IP Library Granted Patent US 10,843,370
Granted Patent B2
US 10,843,370 · App. 16/000,247 · Granted Nov 24, 2020

Sawmill carriage assembly

Inventors: Sebastien Cabrit (Ontario, CA); Ashlynne Dale (Ontario, CA); Brian Shellswell (Ontario, CA)
Assignee: Norwood Industries Inc.
B27B29/08B23D55/02B27B13/02B27B13/10B27B13/12B27B13/16B27B15/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,843,370
App. No.
16/000,247
Granted
Nov 24, 2020
Kind
B2
Abstract

A method for constructing a lower section of a sawmill carriage assembly comprises holding structural components between a pair of metal plates, and affixing the plates and the structural components together. The structural components may include wheels that guide the sawhead in linear movement along a track on a sawmill bed, to which the carriage base is attached. The structural components may also include a track cleaning system disposed between the metal plates. The track cleaning system maintains optimal track conditions.

Claims (32)

1. A method for constructing a sawmill comprising a carriage assembly, a lower section of the carriage assembly comprising structural components, the structural components include at least two vertical bars and at least two wheel carriage assemblies, the method comprising:

applying opposing forces to the at least two vertical bars of the structural components using two or more vertically extending rigid plates to grip the at least two vertical bars between the two or more vertically extending rigid plates;

applying opposing forces to a wheel carriage frame of each of the at least two wheel carriage assemblies using the two or more vertically extending rigid plates to grip the at least two wheel carriage assemblies between the two or more vertically extending rigid plates;

affixing the two or more vertically extending rigid plates and the structural components together; and

mounting a sawmill assembly to an upper section of the at least two vertical bars;

wherein:

a wheel is disposed in the wheel carriage frame of each of the at least two wheel carriage assemblies; and

said at least two vertical bars are configured to support an upper section of the sawmill carriage.

2. The method of claim 1 , wherein the two or more rigid plates are made of steel.

3. The method of claim 1 , wherein the affixing is by bolts and nuts, rivets or a combination thereof.

4. The method of claim 1 , wherein the at least two wheel carriage assemblies comprise a first wheel carriage assembly and a second wheel carriage assembly, wherein the first wheel carriage assembly is disposed toward a front end of the lower section and the second wheel carriage assembly is disposed toward a rear end of the lower section.

5. The method of claim 1 , wherein each of the wheel carriage assemblies comprises a cover for the wheel.

6. The method of claim 1 , wherein each of the wheels has an annular groove on its outer surface, said annular groove configured to receive a track therein.

7. The method of claim 1 , wherein the structural components further comprise a track cleaning system at the bottom of the lower section held to be in contact with a track of a sawmill bed.

8. The method of claim 7 , wherein the track cleaning system comprises a holder and a track cleaning component disposed within the holder.

9. The method of claim 8 , wherein the track cleaning component is made of felt.

10. The method of claim 7 , wherein the track cleaning component is configured with a recess at its bottom.

11. The method of claim 7 , wherein the track cleaning system is fixed to each of the at least two wheel carriage assemblies.

12. The method of claim 7 , wherein the track cleaning system is disposed at a front end of the lower section.

13. The method of claim 1 , wherein the sawmill assembly supports and/or guides one or more of a saw head, a saw engine, a saw controller, and a saw lubricator apparatus.

14. A sawmill comprising a lower carriage assembly, the lower carriage assembly comprising:

two or more vertically extending rigid plates; and

structural components, comprising:

at least two vertical bars; and

at least two wheel carriage assemblies, each including a wheel carriage frame and a wheel disposed in the wheel carriage frame; and

a sawmill assembly mounted on an upper section of the at least two vertical bars;

wherein:

the two or more vertically extending rigid plates apply opposing forces to the at least two vertical bars to grip the at least two vertical bars between the two or more vertically extending rigid plates;

the two or more vertically extending rigid plates apply opposing forces to each of the wheel carriage frames to grip the at least two wheel carriage assemblies between the two or more vertically extending rigid plates; and

the two or more vertically extending rigid plates and the structural components are affixed together.

15. The sawmill of claim 14 , further comprising a control bar, said control bar extending from said sawmill carriage assembly to proximal to a sawmill bed track, said control bar to prevent destabilization of said sawmill carriage assembly in relation to said track.

16. The sawmill of claim 15 , wherein said control bar further comprises a hook extending partially around a bottom of said track.

Assignments (5)
RELEASE OF SECURITY INTEREST Recorded Jan 27, 2026
From: MONROE CAPITAL MANAGEMENT ADVISORS, LLC, AS COLLATERAL AGENT
To: NORWOOD INDUSTRIES INC.
Reel/Frame 073602/0179 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 5, 2025
From: NORWOOD INDUSTRIES INC.
To: 1001355216 ONTARIO INC.
Reel/Frame 072798/0145 →
CHANGE OF NAME Recorded Nov 5, 2025
From: 1001355216 ONTARIO INC.
To: NORWOOD INDUSTRIES (CANADA) INC.
Reel/Frame 073483/0278 →
SECURITY INTEREST Recorded Nov 3, 2021
From: NORWOOD INDUSTRIES INC.
To: MONROE CAPITAL MANAGEMENT ADVISORS, LLC, AS COLLATERAL AGENT
Reel/Frame 058010/0128 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 28, 2018
From: CABRIT, SEBASTIEN; DALE, ASHLYNNE; SHELLSWELL, BRIAN
To: NORWOOD INDUSTRIES INC.
Reel/Frame 047604/0681 →
Priority Claims (1)
CA 2969794 · Jun 6, 2017 · national
Continuity (1)
Related Publication 20180345524A1 · Dec 6, 2018
Cited By (1)
US 1,125,301