IP Library Granted Patent US 10,928,792
Granted Patent B2
US 10,928,792 · App. 15/652,860 · Granted Feb 23, 2021

Parallel manufacturing systems and methods

Inventor: Yong Jin (Beijing, CN)
G05B19/042D05B25/00D05B41/00D05B75/00G05B19/41845G06Q10/0631G06Q10/087G06Q50/04G05B2219/2626
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,928,792
App. No.
15/652,860
Granted
Feb 23, 2021
Kind
B2
Abstract

The invention provides methods, equipment and apparatuses for a highly flexible assembly system. The system may include at least one item of mobile equipment, at least one mobile container and at least one manufacturing management system (MMS). Because it is so flexible, the system may allow for efficient simultaneous processing of multiple dissimilar products. The system may also accommodate manufacturing processes requiring hybrid methods.

Claims (18)

1. A manufacturing system, the system comprising:

a location;

at least one mobile container;

a first mobile machine; and

a second mobile machine;

wherein:

the system alternates sequentially between a first state, a second state, a third state, and a fourth state;

in the first state, the mobile container and the first mobile machine are within a predetermined distance from the location, the second mobile machine is situated outside of the predetermined distance from the location;

in the second state, the first mobile machine is within the predetermined distance from the location, the mobile container and the second mobile machine are situated outside of the predetermined distance from the location;

in the third state, the first mobile machine and the mobile container are within the predetermined distance from the location, the second mobile machine is situated outside of the predetermined distance from the location; and

in the fourth state, the mobile container and the second mobile machine are within the predetermined distance from the location, and the first mobile machine is situated outside of the predetermined distance from the location.

2. The system of claim 1 wherein the location is a fixed position on a floor.

3. The system of claim 1 wherein the location is a position on a floor which varies over time.

4. The system of claim 1 further comprising a floor grid, wherein the floor grid defines a plurality of alternative locations, said alternative locations being located outside of the predetermined distance from the location.

5. The system of claim 1 wherein the mobile machines are assembly line machines.

6. The system of claim 1 wherein the system further comprises process logic, the process logic being configured to manage the mobile container, the first mobile machine and the second mobile machine, the process logic being designed to avoid bottlenecks at either the mobile container, the first mobile machine and/or the second mobile machine.

7. The system of claim 1 further comprising a manufacturing management system, the manufacturing management system being configured to alternate, according to a manufacturing scheme, the system between the states included in the plurality of states.

8. The system of claim 1 wherein, when the mobile container and the first mobile machine are within the predetermined distance from the location, and the mobile container and the first mobile machine are in contact with a floor, the mobile container and the first mobile machine have a higher frictional coefficient with the floor than do a second mobile container and the second mobile machine when the second mobile container and the second mobile machine are in a transition period, said transition period occurring between at least two states, and, therefore, the second mobile container and the second mobile machine are situated outside of the predetermined distance from the location.

Assignments (9)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 22, 2021
From: DRESSME WQZ LIMITED
To: LERIDGE CORPORATION
Reel/Frame 054992/0769 →
SECURITY INTEREST Recorded Dec 13, 2020
From: LERIDGE GLOBAL CORPORATION
To: FAROOQ, SHAJI
Reel/Frame 054624/0325 →
AGREEMENT TO ASSIGNMENTS Recorded Dec 13, 2020
From: JIN, YONG
To: LERIDGE GLOBAL CORPORATION
Reel/Frame 054711/0574 →
SECURITY INTEREST Recorded Dec 13, 2020
From: LERIDGE GLOBAL CORPORATION
To: SORENSEN, PAUL
Reel/Frame 054717/0042 →
SECURITY INTEREST Recorded Dec 13, 2020
From: LERIDGE GLOBAL CORPORATION
To: SORENSEN, PAUL
Reel/Frame 054717/0049 →
SECURITY INTEREST Recorded Dec 13, 2020
From: LERIDGE GLOBAL CORPORATION
To: SPRAYREGEN, JAMES H.M.
Reel/Frame 054717/0063 →
SECURITY INTEREST Recorded Dec 13, 2020
From: LERIDGE GLOBAL CORPORATION
To: JIN, YONG
Reel/Frame 054717/0071 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 27, 2020
From: LERIDGE GLOBAL CORPORATION
To: DRESSME WQZ LIMITED
Reel/Frame 054477/0721 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 18, 2017
From: JIN, YONG
To: LERIDGE GLOBAL CORPORATION
Reel/Frame 043034/0429 →
Continuity (2)
Provisional Application 62366252 · Jul 25, 2016
Related Publication 20180024518A1 · Jan 25, 2018
Cited By (1)
US 12,380,381