Dynamic gauges for displaying present and predicted machine status
A facility creates a dynamic gauge for indicating the status of equipment. The facility causes a gauge to be displayed with an initial satisfactory range and an initial unsatisfactory range. The facility accesses historical data describing the status of a sensor attached to equipment. The facility determines a new satisfactory range and a new unsatisfactory range, and alters the gauge to visually indicate the new satisfactory range and the new unsatisfactory range.
1. A system to create a dynamic gauge for equipment, the system comprising:
a computing device;
a gauge array including a gauge, the gauge being capable of indicating a range of values and being adapted to visually indicate an initial satisfactory sub-range of the gauge's range of values, the initial satisfactory sub-range being based on an initial condition of the equipment;
a memory adapted to store historical data, wherein the historical data includes data describing operational history of the equipment;
the computing device being adapted to automatically determine a new satisfactory sub-range based on the historical data, and
the gauge being adapted to be updated automatically by the computing device to visually indicate the new satisfactory sub-range.
2. The system of claim 1 , wherein the computing device determines a new satisfactory sub-range by performing time-based statistical analysis of the historical data.
3. The system of claim 1 , wherein the computing device is further adapted to:
periodically determine the new satisfactory sub-range by:
receiving additional historical data; and
determining a new satisfactory sub-range based on at least the additional historical data.
4. The system of claim 1 , wherein the computing device is further adapted to:
receive current operational data of the equipment; and
determine a new satisfactory sub-range based on the historical data and current operational data.
5. The system of claim 1 , wherein the computing device is further adapted to:
receive current operational data of the equipment; and
update the gauge to visually indicate the current operational data of the equipment.
6. The system of claim 5 , wherein the computing device is further adapted to:
determine a new satisfactory sub-range based on the historical data and current operational data by:
applying to the current operational data a machine learning model trained to predict a satisfactory sub-range based on the historical data to generate the new satisfactory sub-range.
7. The system of claim 5 , wherein the computing device is further adapted to:
determine a new satisfactory sub-range based on the historical data and current operational data by:
training a machine learning model to predict a satisfactory range sub-range based on the historical data; and
applying to the current operational data the machine learning model trained to predict a satisfactory sub-range based on the historical data to generate the new satisfactory sub-range.
8. A method in a computing device, the method comprising:
causing a gauge array to be displayed, the gauge array including a gauge capable of indicating a range of values and being adapted to visually indicate an initial satisfactory sub-range of the gauge's range of values, the initial satisfactory sub-range being based on an initial condition of equipment;
accessing historical data, wherein the historical data includes data describing operational history of the equipment;
automatically determining a new satisfactory sub-range based on the historical data; and
automatically updating the gauge to visually indicate the new satisfactory sub-range.
9. The method of claim 8 , wherein determining a new satisfactory sub-range further comprises:
applying time-based statistical analysis to the historical data.
10. The method of claim 8 , further comprising:
periodically determining the new satisfactory sub-range by:
receiving additional historical data; and
determining a new satisfactory sub-range based on at least the additional historical data.
11. The method of claim 8 , further comprising:
receiving current operational data of the equipment; and
updating the gauge to visually indicate the current operational data of the equipment.
12. The method of claim 8 , further comprising:
receiving current operational data of the equipment; and
determining the new satisfactory sub-range based on the historical data and current operational data.
13. The method of claim 12 , further comprising:
determining the new satisfactory sub-range based on the historical data and current operational data by:
applying the current operational data to a machine learning model trained to predict a satisfactory sub-range based on the historical data to generate the new satisfactory sub-range.
14. The method of claim 12 , further comprising:
determining the new satisfactory sub-range based on the historical data and current operational data by:
training a machine learning model to predict a satisfactory sub-range based on the historical data; and
applying the current operational data to a machine learning model trained to predict a satisfactory range sub-range based on the historical data to generate the new satisfactory range sub-range.
15. One or more memories collectively configured to cause a computing device to perform a method, the method comprising:
causing a gauge array to be displayed, the gauge array including a gauge capable of indicating a range of values and being adapted to visually indicate an initial satisfactory sub-range of the gauge's range of values, the initial satisfactory sub-range being based on an initial condition of equipment;
accessing historical data, wherein the historical data includes data describing operational history of the equipment;
automatically determining a new satisfactory sub-range based on the historical data; and
automatically updating the gauge to visually indicate the new satisfactory sub-range.
16. The method of claim 15 , wherein determining a new satisfactory sub-range further comprises:
applying time-based statistical analysis to the historical data.
17. The method of claim 15 , further comprising:
periodically determining the new satisfactory sub-range by:
receiving additional historical data; and
determining a new satisfactory sub-range based on at least the additional historical data.
18. The method of claim 15 , further comprising:
receiving current operational data of the equipment; and
updating the gauge to visually indicate the current operational data of the equipment.
19. The method of claim 15 , further comprising:
receiving current operational data of the equipment; and
determining the new satisfactory sub-range based on the historical data and current operational data.
20. The method of claim 19 , further comprising:
determining the new satisfactory sub-range based on the historical data and current operational data by:
applying to the current operational data a machine learning model trained to predict a satisfactory sub-range based on the historical data to generate the new satisfactory sub-range.
21. The method of claim 19 , further comprising:
determining the new satisfactory sub-range based on the historical data and current operational data by:
training a machine learning model to predict a satisfactory sub-range based on the historical data; and
applying to the current operational data a machine learning model trained to predict a satisfactory sub-range based on the historical data to generate the new satisfactory sub-range.