IP Library Granted Patent US 11,286,719
Granted Patent B2
US 11,286,719 · App. 16/592,226 · Granted Mar 29, 2022

Systems and methods for controlling a drilling path based on drift estimates

Inventors: Todd W. Benson (Dallas, TX); Teddy Chen (Austin, TX); Sashmit Bhaduri (Austin, TX)
Assignees: Motive Drilling Technologies, Inc.; Board of Regents, The University of Texas System
E21B7/06E21B7/04E21B7/10E21B44/00E21B45/00E21B47/022E21B47/024E21B47/026E21B47/06E21B47/09E21B47/10E21B47/12E21B47/18G05B13/042G05B15/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,286,719
App. No.
16/592,226
Granted
Mar 29, 2022
Kind
B2
Abstract

In a drilling system, a control system coupled to a drilling rig controls a bottom hole assembly (BHA) to drill a borehole through a geological formation along a drilling path. The control system determines a present position of the BHA and calculates a toolface vector to create a convergence path from the present position of the BHA to a desired target path. The control system also receives geological information and compensates the toolface vector to account for an estimated geologic formation drift. The control system causes at least one control parameter to be modified in order to alter a drilling direction of the BHA based on the calculated toolface vector and transmits the at least one control parameter to the drilling rig to target the BHA in accordance with the calculated toolface vector. The control system iteratively performs this process until convergence with the desired target path is achieved.

Claims (43)

1. A method for controlling a drilling operation, comprising:

(a) determining, by a computer system coupled to a drilling rig, a present position of a bottom hole assembly (BHA) in a borehole;

(b) calculating, by the computer system, a toolface vector needed for the borehole to converge with a desired target path;

(c) determining, by the computer system, a compensated toolface vector that is responsive to the toolface vector and a geological formation drift estimate vector corresponding to a trajectory bias for the BHA within a geological formation observed while drilling along a straight path;

(d) orienting the BHA and drilling the borehole responsive to the compensated toolface vector; and

(e) repeating steps (a)-(d) until the borehole converges with the desired target path.

2. The method of claim 1 , wherein the toolface vector is calculated using information comprising build rate, present error vector, and well plan information.

3. The method of claim 2 , wherein the calculating the toolface vector step further comprises the steps of:

determining, by the computer system, a look ahead point that is a fixed distance ahead of the BHA; and

calculating, by the computer system, a direction of drilling toward the look ahead point.

4. The method of claim 3 , wherein the compensated toolface vector is determined responsive to a formation drift associated with a geological formation in which the BHA is located.

5. The method of claim 3 , further comprising the steps of:

performing a slide operation and a rotate operation to move the BHA along the compensated toolface vector.

6. The method of claim 1 , wherein the geological formation drift estimate vector is responsive to a geological formation drift calculation from a recent drilling operation.

7. The method of claim 1 , wherein the orienting the BHA step is performed according to a plan for sliding activity.

8. The method of claim 7 , wherein the plan for sliding activity is responsive to BHA wear.

9. The method of claim 7 , wherein the plan for sliding activity is responsive to when a next drill string pipe connection will occur.

10. The method of claim 1 , wherein the calculating the toolface vector step further comprises the steps of:

determining a plurality of potential toolface vectors corresponding to a plurality of potential drill paths; and

selecting the toolface vector from the plurality of potential toolface vectors according to which of the plurality of potential drill paths satisfies a drilling need.

11. The method of claim 10 , wherein the drilling need comprises a cost factor.

12. The method of claim 10 , wherein the drilling need comprises a total vertical depth error.

13. A drilling system, comprising:

a control system for generating steering control signals to control a bottom hole assembly (BHA), wherein the control system further comprises executable instructions to:

(a) determine a present position of the BHA within a borehole being drilled;

(b) calculate a toolface vector needed for the borehole to converge with a desired target path;

(c) determine a compensated toolface vector that is responsive to the toolface vector and a geological formation drift estimate vector corresponding to a trajectory bias for the BHA within a geological formation observed while drilling along a straight path;

(d) cause at least one control parameter to be modified in order to alter a drilling direction of the BHA in accordance with the compensated toolface vector;

(e) transmit the at least one control parameter to a drilling rig to drill the borehole in accordance with the compensated toolface vector; and

(f) repeat steps (a)-(e) until the borehole converges with the desired target path.

14. The drilling system of claim 13 , wherein the toolface vector is calculated using information comprising build rate, present error vector, and well plan information.

15. The drilling system of claim 14 , wherein the control system calculates the toolface vector by

determining a look ahead point that is a fixed distance ahead of the BHA; and

calculating a direction of drilling toward the look ahead point.

16. The drilling system of claim 15 , wherein the compensated toolface vector is determined responsive to a formation drift associated with a geological formation in which the BHA is located.

17. The drilling system of claim 13 , wherein the geological formation drift estimate vector takes into account a geological formation drift calculation from a recent drilling operation.

18. The drilling system of claim 13 , wherein the executable instructions to calculate the toolface vector step further comprise instructions to:

determine a plurality of potential toolface vectors corresponding to a plurality of potential drill paths; and

select the toolface vector from the plurality of potential toolface vectors according to which of the plurality of potential drill paths comprises a lowest cost alternative.

19. The drilling system of claim 13 , wherein the executable instructions to calculate the toolface vector step further comprise instructions to:

determine a plurality of potential toolface vectors corresponding to a plurality of potential drill paths; and

select the toolface vector from the plurality of potential toolface vectors according to which of the plurality of potential drill paths comprises a total vertical depth error correction.

20. The drilling system of claim 13 , wherein the at least one control parameter further comprises parameters associated with a slide operation and a rotate operation to move the BHA along the compensated toolface vector.

Continuity (6)
Continuation 15068222 · Mar 11, 2016
Continuation 14677648 · Apr 2, 2015
Continuation In Part 14095073 · Dec 3, 2013
Continuation 13530298 · Jun 22, 2012
Continuation In Part 13334370 · Dec 22, 2011
Related Publication 20200040657A1 · Feb 6, 2020
Cited By (4)
US 12,196,069 US 12,203,361 US 12,297,736 US 12,595,730