IP Library Granted Patent US 11,035,096
Granted Patent B1
US 11,035,096 · App. 15/936,144 · Granted Jun 15, 2021

Construction equipment and methods

Inventors: Nathan Bunting (Red Bluff, CA); Nate Stephens (Rathdrum, ID)
E02F3/964E02F3/30E02F3/32E02F3/38E02F3/413E02F3/963E02F9/028E02F9/16E02F9/166E04H12/347E21B7/005E21B7/024E21B7/027E02F3/34E21B7/028
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,035,096
App. No.
15/936,144
Granted
Jun 15, 2021
Kind
B1
Abstract

Construction equipment is provided that can include: a transport assembly operably supporting a platform, the platform having a leading edge opposing a rearward edge, the leading edge associated with a first direction of the transport assembly, and the rearward edge associated with a second direction of the transportation assembly; an operator cab above the platform and aligned closer to the leading edge than the rearward edge; an engine above the platform and aligned closer to the rearward edge than the leading edge; and a boom pivotably attached above the platform closer to the rearward edge than the leading edge, the boom being movable between a first position fully extended and a second position fully raised. Utility line pole placement and/or removal construction methods are provided that can include extending an extension assembly having a banana boom from a transport assembly to couple with a utility line pole.

Claims (10)

1. Construction equipment comprising:

a transport assembly operably supporting a platform, the platform having a leading edge opposing a rearward edge, the leading edge associated with a first direction of the transport assembly, and the rearward edge associated with a second direction of the transport assembly;

an operator cab above the platform and aligned closer to the leading edge than the rearward edge;

an engine above the platform and aligned closer to the rearward edge than the leading edge;

a banana boom pivotably attached above the platform closer to the rearward edge than the leading edge, the boom being movable between a first position fully extended to engage with the leading edge of the platform and a second position fully raised;

a fixed length extension member pivotably coupled to the banana boom;

a bucket/claw assembly pivotably coupled to an end of the extension member; and

an earth auger assembly pivotably coupled to the fixed length extension member proximate the bucket/claw assembly, the earth auger being movable between a first position in parallel alignment with the fixed length extension member with an auger end proximate the pivotable coupling to the banana boom, and a second position in substantial normal alignment with the extension member.

2. The construction equipment of claim 1 wherein a curve of the banana boom extends beyond the platform in the first position.

3. The construction equipment of claim 1 wherein the claw assembly is operably engaged with the end of the extension member via a spindle assembly.

Continuity (1)
Provisional Application 62478528 · Mar 29, 2017
Cited By (2)
US 12,203,239 US 12,533,939