IP Library Granted Patent US 11,186,992
Granted Patent B2
US 11,186,992 · App. 16/886,741 · Granted Nov 30, 2021

Reinforcing structure of concrete overhead layer

Inventors: Baoru Jie (Nanchang, CN); Jiangang Jie (Nanchang, CN); Shuangxi Zhou (Nanchang, CN); Zhiyong Yao (Nanchang, CN); Wenrong Hu (Nanchang, CN); Yuchun Chen (Nanchang, CN); Wujin Tao (Nanchang, CN); Wen Liu (Nanchang, CN); Luolong Zhan (Nanchang, CN); Xin He (Nanchang, CN)
Assignee: FENG HE YING ZAO GROUP CO., LTD.
E04C5/163E04B5/046E04B5/10E04C5/0627E04B2103/02E04B2103/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,186,992
App. No.
16/886,741
Granted
Nov 30, 2021
Kind
B2
Abstract

The present disclosure relates to a field of construction engineering, and in particular to a reinforcing structure of a concrete overhead layer before a building expires. The reinforcing structure of the concrete overhead layer includes supporting structures, connecting structures, and metal members; wherein the reinforcing structure is configured to reinforce a concrete floor slab and/or a concrete beam; through holes are disposed on the concrete floor slab; each of the supporting structures passes through each of the through holes and the supporting structures are configured to support the concrete floor slab and/or the concrete beam; and each of the connecting structures is configured to fix each of the supporting structures on each of the metal members; each of the metal members is disposed on each of the through holes.

Claims (11)

1. A reinforcing structure of a concrete overhead layer, comprising supporting structures, connecting structures, and metal members; wherein the reinforcing structure is configured to reinforce a concrete floor slab and/or a concrete beam; through holes are disposed on the concrete floor slab; each of the supporting structures passes through each of the through holes and the supporting structures are configured to support the concrete floor slab and/or the concrete beam; and each of the connecting structures is configured to fix each of the supporting structures on each of the metal members; each of the metal members is disposed on each of the through holes;

wherein the supporting structures are metal supporting plates, the metal supporting plates are metal flat plates; each of the connecting structures comprises a metal base and metal clamps; each metal base is fixed on each of the metal supporting plates; each metal base comprises a first through hole; and an axial direction of the first through hole is same as a horizontal direction of the corresponding metal supporting plate; a second through hole is disposed on one end of each of the metal clamps; and outer threads are disposed on another end of each of the metal clamps; the first through hole is connected with the second through holes via a first bolt; the another end of each of the metal clamps is connected with each of the metal members via the outer threads to reinforce the concrete floor slab.

2. The reinforcing structure of the concrete overhead layer according to claim 1 , wherein a steel pipe pad is sleeved into the first through hole to facilitate a rotation of the metal clamps relative to each metal base.

3. The reinforcing structure of the concrete overhead layer according to claim 1 , wherein the through holes are cross double-type holes, a center of each of the through holes is circular, length and width of each of the metal supporting plates is greater than a circular diameter of the center of each of the through holes and no more than an outer diameter of each of the through holes.

4. The reinforcing structure of the concrete overhead layer according to claim 1 , wherein the metal members are evenly disposed in horizontal and vertical directions of the concrete floor slab.

5. The reinforcing structure of the concrete overhead layer according to claim 1 , wherein the metal members are steel I-beams.

6. The reinforcing structure of the concrete overhead layer according to claim 1 , wherein gaps of the through holes are filled with high-strength fine stone concrete.

7. The reinforcing structure of the concrete overhead layer according to claim 1 , wherein the supporting structures, the connecting structures, and the metal members are made of corrosion-resistant metal material.

8. A reinforcing structure of a concrete overhead layer, comprising supporting structures, connecting structures, and metal members; wherein the reinforcing structure is configured to reinforce a concrete floor slab and/or a concrete beam; through holes are disposed on the concrete floor slab; each of the supporting structures passes through each of the through holes and the supporting structures are configured to support the concrete floor slab and/or the concrete beam; and each of the connecting structures is configured to fix each of the supporting structures on each of the metal members; each of the metal members is disposed on each of the through holes;

wherein each of the supporting structures is a pair of L-shaped metal hooks; each pair of the L shaped metal hooks is oppositely disposed; each horizontal end of the L-shaped metal hooks is disposed on a bottom portion of the concrete beam; and a length of each horizontal end of the L-shaped metal hooks is not less than half of a width of the concrete beam; vertical ends of each pair of the L-shaped metal hooks pass through each of the through holes; a hole is disposed on an upper portion of each of the L-shaped metal hooks; the connecting structures are second bolts, and each hole of each of the L-shaped metal hooks is fixedly connected with each of the metal members via the second bolts to make each pair of the L-shaped metal hooks connect with each of the metal members to reinforce the concrete beam.

9. The reinforcing structure of the concrete overhead layer according to claim 8 , wherein a steel washer is sleeved on each of the second bolts and each steel washer is disposed between each of the second bolts and each of the L-shaped metal hooks.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 28, 2020
From: JIE, BAORU; JIE, JIANGANG; ZHOU, SHUANGXI; YAO, ZHIYONG; HU, WENRONG; CHEN, YUCHUN; TAO, WUJIN; LIU, WEN; ZHAN, LUOLONG; HE, XIN
To: FENG HE YING ZAO GROUP CO., LTD.
Reel/Frame 052781/0905 →
Priority Claims (1)
CN 201921638697.X · Sep 29, 2019 · national
Continuity (1)
Related Publication 20210095471A1 · Apr 1, 2021
Cited By (1)
US 12,221,761