IP Library › Granted Patent US 10,994,319
Granted Patent B2
US 10,994,319 · App. 16/313,240 · Granted May 4, 2021

Bimetallic tube and method for manufacturing a bimetallic tube

Inventors: James Shipley (Sandviken, SE); Daniel Gullberg (Gävle, SE); Robert Mattsson (Gävle, SE)
Assignee: Sandvik Intellectual Property AB
B21C37/154B21C1/00B32B15/013C22C16/00C22C38/001C22C38/02C22C38/04C22C38/08C22C38/12C22C38/40C22C38/44C22C38/58
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,994,319
App. No.
16/313,240
Granted
May 4, 2021
Kind
B2
Abstract

The present disclosure relates to a bimetallic tube comprising a first metallic tube having an inner diameter and an outer diameter, and a second metallic tube having an inner diameter and an outer diameter, wherein the first metallic tube is arranged within and force-fitted to the second metallic tube and wherein the first metallic tube comprises a zirconium (Zr) based alloy and wherein the second metallic tube comprises an austenitic stainless steel. The present disclosure also relates to a method for manufacturing a bimetallic tube comprising the steps of providing a first metallic tube having an inner diameter and an outer diameter, providing a second metallic tube having an inner diameter and an outer diameter, wherein the outer diameter of the first metallic tube is smaller than the inner diameter of the second tube, insetting the first metallic tube into the second metallic tube, cold-drawing the first and second metallic tubes together, such that the first and second metallic tubes are force-fitted together.

Claims (66)

1. A bimetallic tube comprising a first metallic tube having an inner diameter (ID 1st ) and an outer diameter (OD 1st ), and a second metallic tube having an inner diameter (ID 2nd ) and an outer diameter (OD 2nd ),

wherein the first metallic tube is arranged within and force-fitted to the second metallic tube, wherein the first metallic tube comprises, in weight %,

Fe+Cr≤1.0;

C≤0.1;

O≤0.2;

Hf≤5.0;

balance Zr and normally occurring impurities,

wherein the second metallic tube is an austenitic stainless steel comprising, in weight,

C≤0.04;

Mn≤3.0;

P≤0.05;

S≤0.04;

Si≤1.0;

Cr 15.0-30.0;

Ni 7.0-25.0;

Mo≤1.0;

N≤0.10;

balance Fe and normally occurring impurities,

and wherein the force-fitting of the first metallic tube to the second metallic tube is at least 20 μm determined by the following procedure:

measuring the inner diameter (ID BM ) of the bimetallic tube;

removing the second metallic tube from the first metallic tube;

measuring the inner diameter (ID 1st ) of the first metallic tube after the second metallic tube has been removed; and

calculating the absolute value of the difference (ID BM −ID 1st ) between the inner diameter (ID BM ) of the bimetallic tube and the inner diameter (ID 1st ) of the first metallic tube after the second metallic tube has been removed.

2. The bimetallic tube according to claim 1 , wherein the content of Cr present in the second metallic tube is in a range of from 17 to 21 weight %.

3. The bimetallic tube according to claim 1 , wherein the content of Cr present in the second metallic tube is in a range of from 23 to 27 weight %.

4. A method for manufacturing a bimetallic tube comprising the steps of:

providing a first metallic tube having an inner diameter (ID 1st ) and an outer diameter (OD 1st ), and providing a second metallic tube having an inner diameter (ID 2nd ) and an outer diameter (OD 2nd ), wherein the outer diameter (OD 1st ) of the first metallic tube is smaller than the inner diameter (ID 2nd ) of the second tube;

inserting the first metallic tube into the second metallic tube; and

cold-drawing the first and second metallic tubes together, such that the first and second metallic tubes are force-fitted together,

wherein in the step of providing the first metallic tube, the first metallic tube comprises, in weight %;

Fe+Cr≤1.0;

C≤0.1;

O≤0.2;

Hf≤5.0;

balance Zr and normally occurring impurities,

wherein in the step of providing the second metallic tube, the second metallic tube is an austenitic stainless steel comprising, in weight %;

