IP Library › Granted Patent US 11,178,715
Granted Patent B2
US 11,178,715 · App. 16/531,597 · Granted Nov 16, 2021

Radio resource control connection reestablishment

Inventor: Chih-Hsiang Wu (Taoyuan, TW)
Assignee: Google LLC
H04W76/19H04W24/10H04W76/18H04W76/27H04W76/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,178,715
App. No.
16/531,597
Granted
Nov 16, 2021
Kind
B2
Abstract

This document describes methods, devices, systems, and means for radio resource control connection reestablishment, in which a user equipment ( 110 ) receives a first measurement configuration ( 405 ) from a base station ( 121 ), and based on the first measurement configuration, the user equipment ( 110 ) performs a first measurement process ( 415 ). The user equipment ( 110 ) detects a first failure ( 420 ) with the base station ( 121 ) and in response to detecting the first failure with the base station ( 121 ), the user equipment ( 110 ) maintains the first measurement configuration and suspends performance of the first measurement process.

Claims (96)

1. A method of reestablishing a radio resource control (RRC) connection, the method comprising a user equipment:

receiving a first measurement configuration from a base station;

based on the first measurement configuration, performing a first measurement process;

detecting a first communication failure with the base station;

in response to detecting the first communication failure with the base station:

releasing a measurement gap configuration; and

maintaining the first measurement configuration.

2. The method of claim 1 , further comprising the user equipment:

in response to detecting the first communication failure with the base station, transmitting an RRC Reestablishment Request message to the base station; and

in response to the transmitting the RRC Reestablishment Request message, receiving an RRC Reestablishment message from the base station.

3. The method of claim 1 , further comprising the user equipment:

before the detecting the first communication failure with the base station, transmitting a first measurement report.

4. The method of claim 3 , wherein the first measurement report includes one or more of:

a first measurement result measured on a measurement object; or

a first measurement identity that identifies the first measurement configuration.

5. The method of claim 1 , further comprising the user equipment:

in response to detecting the first communication failure with the base station, transmitting an RRC Reestablishment Request message to the base station;

in response to the transmitting the RRC Reestablishment Request message, receiving an RRC Reestablishment message from the base station; and

in response to the receiving the RRC Reestablishment message, resuming the performing the first measurement process.

6. The method of claim 5 , further comprising the user equipment:

in response to the receiving the RRC Reestablishment message, transmitting an RRC Reestablishment complete message before the resuming the first measurement process.

7. The method of claim 5 , further comprising the user equipment:

in response to the receiving the RRC Reestablishment message, transmitting an RRC Reestablishment complete message after the resuming the first measurement process.

8. The method of claim 5 , further comprising the user equipment:

transmitting a second measurement report.

9. The method of claim 1 , further comprising the user equipment:

receiving a second measurement configuration from the base station;

determining if the second measurement configuration includes an indication to release the first measurement configuration; and

based on determining that the second measurement configuration includes the indication to release the first measurement configuration, releasing the first measurement configuration; or

based on determining that the second measurement configuration does not include the indication to release the first measurement configuration:

maintaining the first measurement configuration; and

resuming the performing the first measurement process.

10. The method of claim 1 , wherein the first measurement configuration includes one or more of:

a first measurement object to be measured;

a first measurement identity identifying the first measurement configuration;

a measurement reporting configuration; or

an absolute radio frequency channel number (ARFCN) and a reference signal to be measured.

11. The method of claim 1 , further comprising the user equipment:

suspending the performing the first measurement process.

12. A user equipment comprising:

a wireless transceiver; and

a processor and memory system to implement a measurement manager application configured to:

receive a first measurement configuration from a base station;

based on the first measurement configuration, perform a first measurement process;

detect a first communication failure with the base station;

in response to detecting the first communication failure with the base station:

release a measurement gap configuration; and

maintain the first measurement configuration.

13. The user equipment of claim 12 , wherein the measurement manager application is configured to:

in response to the detection of the first communication failure with the base station, transmit an RRC Reestablishment Request message to the base station; and

in response to the transmission of the RRC Reestablishment Request message, receive an RRC Reestablishment message from the base station.

14. The user equipment of claim 12 , wherein the measurement manager application is configured to:

before the detection of the first communication failure with the base station, transmit a first measurement report;

in response to the detection of the first communication failure with the base station, transmit an RRC Reestablishment Request message to the base station;

in response to the transmission of the RRC Reestablishment Request message, receive an RRC Reestablishment message from the base station; and

in response to the reception of the RRC Reestablishment message, resume the performance of the first measurement process.

15. The user equipment of claim 14 , wherein first measurement report includes one or more of:

a first measurement result measured on a first measurement object; or

a first measurement identity that identifies the first measurement configuration.

16. The user equipment of claim 12 , wherein the measurement manager application is configured to:

in response to the detection of the first communication failure with the base station:

continue the performance of the first measurement process.

17. The user equipment of claim 12 , wherein the first measurement configuration includes one or more of:

a first measurement object to be measured;

a first measurement identity identifying the first measurement configuration;

a measurement reporting configuration; or

an absolute radio frequency channel number (ARFCN) and a reference signal to be measured.

18. The user equipment of claim 12 , wherein the measurement manager application is configured to:

suspend the performance of the first measurement process.

19. A method of reestablishing a radio resource control (RRC) connection, the method comprising a user equipment:

receiving a first measurement configuration from a base station;

receiving a second measurement configuration from the base station;

based on the first measurement configuration, performing a first measurement process;

transmitting a first measurement report;

detecting a first communication failure with the base station;

in response to detecting the first communication failure with the base station:

releasing the second measurement configuration;

suspending communication with the base station over a first signaling radio bearer (SRB); and

maintaining the first measurement configuration.

20. The method of claim 19 , further comprising the user equipment:

in response to detecting the first communication failure with the base station, transmitting an RRC Reestablishment Request message to the base station;

in response to the transmitting the RRC Reestablishment Request message, receiving data over the first SRB from the base station;

receiving an RRC Reestablishment message from the base station;

in response to the receiving the RRC Reestablishment message, determining to resume the transmission of additional measurement reports; and

transmitting a second measurement report.

21. The method of claim 19 , wherein the first measurement configuration includes one or more of:

a first measurement object to be measured;

a first measurement identity identifying the first measurement configuration;

a measurement reporting configuration; or

an absolute radio frequency channel number (ARFCN) and a reference signal to be measured.

22. The method of claim 19 , wherein the first measurement report includes one or more of:

a first measurement result measured on a measurement object; or

a first measurement identity that identifies the first measurement configuration.

23. The method of claim 19 , further comprising the user equipment:

in response to detecting the first communication failure with the base station:

suspending transmission of additional measurement reports.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 5, 2019
From: WU, CHIH-HSIANG
To: GOOGLE LLC
Reel/Frame 049958/0980 →
Continuity (2)
Provisional Application 62715767 · Aug 7, 2018
Related Publication 20200053812A1 · Feb 13, 2020