IP Library Granted Patent US 11,078,756
Granted Patent B2
US 11,078,756 · App. 16/478,443 · Granted Aug 3, 2021

Method and apparatus for introducing a junction assembly including a transition joint and a load transfer device

Inventors: Stephen Ross Maddux (Carrollton, TX); Shane Patrick Furlong (Frisco, TX); David Joe Steele (Arlington, TX)
Assignee: Halliburton Energy Services, Inc.
E21B41/0035E21B23/01E21B41/0042E21B29/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,078,756
App. No.
16/478,443
Granted
Aug 3, 2021
Kind
B2
Abstract

A junction system to line a lateral wellbore can include a junction assembly and a running tool. The junction assembly can include an anchor, a transition joint, a load transfer device, and a lateral liner. The running tool assembly can be configured to extend within a central bore of the junction assembly. The running tool assembly can include a setting tool to set the anchor and a locking device to permit transfer of axial or rotational force between the lateral liner and a work string.

Claims (40)

1. A method to introduce a junction assembly from a primary wellbore into a lateral wellbore, the method comprising:

introducing a running tool into the junction assembly, wherein the junction assembly includes an anchor, a transition joint coupled to the anchor, a load transfer device coupled to the transition joint, and a lateral liner coupled to the load transfer device;

milling a transition joint window in the transition joint;

releaseably coupling the running tool to the anchor and to the load transfer device;

advancing the running tool and the junction assembly through a casing of the primary wellbore;

introducing the lateral liner through a casing window of the casing; and

applying rotational or axial force to the lateral liner and the load transfer device via the running tool to position the lateral liner within the lateral wellbore.

2. The method of claim 1 , further comprising diverting a load from the lateral liner to the running tool via the load transfer device.

3. The method of claim 1 , further comprising locating the casing window via the running tool.

4. The method of claim 1 , wherein milling the transition joint window comprises milling the transition joint window at a downhole location.

5. The method of claim 1 , further comprising aligning the transition joint window of the transition joint with the casing window.

6. The method of claim 5 , wherein aligning the transition joint window further comprises axially aligning the transition joint with the casing window.

7. The method of claim 5 , wherein aligning the transition joint window further comprises rotationally aligning the transition joint with the casing window.

8. The method of claim 1 , further comprising cementing the lateral liner within the lateral wellbore.

9. The method of claim 1 , further comprising setting the anchor.

10. The method of claim 9 , wherein setting the anchor further comprises expanding the anchor.

11. The method of claim 10 , wherein expanding the anchor comprises hydraulically expanding the anchor.

12. The method of claim 10 , wherein expanding the anchor comprises mechanically expanding the anchor.

13. The method of claim 1 , further comprising:

disengaging the running tool from the junction assembly; and

retrieving the running tool from the primary wellbore.

14. A junction system to line a lateral wellbore extending from a primary wellbore, the junction system comprising:

a junction assembly including an anchor, a transition joint, a load transfer device, and a lateral liner that collectively define a central bore extending therethrough, the transition joint coupled to the anchor, the transition joint including a transition joint window extending through the transition joint into the central bore, the load transfer device coupled to the transition joint, the load transfer device including a load transfer device profile disposed within the central bore, wherein the load transfer device profile includes an axial engagement portion and a rotational engagement portion, the lateral liner positioned below the transition joint; and

a running tool assembly configured to extend within the central bore of the junction assembly, the running tool assembly including:

an upper connection to a work string;

a setting tool coupled to the upper connection; and

a locking device axially spaced apart from the setting tool, the locking device including locking profile complimentary to the load transfer device profile to engage with the axial engagement portion or the rotational engagement portion of the load transfer device profile, wherein axial and rotational engagement between the load transfer device and the locking device permits transfer of axial or rotational force between the lateral liner and the work string.

15. The junction system of claim 14 , further comprising a mandrel coupling the setting tool and the locking device.

16. The junction system of claim 15 , wherein the mandrel extends across the transition joint.

17. The junction system of claim 15 , further comprising an actuating lug assembly disposed between the setting tool and the locking device, the actuating lug assembly including:

a lug having a lug member and a pivot, the lug coupled to a mandrel; and

the lug member and the pivot configured to urge the lug away from the mandrel.

18. The junction system of claim 17 , wherein the actuating lug assembly includes a plurality of actuating lug assemblies.

19. A junction system to line a lateral wellbore extending from a primary wellbore, the junction system comprising:

a junction assembly including an anchor, a transition joint, a load transfer device, and a lateral liner that collectively define a central bore extending therethrough, the anchor including an anchor profile disposed within the central bore, the transition joint coupled to the anchor, the load transfer device coupled to the transition joint, the load transfer device including an inner engagement surface, the lateral liner coupled to the load transfer device; and

a running tool assembly configured to extend within the central bore of the junction assembly, the running tool assembly including:

an upper connection to a work string;

a setting tool coupled to the upper connection, the setting tool including a setting tool collet, and a mandrel extending within the setting tool collet, wherein the setting tool collet includes a setting profile complimentary to the anchor profile and is configured to receive the anchor profile; and

a locking device axially spaced apart from the setting tool, the locking device including a locking profile configured to engage the inner engagement surface, wherein axial and rotational engagement between the load transfer device and the locking device permits transfer of axial or rotational force between the lateral liner and the work string.

20. The junction system of claim 19 , wherein the mandrel extends across the transition joint.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 18, 2019
From: MADDUX, STEPHEN ROSS; FURLONG, SHANE PATRICK; STEELE, DAVID JOE
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 049793/0774 →
Continuity (1)
Related Publication 20200378203A1 · Dec 3, 2020
Cited By (2)
US 12,553,289 US 12,631,081