IP Library › Granted Patent US 10,849,180
Granted Patent B2
US 10,849,180 · App. 16/209,688 · Granted Nov 24, 2020

Dynamic spectrum sharing in 4G and 5G

Inventors: Yasmin Karimli (Kirkland, WA); Gunjan Nimbavikar (Bellevue, WA)
Assignee: T-Mobile USA, Inc.
H04W76/16H04L5/0007H04L5/0035H04L5/0064H04W28/0268H04W48/06H04W48/18H04W72/0453H04W88/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,849,180
App. No.
16/209,688
Filed
Dec 4, 2018
Granted
Nov 24, 2020
Kind
B2
Art Unit
2461
USPC
370/329
Abstract

Techniques for dynamically allocating frequency resources in accordance with wireless access technologies are discussed herein. For example, a base station can determine whether user equipment (UE) requesting communications at the base station are configured to operate in accordance with 4 th Generation (5G) radio access technologies and/or in accordance with 5 th Generation (5G) radio access technologies. Based on the number of 5G UEs and 4G UEs, a first portion of a frequency resource can be allocated to 5G and a second portion of the frequency resource can be allocated to 4G. In some examples, a first allocation strategy for a first frequency resource (e.g., Band 71) can be used to generate a second allocation strategy for a partially overlapping second frequency resource (e.g., Band 41).

Claims (62)

1. A system comprising:

one or more processors;

a memory; and

one or more components stored in the memory and executable by the one or more processors to perform operations comprising:

receiving, from a first user equipment (UE), a first indication of a first communication request;

determining that the first UE is configured to communicate using a first radio access technology and a second radio access technology, wherein the first radio access technology is a 5 th Generation (5G) radio access technology and wherein the second radio access technology is a 4 th Generation (4G) radio access technology;

determining a first number of a first plurality of UEs that are configured to communicate via the first radio access technology and the second radio access technology, wherein the first UE is one of the first plurality of UEs;

receiving, from a second UE, a second indication of a second communication request;

determining that the second UE is configured to communicate via the second radio access technology and is not configured to communicate via the first radio access technology;

determining a second number of a second plurality of UEs that are configured to communicate using the second radio access technology and not the first radio access technology, wherein the second UE is one of the second plurality of UEs;

allocating, for a time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a first set of frequency resources to a first base station configured to communicate in accordance with the first radio access technology and a second set of frequency resources to a second base station configured to communicate in accordance with the second radio access technology; and

allocating, for the time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a third set of frequency resources to the first base station configured to communicate in accordance with the first radio access technology and a fourth set of frequency resources to the second base station configured to communicate in accordance with the second radio access technology,

wherein the first set of frequency resources and the second set of frequency resources are associated with a first frequency resource band, and

wherein the third set of frequency resources and the fourth set of frequency resources are associated with a second frequency resource band.

2. The system of claim 1 , wherein the operations further comprise:

determining that the first communication request is associated with a non-guaranteed bit rate (GBR) communication type; and

determining that the second communication request is associated with the non-GBR communication type.

3. The system of claim 1 , wherein the second number of the second plurality of UEs is larger than the first number of the first plurality of UEs, and wherein the first set of frequency resources is larger than the second set of frequency resources.

4. The system of claim 1 , wherein the first frequency resource band comprises first frequency resources associated with a Long-Term Evolution (LTE) Band 71 or a 5G Band 71 and the second frequency resource band comprises second frequency resources associated with an LTE Band 41 or a 5G Band 41.

5. The system of claim 1 , wherein determining that the first UE is configured to communicate using the first radio access technology and the second radio access technology is based at least in part on an International Mobile Equipment Identity (IMEI) number associated with the first UE.

6. The system of claim 1 , wherein allocating the first set of frequency resources to the first base station configured to communicate in accordance with the first radio access technology and the second set of frequency resources to the second base station configured to communicate in accordance with the second radio access technology is based at least in part on an allocation model.

7. The system of claim 1 , wherein the operations further comprise:

receiving, from a third UE, a third indication of a third communication request;

determining that the third UE is configured to communicate using the first radio access technology and the second radio access technology;

determining a congestion level associated with the first set of frequency resources;

determining that the congestion level is above a threshold congestion level; and

increasing a number of the first set of frequency resources based at least in part on the congestion level being above the threshold congestion level.

