IP Library Granted Patent US 11,117,320
Granted Patent B2
US 11,117,320 · App. 15/703,600 · Granted Sep 14, 2021

Airflow control for additive manufacturing

Inventors: Andrew Martin (Blue Ash, OH); Justin Mamrak (Bamberg, DE)
Assignee: General Electric Company
B29C64/241B22F12/00B29C64/153B29C64/188B29C64/245B29C64/268B29C64/371B33Y10/00B33Y30/00B33Y50/02G05B19/4099B22F10/10B22F2201/00B22F2999/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,117,320
App. No.
15/703,600
Granted
Sep 14, 2021
Kind
B2
Abstract

A method, apparatus, and program for additive manufacturing. The additive manufacturing device includes a positioning mechanism configured to provide independent movement of at least one build unit in at least two dimensions. The build unit may further include a gasflow device for providing a flow zone along a first direction with relation to the build unit. The build unit may further include a powder delivery mechanism and an irradiation beam directing unit. The irradiation bean unit may follow a first irradiation path, wherein the first irradiation path forms at least a first solidification line and at least a second solidification line formed at an angle other than 0° and 180° with respect to the first solidification line. During the formation of the first solidification line, the build unit may be positioned in a first orientation such that the first direction of the flow zone is substantially perpendicular to the first solidification line. During the formation of the second solidification line, the build unit may be positioned in a second orientation such that the flow zone along the first direction is substantially perpendicular to the second solidification line.

Claims (14)

1. A system for producing an additively manufactured component, the system comprising:

a positioning mechanism configured to provide independent movement of at least one build unit in at least one dimension, the build unit comprising:

a gasflow device for providing a flow zone along a first direction with relation to the build unit, wherein the first direction extends substantially parallel to a build platform or a layer of powder disposed thereon;

a powder delivery mechanism; and

an irradiation beam directing unit, wherein the irradiation beam directing unit follows a first irradiation path, wherein the first irradiation path forms at least a first solidification line and at least a second solidification line formed at an angle other than 0° and 180° with respect to the first solidification line, wherein during the formation of the first solidification line the build unit is positioned in a first orientation such that the first direction of the flow zone is substantially perpendicular to the first solidification line, and during the formation of the second solidification line the build unit is positioned in a second orientation such that the flow zone along the first direction is substantially perpendicular to the second solidification line,

wherein the first direction is different from a propagation direction of an irradiation beam from the irradiation beam directing unit;

wherein the build unit is rotatably mounted to the positioning mechanism about an axis substantially perpendicular to the first direction and is rotated from the first orientation to the second orientation.

2. The system for producing an additively manufactured component of claim 1 , wherein the build platform comprises a rotatable build platform, wherein the build platform is rotated after the formation of the first solidification line.

3. The system for producing an additively manufactured component of claim 1 , wherein the gasflow device produces a laminar flow along the first direction.

4. The system for producing an additively manufactured component of claim 2 , wherein the first solidification line comprises a plurality of parallel solidification lines.

5. The system for producing an additively manufactured component of claim 4 , wherein the second solidification line comprises a plurality of parallel solidification lines.

6. The system for producing an additively manufactured component of claim 1 , wherein the build unit further comprises a powder recoater.

7. The system for producing an additively manufactured component of claim 5 , wherein the series of first solidification lines are formed on a first layer of powder, wherein the second set of solidification lines are formed on a second layer of powder provided over the first layer of powder by the powder delivery mechanism.

8. The system for producing an additively manufactured component of claim 1 , further comprising a mobile build platform configured to move independently of the build unit.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 13, 2017
From: MARTIN, ANDREW; MAMRAK, JUSTIN
To: GENERAL ELECTRIC COMPANY
Reel/Frame 043578/0582 →
Continuity (1)
Related Publication 20190077077A1 · Mar 14, 2019