IP Library Granted Patent US 10,883,336
Granted Patent B2
US 10,883,336 · App. 15/211,762 · Granted Jan 5, 2021

Well abandonment using vibration to assist cement placement

Inventors: Jean-Marie Prieur (Aberdeen, GB); Andrew Hood (Aberdeen, GB); Ian Milne (Aberdeen, GB); Stephen Cromar (Aberdeen, GB)
Assignee: CONOCOPHILLIPS COMPANY
E21B33/134E21B28/00E21B33/13
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,883,336
App. No.
15/211,762
Granted
Jan 5, 2021
Kind
B2
Abstract

A method of cementing an oil or gas well for abandonment comprises cutting the production tubing 6 above the production packer 8 , setting a tubing plug 9 in the tubing and then cutting the tubing. A bridge plug may be installed at the level of the cut, which spans the full diameter of the well casing 3 . An agitator assembly 20 comprising an agitator 24 , packer 21 and burst sub 23 , with a running tool fitted to the top, is run down the tubing on wire line. Cement is then injected into the tubing 6 , which flows through the agitator assembly and causes the tubing to vibrate. The cement fills the tubing but also flows back up the A annulus between the casing and production tubing. Vibration of the tubing assists the formation of a good quality cement plug extending all around the annulus over a substantial length of the well.

Claims (32)

1. A process for through-tubing plugging of a hydrocarbon well for abandonment, wherein the well comprises a Xmas tree, a casing, with original cement between the casing and rock formation, and production tubing extending within the casing, the production tubing being centralized at the top and bottom of the well only, wherein a machined surface of the production tubing rests against a machined surface of the casing over a large proportion of the length of the production tubing, the process comprising the steps of:

(a) setting a plug in the production tubing;

(b) whilst leaving the casing and original cement in place, cutting or perforating the production tubing above the plug to create a cut end of the production tubing or perforations in a wall of the production tubing;

(c) injecting a settable medium into the production tubing such that it passes between the production tubing and the casing;

(d) during and/or after the injection of settable medium, moving or agitating the production tubing using an agitator device in order to allow or induce the sellable medium to pass all around the production tubing,

wherein said agitator device is delivered through the Xmas tree into the production tubing to a desired point whereby said agitator device is located within the production tubing adjacent the cut end or perforations.

2. The process according to claim 1 , wherein one or more additional agitator devices are placed at different points in the production tubing.

3. The process according to claim 1 , wherein the agitator device is energized by an un-set settable medium, passing through the agitator device.

4. The process according to claim 1 , wherein in step (b) the production tubing is cut to create a cut end and, prior to injection of the settable medium, an additional plug is placed across the internal diameter of the casing, adjacent the cut end.

5. The process according to claim 1 , wherein the settable medium is cement.

6. The process according to claim 1 , wherein the agitator device causes reciprocal movement or vibration of the production tubing which, in the region of the agitator, has a mean amplitude in the direction transverse to the tubing of at least 10 mm.

7. The process according to claim 1 , wherein the agitator device causes reciprocal movement or vibration of the production tubing which, at a distance of 2000 ft along the tubing from the agitator, has a mean amplitude in the direction transverse to the tubing of at least 5 mm.

8. The process according to claim 1 , wherein the agitator device causes reciprocal movement or vibration of the production tubing which, at a distance of 2000 ft along the tubing from the agitator, has a mean amplitude in the axial direction of at least 5 mm.

9. A process for plugging a hydrocarbon well for abandonment, wherein the well comprises a Xmas tree, a casing and production tubing, the production tubing being centralized at the top and bottom of the well only, wherein a machined surface of the production tubing rests against a machined surface of the casing over a large proportion of the length of the production tubing, the process comprising the steps of:

(a) setting a plug in the production tubing;

(b) cutting or perforating the production tubing above the plug to create a cut end of the production tubing or perforations in a wall of the production tubing;

(c) installing in the production tubing an agitator assembly capable of being run through production tubing in the hydrocarbon well, the assembly comprising:

(i) a packer capable of being activated to anchor the assembly at a selected point in the production tubing, whilst allowing fluid to flow through the production tubing; and, assembled thereto

(ii) an agitator device for producing vibration or reciprocal movement of the tubing;

(d) injecting a settable medium into the production tubing such that it passes between the production tubing and the casing;

(e) during and/or after the injection of settable medium, moving or agitating the production tubing using the agitator device in order to allow or induce the settable medium to enter the full circumference of the annular space,

wherein said agitator assembly is delivered through the Xmas tree into the production tubing to a desired point whereby said agitator device is located within the production tubing adjacent the cut end or perforations.

10. The process according to claim 9 , wherein one or more additional agitator devices are placed at different points in the production tubing.

11. The process according to claim 9 , wherein the agitator device is energized by an un-set settable medium, passing through the agitator device.

12. The process according to claim 9 , wherein the settable medium is cement.

13. The process according to claim 9 , wherein the agitator device causes reciprocal movement or vibration of the production tubing which, in the region of the agitator, has a mean amplitude in the direction transverse to the production tubing of at least 10 mm.

14. The process according to claim 9 , wherein the agitator device causes reciprocal movement or vibration of the production tubing which, at a distance of 2000 ft along the tubing from the agitator, has a mean or minimum amplitude in the direction transverse to the production tubing of at least 5 mm.

15. The process according to claim 9 , wherein the agitator device causes reciprocal movement or vibration of the production tubing which, at a distance of 2000 ft along the production tubing from the agitator, has a mean or minimum amplitude in the axial direction of at least 5 mm.

16. The process according to claim 9 , wherein fluid flowing through the agitator device creates vibration or reciprocal movement of the production tubing.

17. The process according to claim 9 , wherein the agitator assembly comprises a burst sub.

18. The process according to claim 9 , wherein the agitator assembly comprises a running tool.

19. The process according to claim 9 , wherein the agitator assembly comprises a non-return valve located between the agitator device and the packer.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 23, 2016
From: PRIEUR, JEAN-MARIE; HOOD, ANDREW; MILNE, IAN; CROMAR, STEPHEN
To: CONOCOPHILLIPS COMPANY
Reel/Frame 039838/0504 →
Continuity (2)
Provisional Application 62193801 · Jul 17, 2015
Related Publication 20170016305A1 · Jan 19, 2017
Cited By (2)
US 12,281,537 US 12,571,282