IP Library › Granted Patent US 11,209,182
Granted Patent B2
US 11,209,182 · App. 16/335,855 · Granted Dec 28, 2021

System for air-conditioning and hot-water supply

Inventors: Hideo Chikami (Ostend, BE); Tim Coessens (Ostend, BE)
Assignees: DAIKIN INDUSTRIES, LTD.; DAIKIN EUROPE N.V.
F24F11/30F24F1/0003F24F5/0096F24F11/77F25B13/00F24F2110/10F24F2221/183F24F2221/54F25B2313/003F25B2313/02334F25B2500/27F25B2600/0251F25B2600/2515
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,209,182
App. No.
16/335,855
Granted
Dec 28, 2021
Kind
B2
Abstract

A system for air-conditioning and hot-water supply is configured to selectively perform a cooling operation and a heating operation. The system includes: an outdoor unit having a compressor and an outdoor heat exchanger; at least one or more indoor units each of which is connected to the outdoor unit and includes an indoor heat exchanger; a hot-water supply unit connected to the outdoor unit so as to be arranged in parallel to the at least one or more indoor units and including a refrigerant-water heat exchanger; and a controller configured to monitor an occurrence of a request for hot-water supply from the hot-water supply unit during the cooling operation performed at at least one of the indoor units, and then to start the heating operation. The controller is further configured to determine a time point to resume the cooling operation based on at least one of an outdoor temperature and a target temperature of at least one indoor unit in the heating operation.

Claims (22)

1. A system for air-conditioning and hot-water supply and configured to alternatively perform an air cooling operation and a water heating operation, comprising:

an outdoor unit having a compressor and an outdoor heat exchanger;

at least one or more indoor units each of which is connected to the outdoor unit and includes an indoor heat exchanger;

a hot-water supply unit connected to the outdoor unit so as to be arranged in parallel to the at least one or more indoor units and including a refrigerant-water heat exchanger; and

a controller configured to monitor an occurrence of a request for hot-water supply from the hot-water supply unit during the cooling operation performed at at least one of the indoor units, and then to start the water heating operation;

wherein

the controller is further configured to determine a time to resume said cooling operation based on an outdoor temperature and/or a target temperature of at least one indoor unit in said heating operation,

wherein

the controller is further configured to determine the time to resume said cooling operation so that a period of the water heating operation becomes shorter as the outdoor temperature is higher and/or as the target temperature of at least one indoor unit is lower.

2. The system for air-conditioning and hot-water supply according to claim 1 , wherein

the controller is further configured to perform said cooling operation until receipt of a signal from each of all indoor units in said cooling operation, and then to start said heating operation; and

the signal indicating that a current room temperature has reached a target temperature of a corresponding indoor unit.

3. The system for air-conditioning and hot-water supply according to claim 1 , wherein

the controller is further configured to determine the time to resume said cooling operation based on a difference between the outdoor temperature and any one of target temperatures of one or more indoor units which were in said cooling operation.

4. The system for air-conditioning and hot-water supply according to claim 1 , wherein

at least one of the indoor units includes a sensor within or on its housing, the sensor being configured to detect a room temperature.

5. The system for air-conditioning and hot-water supply according to claim 2 , wherein

the controller is further configured to determine the time to resume said cooling operation based on a difference between the outdoor temperature and any one of target temperatures of one or more indoor units which were in said cooling operation.

6. The system for air-conditioning and hot-water supply according to claim 2 , wherein

at least one of the indoor units includes a sensor within or on its housing, the sensor being configured to detect a room temperature.

7. The system for air-conditioning and hot-water supply according to claim 3 , wherein

at least one of the indoor units includes a sensor within or on its housing, the sensor being configured to detect a room temperature.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2019
From: CHIKAMI, HIDEO; COESSENS, TIM
To: DAIKIN INDUSTRIES, LTD.; DAIKIN EUROPE N.V.
Reel/Frame 048688/0934 →
Priority Claims (1)
EP 16190506 · Sep 23, 2016 · regional
Continuity (1)
Related Publication 20190257536A1 · Aug 22, 2019