Monitoring control system

Inventors: Hiroaki Fujiura (Minato-ku, JP); Masami Onishi (Minato-ku, JP); Hirofumi Fujii (Minato-ku, JP); Hiroaki Sato (Minato-ku, JP); Koichi Takeuchi (Chiyoda-ku, JP); Junya Yamamoto (Chiyoda-ku, JP); Takashi Eguchi (Chiyoda-ku, JP); Tomohiro Kubo (Chiyoda-ku, JP); Masanori Endo (Chiyoda-ku, JP); Kenji Kitami (Chiyoda-ku, JP); Takaaki Hosaka (Chiyoda-ku, JP); Jun Inoue (Chiyoda-ku, JP)
Assignees: Toshiba Energy Systems & Solutions Corporation; Tokyo Electric Power Company Holdings, Incorporated
H02J13/00002H02J13/00006H02J13/00034
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,992,174
App. No.
16/608,600
Granted
Apr 27, 2021
Kind
B2
Abstract

A monitoring control system including: at least one transmission monitoring control subsystem that performs monitoring control of a power transmission system; at least one distribution monitoring control subsystem that performs monitoring control of a power distribution system; a calculation server that stores outage plan names related to outages of the power transmission system and outages of the power distribution system; and a network that connects the transmission monitoring control subsystem, the distribution monitoring control subsystem, and the calculation server. The monitoring control system performs monitoring control of the power transmission system and the power distribution system based on the outage plan name.

Claims (26)

1. A monitoring control system that performs monitoring control of power transmission systems and power distribution systems in a plurality of areas, the monitoring control system comprising:

a transmission monitoring control server that is provided in each of the areas, the system monitoring control server including a plurality of transmission monitoring control subsystems that each perform monitoring control of the power transmission system in the area;

a distribution monitoring control server that is provided in each of the areas, the distribution monitoring control server including a plurality of distribution monitoring control subsystems that each perform monitoring control of the power distribution system in the area;

a calculation server that acquires, from an external system, information on outage plan of the power distribution system and information on outage plan of the power transmission system at a predetermined cycle, and stores to manage outage plan names related to outages of the power transmission system and outages of the power distribution system generated from the acquired information by predetermined processing in a centralized manner; and

a network that connects the transmission monitoring server, the distribution monitoring server, the calculation server, and a terminal that controls transmission facilities and distribution facilities in the areas, wherein

the transmission monitoring control server, the distribution monitoring control server, and the calculation server are consolidated and provided as a server base, and

the transmission monitoring control subsystems and the distribution monitoring control subsystems each perform monitoring control of the power transmission system and the power distribution system in the areas on the basis of the outage plan name that is managed by the calculation server in a centralized manner.

2. The monitoring control system according to claim 1 , wherein

the transmission monitoring control subsystems and the distribution monitoring control subsystems each include an outage plan name registration unit that transmits the outage plan name to the calculation server, and

the outage plan name registration unit converts the outage plan name into a common data format usable in each of the transmission monitoring control subsystems and the distribution monitoring control subsystems.

3. The monitoring control system according to claim 1 , wherein

the transmission monitoring control subsystems and the distribution monitoring control subsystems each include an operation unit that creates an operation procedure on the basis of the outage plan name, and

the operation unit of either one of the transmission monitoring control subsystems and the distribution monitoring control subsystems creates the operation procedure on the basis of a system state that the other subsystems execute the operation procedure.

4. The monitoring control system according to claim 3 , wherein

the operation unit includes an operation name management unit that receives a switchability determination request on whether or not an outage plan is executable, and

the operation name management unit creates a scheduled system on the basis of the outage plan name and transmits a switchability determination response on the basis of the scheduled system.

5. The monitoring control system according to claim 3 , wherein the operation unit includes a simulation execution unit that checks the created operation procedure by using a simulated system.

6. The monitoring control system according to claim 3 , wherein the operation unit includes an actual execution unit that performs an actual execution according to the operation procedure.

7. The monitoring control system according to claim 6 , wherein the actual execution unit stops the actual execution according to a predetermined standard.

8. The monitoring control system according to claim 3 , wherein the operation unit executes a simulation execution of the operation procedure with the simulation execution unit before performing the actual execution.

9. The monitoring control system according to claim 3 , wherein the operation unit creates, on the basis of the outage plan names, the operation procedure in which the operation procedures corresponding to the outage plan names are consolidated into a series of operations.

10. The monitoring control system according to claim 1 , wherein

the server base includes a plurality of server bases, and

the server bases are synchronized with each other.

11. The monitoring control system according to claim 1 , wherein the network is multiplexed.

12. The monitoring control system according to claim 2 , wherein the transmission monitoring control server, the distribution monitoring control server, and the calculation server are each multiplexed at the one server base.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 25, 2019
From: FUJIURA, HIROAKI; ONISHI, MASAMI; FUJII, HIROFUMI; SATO, HIROAKI; TAKEUCHI, KOICHI; YAMAMOTO, JUNYA; EGUCHI, TAKASHI; KUBO, TOMOHIRO; ENDO, MASANORI; KITAMI, KENJI; HOSAKA, TAKAAKI; INOUE, JUN
To: TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION; TOKYO ELECTRIC POWER COMPANY HOLDINGS, INCORPORATED
Reel/Frame 050830/0346 →
Priority Claims (1)
JP JP2017-087104 · Apr 26, 2017 · national
Continuity (1)
Related Publication 20210075253A1 · Mar 11, 2021