assembly.

3. The method of claim 1 , further comprising:

in the first fuel cycle:

providing a fuel configuration for a third reactor core of the plural reactor cores, the providing the fuel configuration for the third reactor core including:

loading the third reactor core with a third fuel assembly selected from the first batch of fuel; and

loading the third reactor core with a third partially spent fuel assembly; and

operating the first, second, and third reactor cores with the fuel configurations, respectively;

wherein the providing the new fuel configuration for the second reactor core further comprises loading the second reactor core with the third partially spent fuel assembly.

4. The method of claim 3 , further comprising:

in the first fuel cycle:

providing a fuel configuration for a fourth reactor core of the plural reactor cores, the providing the fuel configuration for the fourth reactor core including:

loading the fourth reactor core with a fourth fuel assembly selected from a third batch of fuel;

in the second fuel cycle:

providing a new fuel configuration for the third reactor core, the providing the new fuel configuration for the third reactor core including loading the third reactor the fourth fuel assembly; and

operating the second and third reactor cores with the new fuel assemblies, respectively.

5. The method of claim 4 , wherein the first batch of fuel comprises fuel associated with a first nuclear isotope, and wherein the third batch of fuel comprise fuel associated with a second nuclear isotope that is different than the first nuclear isotope.

6. The method of claim 5 , wherein the first batch of fuel comprises uranium-oxide (UO2) fuel, and wherein the third batch of fuel comprises mixed uranium-plutonium oxide (MOX) fuel.

7. The method of claim 4 , wherein loading the third reactor core with the fourth fuel assembly comprises:

removing the third partially spent fuel assembly from the third reactor core; and

replacing the third partially spent fuel assembly with the fourth fuel assembly.

8. The method of claim 4 , further comprising:

after a completion of the second fuel cycle

removing the second partially spent fuel assembly from the second reactor core;

removing the fourth fuel assembly from the third reactor core;

loading the second reactor core with the fourth fuel assembly; and

loading the fourth reactor core with the second partially spent fuel assembly.

9. The method of claim 3 , wherein the third fuel assembly comprises nuclear fuel including at least one isotope of uranium, and wherein the third partially spent fuel assembly comprises nuclear fuel including at least one isotope of plutonium.

10. The method of claim 3 , further comprising:

removing the first partially spent fuel assembly from the first reactor core after the completion of the first fuel cycle; and

loading the third reactor core with the first partially spent fuel assembly after the completion of the first fuel cycle.

Assignments (2)
CONFIRMATORY LICENSE Recorded Sep 17, 2021
From: NUSCALE POWER LLC
To: UNITED STATES DEPARTMENT OF ENERGY
Reel/Frame 057608/0660 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 13, 2017
From: KITTO, ALLYSON; INGERSOLL, DANIEL; REYES, JOSE N., JR.
To: NUSCALE POWER, LLC
Reel/Frame 041555/0845 →
Continuity (2)
Provisional Application 62314523 · Mar 29, 2016
Related Publication 20170301422A1 · Oct 19, 2017