IP Library › Granted Patent US 10,961,960
Granted Patent B2
US 10,961,960 · App. 16/769,241 · Granted Mar 30, 2021

Rail for high-pressure direct injection

Inventor: Shuji Suzuki (Shizuoka, JP)
Assignee: USUI CO., LTD.
F02M55/025F02M55/005F02M69/465F02M2200/856F02M2200/857
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,961,960
App. No.
16/769,241
Granted
Mar 30, 2021
Kind
B2
Abstract

The present invention aims for obtaining a fuel rail for gasoline direct injection which can be used for the direct injection at a high fuel pressure of 50 MPa or more by increasing the thickness at the portion near the branch hole and using the material having high thickness for the metal seal portion while keeping the weight light and keeping the cost low. A fuel rail for gasoline direct injection made of steel and used at a fuel pressure of 50 MPa or more, the fuel rail having: a plurality of block members 2; and a pipe member 1 which connects an interval between the block members, wherein the block members 2 have: a branch hole 3 which communicates with the pipe member 1; and a metal seal portion 6 to which an injector is connected, and the hardness of the block members 2 is higher than the hardness of the pipe member 1.

Claims (8)

1. A fuel rail for gasoline direct injection made of steel and used at a fuel pressure of 50 MPa or more, the fuel rail comprising:

a plurality of block members; and

a pipe member which connects an interval between the block members, wherein the block members have:

a branch hole which communicates with the pipe member; and

a metal seal portion to which an injector is connected, and

the hardness of the block members is higher than the hardness of the pipe member.

2. The fuel rail for gasoline direct according to claim 1 , wherein

a reinforcing member is installed in the interval between the block members in an arrangement direction of the pipe member to increase rigidity of the interval between the block members.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2020
From: SUZUKI, SHUJI
To: USUI CO., LTD.
Reel/Frame 052818/0111 →
Priority Claims (1)
JP JP2017-247196 · Dec 25, 2017 · national
Continuity (1)
Related Publication 20200340435A1 · Oct 29, 2020