Using a digital twin to facilitate environment-specific prognostic-surveillance operations for engineering assets in the field

Inventors: Kenny C. Gross (Escondido, CA); Guang C. Wang (San Diego, CA)
Assignee: Oracle International Corporation
G05B23/0205G05B23/0243G06F30/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,860,011
App. No.
16/371,694
Granted
Dec 8, 2020
Kind
B2
Abstract

During operation, the system receives time-series signals from sensors in the asset while the asset is operating. Next, the system obtains real-time environmental parameters for an environment in which the asset is operating. The system then selects an environment-specific inferential model for the asset based on the real-time environmental parameters, wherein the environment-specific inferential model was trained on a golden system while the golden system was operating in an environment that matches the real-time environmental parameters. Next, the system uses the environment-specific inferential model to generate estimated values for the received time-series signals based on correlations among the received time-series signals, and performs a pairwise-differencing operation between actual values and the estimated values for the received time-series signals to produce residuals. Finally, the system determines from the residuals whether the asset is operating correctly.

Claims (79)

1. A method for performing environment-specific prognostic-surveillance operations for an asset, comprising:

receiving time-series signals from sensors in the asset while the asset is operating;

obtaining real-time environmental parameters for an environment in which the asset is operating;

selecting an environment-specific inferential model for the asset based on the real-time environmental parameters, wherein the environment-specific inferential model was trained on a golden system while the golden system was operating in an environment that matches the real-time environmental parameters, wherein a configuration of the golden system matches a configuration of the asset, and wherein the golden system was certified to be operating correctly;

using the environment-specific inferential model to generate estimated values for the received time-series signals based on correlations among the received time-series signals;

performing a pairwise-differencing operation between actual values and the estimated values for the received time-series signals to produce residuals; and

determining from the residuals whether the asset is operating correctly.

2. The method of claim 1 , wherein determining from the residuals whether the asset is operating correctly involves:

performing a sequential probability ratio test (SPRT) on the residuals to produce SPRT alarms; and

determining from the SPRT alarms whether the asset is operating correctly.

3. The method of claim 1 , wherein prior to receiving the time-series signals, the method further comprises generating a set of environment-specific inferential models by:

gathering environment-specific time-series signals from the golden system while the golden system operates in an environmental-testing facility, which is cycling through different combinations of environmental parameters;

training a different environment-specific inferential model using time-series signals for each of the different combinations of environmental parameters; and

storing the different environment-specific inferential models to facilitate subsequent environment-specific prognostic-surveillance operations.

4. The method of claim 1 ,

wherein using the environment-specific inferential model to generate the estimated values for the received time-series signals involves generating estimated values for a sliding time window of values for the received time-series signals;

wherein the method further comprises using a telemetry parameter synthesis (TPSS) technique to project the estimated values for the received time-series signals into the future based on the time window; and

wherein the pairwise-differencing operation is performed between the projected estimated values and the actual values for the received time-series signals.

5. The method of claim 1 , wherein the real-time environmental parameters include one or more of the following:

an ambient temperature;

a relative humidity; and

an altitude.

6. The method of claim 1 , wherein the asset comprises one of the following:

a component in a power-generation system; and

a component in a power-transmission system.

7. The method of claim 1 , wherein the inferential model comprises a Multivariate State Estimation Technique (MSET) model.

8. A non-transitory, computer-readable storage medium storing instructions that when executed by a computer cause the computer to execute a method for performing environment-specific prognostic-surveillance operations for an asset, the method comprising:

receiving time-series signals from sensors in the asset while the asset is operating;

obtaining real-time environmental parameters for an environment in which the asset is operating;

selecting an environment-specific inferential model for the asset based on the real-time environmental parameters, wherein the environment-specific inferential model was trained on a golden system while the golden system was operating in an environment that matches the real-time environmental parameters, wherein a configuration of the golden system matches a configuration of the asset, and wherein the golden system was certified to be operating correctly;

using the environment-specific inferential model to generate estimated values for the received time-series signals based on correlations among the received time-series signals;

performing a pairwise-differencing operation between actual values and the estimated values for the received time-series signals to produce residuals; and

determining from the residuals whether the asset is operating correctly.

9. The non-transitory, computer-readable storage medium of claim 8 , wherein determining from the residuals whether the asset is operating correctly involves:

performing a SPRT on the residuals to produce SPRT alarms; and

determining from the SPRT alarms whether the asset is operating correctly.

