IP Library › Granted Patent US 10,967,895
Granted Patent B2
US 10,967,895 · App. 16/150,573 · Granted Apr 6, 2021

Method for safe supervision of train integrity and use of on-board units of an automatic train protection system for supervision train integrity

Inventors: Harald Bauer (Backnang, DE); Veit Lauterberg (Neuhausen, DE); Christian Wallner (Weil der Stadt, DE); Klaus Mindel (Affalterbach, DE)
Assignee: THALES MANAGEMENT & SERVICES DEUTSCHLAND GMBH
B61L27/0094B61L15/0027B61L15/0054B61L23/34B61L25/025B61L25/021B61L25/023B61L2027/0044
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,967,895
App. No.
16/150,573
Granted
Apr 6, 2021
Kind
B2
Abstract

A method for safe supervising train integrity includes: (a) acquiring first position data of the first carriage via a first tracking unit which is installed on-board of a first carriage and acquiring second position data of a second carriage via a second tracking unit which is installed on-board of the second carriage, wherein the position data is related to a rail route coordinate system; (b) determining a deviation between a reference value which depends on the length of the train and a position value which depends on position data of at least one of the tracking units; (c) detecting whether train integrity is given by analyzing the deviation; (d) repeating steps a) through c); wherein the tracking units are part of on-board units of an automatic train protection system. Thus a cost-efficient method for supervising train integrity which complies with safety level SIL4 can be realized.

Claims (15)

1. A method for safe supervising train integrity, at SIL4-level, the method comprising the steps of:

a) providing a train on a track, the train comprising a first carriage connected directly or indirectly to a second carriage, the first carriage having a first SIL4-proved tracking unit and the second carriage having a second SIL4-proved tracking unit, wherein the first carriage is located at one end of the train and the second carriage is located at the other end of the train, wherein each tracking unit is configured to wirelessly transmit a position data of its respective carriage;

b) acquiring a first position data of the first carriage via the first SIL4-proved tracking unit which is installed on-board of the first carriage and acquiring a second position data of the second carriage via the second SIL4-proved tracking unit which is installed on-board of the second carriage, wherein the first and second position data, are related to a rail route coordinate system and are determined via distance measurement along a rail route coordinate system with reference to at least one reference point on a rail route;

c) determining a deviation between a reference value which depends on the length of the train and a position value which is determined by subtraction of the first and second rail route coordinate system related position data;

d) detecting whether train integrity is given by analyzing the deviation; and

e) repeating steps b) through d);

wherein tracking units are part of on-board units of an automatic train protection system.

2. The method according to claim 1 , wherein the tracking units are additionally used otherwise than for supervising train integrity.

3. The method according to claim 1 , wherein balises are used as reference points.

4. The method according to claim 1 , wherein first and second position data are transmitted to a control center of the automatic train protection system, in particular to a radio block center of an ETCS-system, wherein the analyzing of the deviation is carried out by means of a central processing unit of the control center.

5. The method according to claim 1 , wherein the position data of the first carriage is transmitted to an on-board unit of the second carriage wherein the analyzing of the deviation is carried out by means of the on-board unit of the second carriage and/or that the position data of the second carriage is transmitted to the first carriage, wherein the analyzing of the deviation is carried out by means of the on-board unit of the first carriage.

6. The method according to claim 1 , wherein the first carriage is the front carriage, in particular a locomotive, and the second carriage is the rear carriage, in particular a second locomotive, of the train.

7. The method according to claim 1 , wherein an alert is initiated in case analyzing of the deviation result is a loss of train integrity.

8. The method according to claim 1 , wherein movement authority is denied in case analyzing of the deviation result is a loss of train integrity.

9. The method according to claim 1 , wherein the reference value the position value previously determined by having carried out steps b)-d).

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 15, 2019
From: BAUER, HARALD; LAUTERBERG, VEIT; WALLNER, CHRISTIAN; MINDEL, KLAUS
To: THALES MANAGEMENT & SERVICES DEUTSCHLAND GMBH
Reel/Frame 048007/0216 →
Priority Claims (1)
EP 16163692 · Apr 4, 2016 · regional
Continuity (2)
Continuation PCTEP2017057918 · Apr 4, 2017
Related Publication 20190031220A1 · Jan 31, 2019