IP Library › Granted Patent US 10,981,331
Granted Patent B2
US 10,981,331 · App. 16/075,430 · Granted Apr 20, 2021

Additive manufacturing

Inventors: Arthur H. Barnes (Vancouver, WA); Wesley R. Schalk (Vancouver, WA); Matthew A. Shepherd (Vancouver, WA)
Assignee: Hewlett-Packard Development Company, L.P.
B29C64/236B29C64/165B29C64/205B29C64/209B29C64/227B29C64/264B29C64/386B33Y10/00B33Y30/00B33Y50/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,981,331
App. No.
16/075,430
Granted
Apr 20, 2021
Kind
B2
Abstract

In one example, a fusing system for an additive manufacturing machine includes a first carriage carrying a layering device and a fusing lamp, and a second carriage carrying a fusing agent dispenser. The first carriage and the second carriage are movable back and forth over the work area along the same line of motion so that the first carriage follows the second carriage in one direction and the second carriage follows the first carriage in the other direction.

Claims (12)

1. A fusing system for an additive manufacturing machine, comprising:

a first carriage carrying a layering device, a heating lamp, and a fusing lamp, the first carriage movable back and forth over a work area along a line of motion in a first direction and in a second direction opposite the first direction;

a second carriage carrying an agent dispenser, the second carriage movable back and forth over the work area along the line of motion in the first direction and in the second direction;

a controller operatively connected to the first carriage, the heating lamp, the fusing lamp, the second carriage, and the agent dispenser, the controller including processor executable instructions to:

while moving the first carriage over the work area in the first direction in a first pass, layer build material over an object structure to form a layer of build material;

while moving the first carriage and the second carriage over the work area in the second direction in a second pass, irradiate build material in the layer with the heating lamp and then dispense a first fusing agent and/or a first detailing agent on to build material in the layer with the agent dispenser;

while moving the second carriage and the first carriage over the work area in the first direction in a third pass, dispense a second fusing agent the same as or different from the first fusing agent and/or a second detailing agent the same as or different from the first detailing agent on to build material in the layer with the agent dispenser and then irradiate build material in the layer with the fusing lamp; and

while moving the first carriage back over the work area in the second direction in a fourth pass, irradiate build material in the layer with the fusing lamp.

2. The system of claim 1 , where the controller includes processor executable instructions to repeat the sequence of layering, irradiating and dispensing, dispensing and irradiating, and irradiating, for multiple successive layers of build material.

3. The system of claim 1 , where the controller includes processor executable instructions to, while moving the first carriage over the work area in the first direction in the first pass, irradiate the object structure with the heating lamp before build material is layered over the object structure.

4. The system of claim 1 , where the controller includes processor executable instructions to, while moving the first carriage over the work area in the first direction in the first pass, irradiate the object structure with the fusing lamp before build material is layered over the object structure.

5. The system of claim 1 , where the controller includes processor executable instructions to, while moving the first carriage over the work area in the first direction in the third pass, irradiate build material in the layer with the heating lamp.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2025
From: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
To: PERIDOT PRINT LLC
Reel/Frame 070187/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 23, 2018
From: BARNES, ARTHUR H; SCHALK, WESLEY R; SHEPHERD, MATTHEW A
To: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Reel/Frame 047280/0951 →
Continuity (1)
Related Publication 20190039303A1 · Feb 7, 2019