8. A first base station comprising:

one or more processors;

a memory; and

one or more components stored in the memory and executable by the one or more processors to perform operations comprising:

receiving, from a first user equipment (UE), a first indication of a first communication request;

determining a first number of a first plurality of UEs that are configured to communicate using a first radio access technology and a second radio access technology, wherein the first UE is one of the first plurality of UEs, and wherein the first plurality of UEs have requested a first plurality of communications associated with a non-guaranteed bit rate (GBR) communication type;

receiving, from a second UE, a second indication of a second communication request;

determining a second number of a second plurality of UEs that are configured to communicate using the first radio access technology and not the second radio access technology, wherein the second UE is one of the second plurality of UEs, and wherein the second plurality of UEs have requested second communications associated with the non-GBR communication type;

allocating, for a time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a first set of frequency resources to the first base station configured to communicate in accordance with the first radio access technology and a second set of frequency resources to a second base station configured to communicate in accordance with the second radio access technology;

receiving, from a third UE, a third indication of a third communication request;

determining that the third UE is configured to communicate using the first radio access technology and the second radio access technology;

determining a congestion level associated with the first set of frequency resources;

determining that the congestion level is above a threshold congestion level; and

increasing a size of the first set of frequency resources based at least in part on the congestion level being above the threshold congestion level.

9. The first base station of claim 8 , wherein the first radio access technology is a 5 th Generation (5G) radio access technology and wherein the second radio access technology is a 4 th Generation (4G) radio access technology.

10. The first base station of claim 8 , wherein a first coverage area associated with the first base station partially overlaps a second coverage area associated with the second base station.

11. The first base station of claim 8 , wherein the first base station is a gNodeB configured in accordance with a 5 th Generation (5G) radio access technology, and wherein the first base station is configurable to communicate with frequency resources associated with a long-term evolution (LTE) Band 71 or a 5G Band 71, an LTE Band 41 or a 5G Band 41, and a Citizens Broadband Radio Service (CBRS).

12. The first base station of claim 11 , wherein the first set of frequency resources allocated to the first base station is a first allocation, wherein the first set of frequency resources include at least a portion of first frequencies associated with the LTE Band 71 or the 5G Band 71, and wherein the operations further comprise:

allocating, for the time period, and based at least in part on the first allocation, a second allocation including a third set of frequency resources to the first base station, wherein the third set of frequency resources include a portion of second frequencies associated with the LTE Band 41 or the 5G Band 41.

13. The first base station of claim 12 , wherein a first coverage area associated with the first set of frequency resources partially overlaps a second coverage area associated with the second set of frequency resources.

14. A method implemented by one or more processors, the method comprising:

receiving, from a first user equipment (UE), a first indication of a first communication request;

determining a first number of a first plurality of UEs that are configured to communicate using a first radio access technology and a second radio access technology, wherein the first UE is one of the first plurality of UEs, and wherein the first plurality of UEs have requested a first plurality of communications associated with a non-guaranteed bit rate (GBR) communication type;

receiving, from a second UE, a second indication of a second communication request;

determining a second number of a second plurality of UEs that are configured to communicate using the first radio access technology and not the second radio access technology, wherein the second UE is one of the second plurality of UEs, and wherein the second plurality of UEs have requested second communications associated with the non-GBR communication type;

allocating, for a time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a first set of frequency resources to a first base station configured to communicate in accordance with the first radio access technology and a second set of frequency resources to a second base station configured to communicate in accordance with the second radio access technology;

receiving, from a third UE, a third indication of a third communication request;

determining that the third UE is configured to communicate using the first radio access technology and the second radio access technology;

determining a congestion level associated with the first set of frequency resources;

determining that the congestion level is above a threshold congestion level; and

increasing a size of the first set of frequency resources based at least in part on the congestion level being above the threshold congestion level.

15. The method of claim 14 , wherein the first base station is a gNodeB configured in accordance with a 5 th Generation (5G) radio access technology, and wherein the first base station is configurable to communicate with frequency resources associated with a long-term evolution (LTE) Band 71 or a 5G Band 71, an LTE Band 41 or a 5G Band 41, and a Citizens Broadband Radio Service (CBRS).

