IP Library Granted Patent US 11,014,262
Granted Patent B2
US 11,014,262 · App. 16/422,974 · Granted May 25, 2021

Adaptable lumber retrieval method

Inventor: Steven L. Aylsworth (Chatfield, MN)
B27B31/00B23D59/001
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,014,262
App. No.
16/422,974
Granted
May 25, 2021
Kind
B2
Abstract

A lumber retrieval method renders a lumber handling system readily adaptable to compensate for irregular floors, an irregular overhead track, and variable station locations. In some examples, the method involves determining a plurality of floor-to-track error values that vary based on the floor and the track deviating from being parallel to each other, recording the plurality of floor-to-track error values on a controller, and calculating a plurality of error-compensated reading via the controller based on the plurality of lumber scanned reading and the plurality of floor-to-track error values.

Claims (30)

1. A lumber handling method for retrieving a plurality of boards of various sizes from a plurality of stations supported by a floor, the plurality of stations include at least a first station and a second station, the lumber handling method comprising:

carrying a laser unit above and over the plurality of stations via a trolley apparatus of a track/trolley system, wherein the track/trolley system comprises the trolley apparatus and a track along which the trolley apparatus travels;

determining a plurality of floor-to-track error values that vary based on the floor and the track deviating from being parallel to each other;

recording the plurality of floor-to-track error values on a controller;

scanning the plurality of stations with the laser unit as the trolley apparatus carries the laser unit over the plurality of stations during a normal operating period;

recording a plurality of lumber scanned readings via the controller as a result of scanning the plurality of stations during the normal operating period;

calculating a plurality of error-compensated readings via the controller based on the plurality of lumber scanned readings and the plurality of floor-to-track error values;

storing a first stack of lumber at the first station, the first stack of lumber comprising a first plurality of boards each of a first board size;

entering the first board size into the controller;

storing a second stack of lumber at the second station, the second stack of lumber comprising a second plurality of boards each of a second board size that is distinguishable from the first board size;

entering the second board size into the controller;

calculating, via the controller, a first quantity of boards of the first plurality of boards based on the plurality of error-compensated readings and the first board size;

calculating, via the controller, a second quantity of boards of the second plurality of boards based on the plurality of error-compensated readings and the second board size;

carrying, via the track/trolley system, a first board along a trolley travel direction from the first station to a board-receiving area, the first station being between the second station and the board-receiving area, the trolley travel direction being substantially parallel to the track;

carrying, via the track/trolley system, a second board along the trolley travel direction from the second station, over the first station, and to the board-receiving area; and

transferring the first board and the second board from the board-receiving area to a saw.

2. The lumber handling method of claim 1 , further comprising:

scanning the plurality of stations with the laser unit as the trolley apparatus carries the laser unit in the trolley travel direction over the plurality of stations during a calibration period that occurs before the normal operating period; and

recording a plurality of laser calibration readings via the controller as a result of scanning the plurality of stations during the calibration period, the plurality of laser calibration readings varying as a result of the floor and the track deviating from being parallel to each other, wherein the plurality of floor-to-track error values are determined based on the plurality of laser calibration readings.

3. The lumber handling method of claim 1 , further comprising:

selectively positioning the trolley apparatus to a plurality of locations along the trolley travel direction;

upon selectively positioning the trolley apparatus, manually measuring a plurality of vertical distance readings from an upper reference point to a lower target point during a calibration period that occurs before the normal operating period, the upper reference point being substantially fixed vertically and horizontally relative to the laser unit, the lower target point being substantially directly underneath the upper reference point when measuring a distance reading of the plurality of distance readings; and

manually entering the plurality of vertical distance readings into the controller, the plurality of vertical distance readings varying as a result of the floor and the track deviating from being parallel to each other, wherein the plurality of floor-to-track error values are determined based on the plurality of vertical distance readings.

4. The lumber handling method of claim 3 , wherein the lower target point is on the floor.

5. The lumber handling method of claim 3 , wherein the lower target point is at least sometimes on a cart of the plurality of stations.

6. The lumber handling method of claim 5 , wherein the lower target point is at least sometimes on a board on the cart.

7. The lumber handling method of claim 1 , further comprising:

detecting a gap exceeding a predetermined width by scanning the plurality of stations with the laser unit;

recording a location of the gap via the controller; and

defining a relative location of at least one of the first station and the second station based on the location of the gap.

Assignments (3)
SECURITY INTEREST Recorded Feb 28, 2022
From: AYLSWORTH, STEVEN
To: ACER, INC.
Reel/Frame 059112/0543 →
CORRECTIVE ASSIGNMENT TO CORRECT THE TO CORRECT SUPPORTING DOCUMENTS PREVIOUSLY RECORDED ON REEL 053448 FRAME 0101. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Aug 14, 2020
From: AYLSWORTH, STEVEN L
To: ACER INC.
Reel/Frame 054171/0388 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 10, 2020
From: AYLSWORTH, STEVEN L
To: ACER INC.
Reel/Frame 053448/0101 →
Continuity (6)
Division 15331824 · Oct 22, 2016
Continuation In Part 14577779 · Dec 19, 2014
Division 13136922 · Aug 15, 2011
Provisional Application 62324151 · Apr 18, 2016
Provisional Application 61402654 · Sep 2, 2010
Related Publication 20190275694A1 · Sep 12, 2019
Cited By (1)
US 12,630,376