C≤0.04;

Mn≤3.0;

P≤0.05;

S≤0.04;

Si≤1.0;

Cr 15.0-30.0;

Ni 7.0-25.0;

Mo≤1.0;

N≤0.10;

balance Fe and normally occurring impurities,

and wherein after the step of cold-drawing the first metallic tube is force-fitted to the second metallic tube so that the spring back is least 20 μm determined by the following procedure:

measuring the inner diameter (ID BM ) of the bimetallic tube;

removing the second metallic tube from the first metallic tube;

measuring the inner diameter (ID 1st ) of the first metallic tube after the second metallic tube has been removed; and

calculating the absolute value of the difference (ID BM −ID 1st ) between the inner diameter (ID BM ) of the bimetallic tube and the inner diameter (ID 1st ) of the first metallic tube after the second metallic tube has been removed.

5. The bimetallic tube according to claim 4 , wherein the content of Cr present in the second metallic tube is in a range of from 17 to 21 weight %.

6. The bimetallic tube according to claim 4 , wherein the content of Cr present in the second metallic tube is in a range of from 23 to 27 weight %.

7. The method according to claim 4 , wherein in the step of cold-drawing, the outer diameter (OD 2nd ) of the second tube is reduced 10% or less compared to outer diameter (OD 2nd ) of the second metallic tube before cold-drawing.

8. The method according to claim 4 , wherein in the step of cold-drawing, the outer diameter (OD 2nd ) of the second tube is reduced 4% or less compared to outer diameter (OD 2nd ) of the second metallic tube before cold-drawing.

9. The method according to claim 4 , wherein after the step of cold-drawing the second metallic tube has an elongation of at least or equal to 35% and a hardness not more than or equal to 90 HRB.

10. The method according to claim 4 , wherein in the step of providing the first metallic tube and/or the second metallic tube is heat-treated before the step of inserting the first metallic tube into the second metallic tube.

11. The method according to claim 4 , wherein in the steps of providing first and second metallic tubes, the first metallic tube and/or the second metallic tube are cold worked tubes.

12. The method according to claim 4 , wherein in the step of providing the first metallic tube, the first metallic tube is a seamless tube.

13. The method according to claim 4 , wherein in the step of providing the first metallic tube, the average wall thickness of the first metallic tube is 0.3 mm to 2 mm.

14. The method according to claim 4 , wherein in the step of providing the second metallic tube, the second metallic tube is a seamless tube.

15. The method according to claim 4 , wherein in the step of providing the second metallic tube, the average wall thickness of the second metallic tube is 0.5 mm to 4 mm.

16. The bimetallic tube according to claim 2 , wherein the content of Cr present in the second metallic tube is in a range of from 18 to 20 weight %.

17. The bimetallic tube according to claim 3 , wherein the content of Cr present in the second metallic tube is in a range of from 24 to 26 weight %.

18. The bimetallic tube according to claim 5 , wherein the content of Cr present in the second metallic tube is in a range of from 18 to 20 weight %.

19. The bimetallic tube according to claim 6 , wherein the content of Cr present in the second metallic tube is in a range of from 24 to 26 weight %.

Assignments (3)
CHANGE OF NAME Recorded Jun 4, 2024
From: AKTIEBOLAGET SANDVIK MATERIALS TECHNOLOGY
To: ALLEIMA TUBE AB
Reel/Frame 068509/0697 →
NUNC PRO TUNC ASSIGNMENT Recorded Mar 25, 2024
From: SANDVIK INTELLECTUAL PROPERTY AB
To: AB SANDVIK MATERIALS TECHNOLOGY
Reel/Frame 066882/0925 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 7, 2019
From: SHIPLEY, JAMES; GULLBERG, DANIEL; MATTSSON, ROBERT
To: SANDVIK INTELLECTUAL PROPERTY AB
Reel/Frame 048264/0605 →
Priority Claims (1)
EP 16177637 · Jul 1, 2016 · regional
Continuity (1)
Related Publication 20190168274A1 · Jun 6, 2019