16. The method of claim 15 , wherein the first set of frequency resources allocated to the first base station is a first allocation, wherein the first set of frequency resources include at least a portion of first frequencies associated with the LTE Band 71 or the 5G Band 71, and wherein the method further comprises:

allocating, for the time period, and based at least in part on the first allocation, a second allocation including a third set of frequency resources to the first base station, wherein the third set of frequency resources include a portion of second frequencies associated with the LTE Band 41 or the 5G Band 41.

17. The method of claim 16 , wherein a first coverage area associated with the first set of frequency resources partially overlaps a second coverage area associated with the second set of frequency resources.

Assignments (3)
RELEASE OF SECURITY INTEREST Recorded Aug 23, 2022
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: IBSV LLC; LAYER3 TV, LLC; PUSHSPRING, LLC; T-MOBILE CENTRAL LLC; T-MOBILE USA, INC.; ASSURANCE WIRELESS USA, L.P.; BOOST WORLDWIDE, LLC; CLEARWIRE COMMUNICATIONS LLC; CLEARWIRE IP HOLDINGS LLC; SPRINTCOM LLC; SPRINT COMMUNICATIONS COMPANY L.P.; SPRINT INTERNATIONAL INCORPORATED; SPRINT SPECTRUM LLC
Reel/Frame 062595/0001 →
SECURITY AGREEMENT Recorded Apr 2, 2020
From: T-MOBILE USA, INC.; ISBV LLC; T-MOBILE CENTRAL LLC; LAYER3 TV, INC.; PUSHSPRING, INC.; BOOST WORLDWIDE, LLC; CLEARWIRE COMMUNICATIONS LLC; CLEARWIRE IP HOLDINGS LLC; CLEARWIRE LEGACY LLC; SPRINT COMMUNICATIONS COMPANY L.P.; SPRINT INTERNATIONAL INCORPORATED; SPRINT SPECTRUM L.P.; ASSURANCE WIRELESS USA, L.P.
To: DEUTSCHE BANK TRUST COMPANY AMERICAS
Reel/Frame 053182/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 4, 2018
From: KARIMLI, YASMIN; NIMBAVIKAR, GUNJAN
To: T-MOBILE USA, INC.
Reel/Frame 048350/0329 →
Continuity (1)
Related Publication 20200178334A1 · Jun 4, 2020
Cited By (88)
US 12,231,906 US 12,245,046 US 12,262,214 US 12,273,730 US 12,289,602 US 12,289,603 US 12,289,604 US 12,294,867 US 12,302,115 US 12,309,598 US 12,309,604 US 12,309,605 US 12,317,090 US 12,323,814 US 12,323,815 US 12,328,591 US 12,328,592 US 12,335,743 US 12,342,174 US 12,348,973 US 12,348,974 US 12,348,975 US 12,363,550 US 12,369,040 US 12,375,931 US 12,375,932 US 12,375,933 US 12,382,297 US 12,382,299 US 12,395,854 US 12,402,014 US 12,432,569 US 12,432,570 US 12,439,265 US 12,445,855 US 12,445,856 US 12,445,857 US 12,445,858 US 12,452,683 US 12,452,684 US 12,470,938 US 12,470,939 US 12,470,940 US 12,483,897 US 12,483,898 US 12,490,103 US 12,490,104 US 12,490,105 US 12,495,307 US 12,501,272 US 12,507,073 US 12,507,074 US 12,507,075 US 12,507,076 US 12,520,162 US 12,526,640 US 12,549,954 US 12,549,955 US 12,563,403 US 12,563,404 US 12,574,745 US 12,574,746 US 12,581,315 US 12,581,316 US 12,587,866 US 12,598,474 US 12,598,475 US 12,604,198 US 12,604,200 US 12,604,201 US 12,604,202 US 12,604,203 US 12,621,675 US 12,627,991 US 12,627,992 US 12,627,993 US 12,627,994 US 12,634,708 US 12,641,442 US 12,647,797 US 12,652,544 US 12,684,360 US 12,689,906 US 12,689,907 US 12,701,424 US 12,720,321 US 12,739,647 US 12,745,094