IP Library › Granted Patent US 11,199,205
Granted Patent B2
US 11,199,205 · App. 16/961,006 · Granted Dec 14, 2021

Construction machine

Inventors: Hidekazu Moriki (Mito, JP); Takaaki Chiba (Kasumigaura, JP); Shinya Imura (Toride, JP)
Assignee: HITACHI CONSTRUCTION MACHINERY CO., LTD.
F15B19/002E02F9/2228E02F9/2267E02F9/2275F15B19/007F15B2211/30575F15B2211/45F15B2211/455F15B2211/46F15B2211/6309F15B2211/6313F15B2211/6355F15B2211/7053F15B2211/855
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,199,205
App. No.
16/961,006
Granted
Dec 14, 2021
Kind
B2
Abstract

An object of the present invention is to provide a construction machine that allows easy and accurate calibration of a pressure sensor and enables accurate control of hydraulic actuators. A controller increases the delivery pressure of a hydraulic pump in a state in which first and second meter-out valves and a second meter-in valve are closed and in which a first meter-in valve is opened, and calibrates a first pressure-calculation map such that a pressure calculated on the basis of the first pressure-calculation map matches a pressure calculated on the basis of a supply-pressure-calculation map, and increases the delivery pressure of the hydraulic pump in a state in which the first and second meter-out valves and the first meter-in valve are closed and in which the second meter-in valve is opened, and calibrates a second pressure-calculation map such that a pressure calculated on the basis of the second pressure-calculation map matches the pressure calculated on the basis of the supply-pressure-calculation map.

Claims (37)

1. A construction machine comprising:

a hydraulic pump;

a supply hydraulic line connected to the hydraulic pump;

a tank;

a discharge hydraulic line connected to the tank;

a hydraulic actuator having a first oil chamber and a second oil chamber;

a first-actuator hydraulic line connected to the first oil chamber;

a second-actuator hydraulic line connected to the second oil chamber;

a first meter-in valve provided on a first connection hydraulic line connecting the supply hydraulic line and the first-actuator hydraulic line;

a second meter-in valve provided on a second connection hydraulic line connecting the supply hydraulic line and the second-actuator hydraulic line;

a first meter-out valve provided on a third connection hydraulic line connecting the first-actuator hydraulic line and the discharge hydraulic line;

a second meter-out valve provided on a fourth connection hydraulic line connecting the second-actuator hydraulic line and the discharge hydraulic line;

a bleed-off valve provided on a fifth connection hydraulic line connecting the supply hydraulic line and the discharge hydraulic line;

a supply-pressure sensor that senses a delivery pressure of the hydraulic pump;

a first-load-pressure sensor that senses a pressure of the first oil chamber;

a second-load-pressure sensor that senses a pressure of the second oil chamber; and

a controller that controls the first and second meter-in valves, the first and second meter-out valves, and the bleed-off valve in accordance with sensing signals of the first and second-load-pressure sensors, and a sensing signal of the supply-pressure sensor, wherein

the controller is configured to:

calculate the delivery pressure of the hydraulic pump from the sensing signal of the supply-pressure sensor on a basis of a supply-pressure-calculation map representing a characteristic of the supply-pressure sensor,

calculate the pressure of the first oil chamber from the sensing signal of the first-load-pressure sensor on a basis of a first pressure-calculation map representing a characteristic of the first-load-pressure sensor,

calculate the pressure of the second oil chamber from the sensing signal of the second-load-pressure sensor on a basis of a second pressure-calculation map representing a characteristic of the second-load-pressure sensor,

increase the delivery pressure of the hydraulic pump in a state in which the first and second meter-out valves and the second meter-in valve are closed and in which the first meter-in valve is opened, and calibrate the first pressure-calculation map such that the pressure of the first oil chamber calculated on the basis of the first pressure-calculation map matches the delivery pressure of the hydraulic pump calculated on the basis of the supply-pressure-calculation map, and

increase the delivery pressure of the hydraulic pump in a state in which the first and second meter-out valves and the first meter-in valve are closed and in which the second meter-in valve is opened, and calibrate the second pressure-calculation map such that the pressure of the second oil chamber calculated on the basis of the second pressure-calculation map matches the delivery pressure of the hydraulic pump calculated on the basis of the supply-pressure-calculation map.

2. The construction machine according to claim 1 , further comprising:

a first-valve-position sensor that senses a valve position of the first meter-in valve; and

a second-valve-position sensor that senses a valve position of the second meter-in valve, wherein

the controller is further configured to:

calculate the valve position of the first meter-in valve from a sensing signal of the first-valve-position sensor on a basis of a first position-calculation map representing a characteristic of the first-valve-position sensor, and

calculate the valve position of the second meter-in valve from a sensing signal of the second-valve-position sensor on a basis of a second position-calculation map representing a characteristic of the second-valve-position sensor, and

the controller is further configured to:

actuate the first meter-in valve in a state in which the first and second meter-out valves and the second meter-in valve are closed, and calibrate the first position-calculation map such that the valve position of the first meter-in valve calculated on the basis of the first position-calculation map when the first meter-in valve is at a minimum position becomes a minimum position, and the valve position of the first meter-in valve calculated on the basis of the first position-calculation map when the first meter-in valve is at a maximum position becomes a maximum position, or

actuate the second meter-in valve in a state in which the first and second meter-out valves and the first meter-in valve are closed, and calibrate the second position-calculation map such that the valve position of the second meter-in valve calculated on the basis of the second position-calculation map when the second meter-in valve is at a minimum position becomes a minimum position, and the valve position of the second meter-in valve calculated on the basis of the second position-calculation map when the second meter-in valve is at a maximum position becomes a maximum position.

3. The construction machine according to claim 1 , wherein

the controller is further configured to:

actuate the bleed-off valve in a state in which the first and second meter-out valves and the second meter-in valve are closed and in which the first meter-in valve is opened, and calibrate the first pressure-calculation map such that the pressure of the first oil chamber calculated on the basis of the first pressure-calculation map matches the delivery pressure of the hydraulic pump calculated on the basis of the supply-pressure-calculation map, or

actuate the bleed-off valve in a state in which the first and second meter-out valves and the first meter-in valve are closed and in which the second meter-in valve is opened, and calibrate the second pressure-calculation map such that the pressure of the second oil chamber calculated on the basis of the second pressure-calculation map matches the delivery pressure of the hydraulic pump calculated on the basis of the supply-pressure-calculation map.

4. The construction machine according to claim 1 , wherein the supply-pressure sensor is installed on a hydraulic line portion of a hydraulic line connecting the hydraulic pump and the first or second meter-in valve, the hydraulic line portion excluding a hydraulic line portion connecting the hydraulic pump and the bleed-off valve.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 9, 2020
From: MORIKI, HIDEKAZU; CHIBA, TAKAAKI; IMURA, SHINYA
To: HITACHI CONSTRUCTION MACHINERY CO., LTD.
Reel/Frame 053163/0014 →
Priority Claims (1)
JP JP2018-002651 · Jan 11, 2018 · national
Continuity (1)
Related Publication 20210071392A1 · Mar 11, 2021