10. The non-transitory, computer-readable storage medium of claim 8 , wherein prior to receiving the time-series signals, the method further comprises generating a set of environment-specific inferential models by:

gathering environment-specific time-series signals from the golden system while the golden system operates in an environmental-testing facility, which is cycling through different combinations of environmental parameters;

training a different environment-specific inferential model using time-series signals for each of the different combinations of environmental parameters; and

storing the different environment-specific inferential models to facilitate subsequent environment-specific prognostic-surveillance operations.

11. The non-transitory, computer-readable storage medium of claim 8 ,

wherein using the environment-specific inferential model to generate the estimated values for the received time-series signals involves generating estimated values for a sliding time window of values for the received time-series signals;

wherein the method further comprises using a TPSS technique to project the estimated values for the received time-series signals into the future based on the time window; and

wherein the pairwise-differencing operation is performed between the projected estimated values and the actual values for the received time-series signals.

12. The non-transitory, computer-readable storage medium of claim 8 , wherein the real-time environmental parameters include one or more of the following:

an ambient temperature;

a relative humidity; and

an altitude.

13. The non-transitory, computer-readable storage medium of claim 8 , wherein the asset comprises one of the following:

a component in a power-generation system; and

a component in a power-transmission system.

14. The non-transitory, computer-readable storage medium of claim 8 , wherein the inferential model comprises an MSET model.

15. A system that performs environment-specific prognostic-surveillance operations for an asset, comprising:

at least one processor and at least one associated memory; and

a prognostic-surveillance mechanism that executes on the at least one processor, wherein during operation, the prognostic-surveillance mechanism:

receives time-series signals from sensors in the asset while the asset is operating;

obtains real-time environmental parameters for an environment in which the asset is operating;

selects an environment-specific inferential model for the asset based on the real-time environmental parameters, wherein the environment-specific inferential model was trained on a golden system while the golden system was operating in an environment that matches the real-time environmental parameters, wherein a configuration of the golden system matches a configuration of the asset, and wherein the golden system was certified to be operating correctly;

uses the environment-specific inferential model to generate estimated values for the received time-series signals based on correlations among the received time-series signals;

performs a pairwise-differencing operation between actual values and the estimated values for the received time-series signals to produce residuals; and

determines from the residuals whether the asset is operating correctly.

16. The system of claim 15 , wherein while determining from the residuals whether the asset is operating correctly, the prognostic surveillance mechanism:

performs a sequential probability ratio test (SPRT) on the residuals to produce SPRT alarms; and

determines from the SPRT alarms whether the asset is operating correctly.

17. The system of claim 15 , wherein prior to receiving the time-series signals, the prognostic-surveillance mechanism generates a set of environment-specific inferential models, during which process, the prognostic-surveillance mechanism:

gathers environment-specific time-series signals from the golden system while the golden system operates in an environmental-testing facility, which is cycling through different combinations of environmental parameters;

trains a different environment-specific inferential model using time-series signals for each of the different combinations of environmental parameters; and

stores the different environment-specific inferential models to facilitate subsequent environment-specific prognostic-surveillance operations.

18. The system of claim 15 ,

wherein while using the environment-specific inferential model to generate the estimated values for the received time-series signals, the prognostic-surveillance mechanism generates estimated values for a sliding time window of values for the received time-series signals;

wherein the prognostic-surveillance mechanism additionally uses a TPSS technique to project the estimated values for the received time-series signals into the future based on the time window; and

wherein the pairwise-differencing operation is performed between the projected estimated values and the actual values for the received time-series signals.

19. The system of claim 15 , wherein the real-time environmental parameters include one or more of the following:

an ambient temperature;

a relative humidity; and

an altitude.

20. The system of claim 15 , wherein the asset comprises one of the following:

a component in a power-generation system; and

a component in a power-transmission system.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 18, 2019
From: GROSS, KENNY C.; WANG, GUANG C.
To: ORACLE INTERNATIONAL CORPORATION
Reel/Frame 048927/0665 →
Continuity (1)
Related Publication 20200310396A1 · Oct 1, 2020
Cited By (12)
US 12,332,111 US 12,347,238 US 12,385,777 US 12,401,438 US 12,411,158 US 12,462,190 US 12,475,913 US 12,495,989 US 12,499,003 US 12,639,400 US 12,705,530 US 12,736,395