IP Library › Granted Patent US 11,258,855
Granted Patent B2
US 11,258,855 · App. 14/886,542 · Granted Feb 22, 2022

System and method for analyzing and monitoring smart meter network communications

Inventor: Gary Wayne Sterkel (Plantation, FL)
Assignee: Florida Power & Light Company
H04L67/12G06F40/106H04L67/303G01R19/2513G01R22/063G01R22/10Y04S40/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,258,855
App. No.
14/886,542
Granted
Feb 22, 2022
Kind
B2
Abstract

A system and method that enable analysis and visualization of disparate data to provide actionable insight regarding a smart meter network are disclosed. In some implementations, smart meter grid dashboard functionality may provide an improved and integrated data view and enable dynamic investigations and actions based on smart meter analytics. A method of aggregating and displaying data relevant to operations of an AMI network may provide actionable insight into operation of the network, predict failures, and recommend remedial actions.

Claims (29)

1. A method comprising:

collecting metered utility usage data reported by plurality of meters monitoring a service provided through a metered utility distribution network;

selectively identifying additional data, the additional data comprising:

data associated with operation of delivering the service via the metered utility distribution network; and

historical data comprising at least one of a meteorological event or a natural disaster;

processing the metered utility usage data and the additional data to identify a problem related to operation of delivering the service via the metered utility distribution network;

predicting, based on the problem, a condition indicative of a failure of delivering the service via the metered utility distribution network as a function of the processing, and wherein the condition comprises a condition of the metered utility distribution network that is associated with the historical data;

determining formatting preferences associated with a display of an output indicative of the failure;

responsive to said processing and said determining and said predicting, transmitting the output and the formatting preferences; and

effectuating a preventative measure to minimize an effect of the condition.

2. The method of claim 1 wherein said effectuating a preventative measure comprises dispatching resources to a location associated with the condition.

3. The method of claim 1 , wherein the metered utility usage data comprises electrical power smart meter data.

4. The method of claim 1 , wherein the condition comprises propagation of a service outage of the metered utility distribution network.

5. A system for analyzing a metered utility distribution network, said system comprising:

a network infrastructure operative to collect metered utility usage data reported by plurality of meters monitoring a service provided through a metered utility distribution network; and

a server communicably coupled to said network infrastructure and operative to process the metered utility usage data and selectively identified additional data to identify a problem related to operation of delivering the service via the metered utility distribution network, wherein the additional data comprises historical data comprising at least one of a meteorological event or a natural disaster, and

the server further operative to predict, based on the problem, an anticipated condition indicative of a failure of delivering the service via the metered utility distribution network as a function of the processing, and wherein the condition comprises a condition of the metered utility distribution network that is associated with the historical data;

said server comprising an application operative to produce an output indicative of the failure and a dashboard operative to determine formatting preferences associated with a display of the output;

wherein the server is further operative to transmit the output and the formatting preferences to a remote device; and

wherein said application is further operative to effectuate a preventative measure to minimize an effect of the anticipated condition.

6. The system of claim 5 wherein said application is further operative to dispatch resources to a location associated with the anticipated condition.

7. A non-transitory computer-readable storage medium encoded with data and instructions comprising an application which, when executed on a processor, is configured to perform an operation comprising: selectively identifying additional data, the additional data comprising:

data associated with operation of delivering the service via the metered utility distribution network; and

historical data comprising at least one of a meteorological event or a natural disaster;

processing the metered utility usage data and the additional data to identify a problem related to operation of delivering the service via the metered utility distribution network;

predicting, based on the problem, an anticipated condition indicative of a failure of delivering the service via the metered utility distribution network predicted as a function of the processing, and wherein the condition comprises a condition of the metered utility distribution network that is associated with the historical data;

determining formatting preferences associated with a display of an output indicative of the failure;

responsive to said processing and said determining, transmitting the output and the formatting preferences; and

wherein the operation further comprises effectuating a preventative measure to minimize an effect of the anticipated condition.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 7, 2022
From: STERKEL, GARY WAYNE
To: FLORIDA POWER & LIGHT COMPANY
Reel/Frame 058574/0691 →
Continuity (2)
Provisional Application 62065381 · Oct 17, 2014
Related Publication 20160109495A1 · Apr 21, 2016