IP Library › Granted Patent US 11,085,172
Granted Patent B2
US 11,085,172 · App. 16/644,409 · Granted Aug 10, 2021

Construction machine

Inventors: Haruki Sugiyama (Kasumigaura, JP); Ken Takeuchi (Kasumigaura, JP); Akira Watanabe (Ushiku, JP)
Assignee: Hitachi Construction Machinery Co., Ltd.
E02F9/2091B60L50/66B60L58/22H02J7/0014H02J7/0047B60L2240/547H02P27/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,085,172
App. No.
16/644,409
Granted
Aug 10, 2021
Kind
B2
Abstract

A storage battery ( 21 ) is configured of a plurality of cells ( 22 A) to ( 22 N) series-connected to each other. A battery controller ( 27 ) receives power supplied from a lead battery ( 31 ). The battery controller ( 27 ) executes balancing control that reduces variation in cell voltages (VcA) to (VcN) of the plurality of cells ( 22 A) to ( 22 N). The battery controller ( 27 ) executes the balancing control in a time range during which a voltage of the lead battery ( 31 ) becomes equal to or more than a predetermined given voltage value (V 1 ) and a charging rate of the storage battery ( 21 ) becomes equal to or more than a predetermined given charging rate value (SOC 1 ) after a key switch ( 16 ) is switched from an on state to an off state.

Claims (20)

1. A construction machine comprising:

a hydraulic pump driven by an electric motor;

a working mechanism driven by hydraulic oil delivered from

the hydraulic pump;

a first battery that is configured of a plurality of cells series-connected to each other and supplies power to the electric motor;

a cell voltage detector that detects a cell voltage of each of the plurality of cells;

a battery controller to which power is supplied from a second battery and that executes balancing control for reducing variation in the cell voltage of the plurality of cells; and

a key switch having a drive position for driving the electric motor and a stop position for stopping the electric motor, wherein the battery controller:

calculates a first time as a remaining time required until the balancing control is completed when the key switch is switched from the drive position to the stop position,

calculates a second time as a time during which the balancing control is possible based upon the voltage state of the second battery,

calculates a third time as a time during which the balancing control is possible based upon the charging rate of the first battery,

executes the balancing control by a minimum time out of the first time, the second time, and the third time, and

executes the balancing control in a time range during which a voltage of the second battery becomes equal to or more than a predetermined given voltage value and a charging rate of the first battery becomes equal to or more than a predetermined given charging rate value after the key switch is switched from the drive position to the stop position.

2. The construction machine according to claim 1 , wherein the battery controller:

subtracts an elapse time after the key switch is switched from the drive position to the stop position from the minimum time, and

causes a monitor to display a remaining time of the balancing control.

3. The construction machine according to claim 1 , wherein:

the second battery is connected via a first relay and a second relay parallelly connected to each other to the battery controller,

the first relay is turned to a connection state when the key switch is switched to the drive position, and is turned to a disconnection state when the key switch is switched to the stop position, and

the second relay is turned to a connection state when the battery controller executes the balancing control, and is turned to a disconnection state when the minimum time elapses from a point where the balancing control starts.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 5, 2020
From: SUGIYAMA, HARUKI; TAKEUCHI, KEN; WATANABE, AKIRA
To: HITACHI CONSTRUCTION MACHINERY CO., LTD.
Reel/Frame 052021/0926 →
Priority Claims (1)
JP JP2018-046593 · Mar 14, 2018 · national
Continuity (1)
Related Publication 20200199848A1 · Jun 25, 2020
Cited By (1)
US 12,738,756